Title Page
-
Audit Title
-
Add media
-
This inspection covers the following:
- Pre-start/Earthworks
- Floor Down
- Framing
- Closed In
- Exterior Cladding
- Internal Linings
- Grounds
- Gib Stopping
- internal Fit out/Paint
- Interior Fixtures & Fittings
- Pre-Final
-
AK number
-
BCO Number
-
Conducted on
-
Construction Manager
- Rob Chisholm
- Mike Mckinlay
- Ross Barritt
- Peter Zovoko
- Priya Kim
- Tony Goulding
- William Shin
- Simon Sheehan
- Cody McEaney
- Colin Bertram
- John Hay
- Lee Giles
- Mark Vincent
-
Personnel attending inspection
- Rob Chisholm
- Mike Mckinlay
- Ross Barritt
- Peter Zovoko
- Priya Kim
- Tony Goulding
- William Shin
- Simon Sheehan
- Cody McEaney
- Colin Bertram
- John Hay
- Lee Giles
- Mark Vincent
Earthworks
Pre-start/Earthworks
-
Access to site is clear
-
Add media
-
No overhead power lines obscuring access
-
Add media
-
Services connected to boundary
-
Add media
-
Hazard sign & safety box erected
-
Add media
-
Fence is erected with no gaps
-
Add media
-
Temporary water connected
-
Add media
-
Builders temp power connected
-
Add media
-
Retaining wall complete
-
Add media
-
Temp. fencing on walls over 1m
-
Add media
-
All excess spoil and rubbish removed
-
Add media
-
Silt control in place
-
Add media
-
Excavation heights correct
-
Add media
-
Temporary driveway formed
-
Add media
-
Roads and paths free of debris
-
Add media
-
Geotech inspection PS4 received
-
Add media
-
Is follow up required?
-
Follow up required by:
- Rob Chisholm
- Mike Mckinlay
- Ross Barritt
- Peter Zovoko
- Priya Kim
- Tony Goulding
- William Shin
- Simon Sheehan
- Cody McEaney
- Colin Bertram
- John Hay
- Lee Giles
- Mark Vincent
-
Date follow up required by:
-
Add signature
Floor Down
-
Portaloo/s on site
-
Add media
-
Slab correct with boundary’s
-
Add media
-
Surveyed floor level correct
-
Add media
-
Brick and Garage door rebate/s completed
-
Add media
-
Pods and steel installed as per plan
-
Add media
-
All excess spoil and rubbish removed
-
Add media
-
Variations completed, signed and uploaded
-
Add media
-
Boxing removed with no damage to slab
-
Add media
-
Saw cuts as per plan
-
Add media
-
Council inspection pre-pour passed
-
Add media
-
Engineer inspection passed PS4 received
-
Add media
-
Under slab plumbing & drainage location checked
-
Add media
-
Electrical conduit installed
-
Add media
-
Bin on site in suitable location
-
Add media
-
No Damage to kerbs, gardens or foot paths
-
Add media
-
Concrete finish smooth with no honeycombing
-
Add media
-
Garage door rebate neat and tidy
-
Add media
-
Shower rebate accurate and finish neatly
-
Add media
-
Services run to house: Telecom,Power, Water
-
Add media
-
As-Built drainage plans received
-
Add media
-
Under-slab as-built received
-
Add media
-
Drainage complete, risers plumb & in correct position
-
Add media
-
Roads, paths & gardens free of debris & rubbish
-
Add media
-
Is follow up required
-
Follow up required by
- Rob Chisholm
- Mike Mckinlay
- Ross Barritt
- Peter Zovoko
- Priya Kim
- Tony Goulding
- William Shin
- Simon Sheehan
- Cody McEaney
- Colin Bertram
- John Hay
- Lee Giles
- Mark Vincent
-
Date follow up required by
-
Add signature
Framing
-
GF frames erected, fixed down, straightened, square,braced
-
Add media
-
Top plate packer installed
-
Add media
-
Door & window openings straight, plumb & level
-
Add media
-
Safety nets installed as per requirements
-
Add media
-
Mid floor joists/flooring installed - no squeaks, glued and screwed
-
Add media
-
1st floor frames erected, fixed down, straightened, square,braced
-
Add media
-
Top plate packer installed
-
Add media
-
Door & window openings straight, plumb & level
-
Add media
-
Safety nets installed as per requirements
-
Add media
-
Mid floor joists/flooring installed - no squeaks, glued and screwed
-
Add media
-
2nd floor frames erected, fixed down, straightened, square,braced
-
Add media
-
Top plate packer installed
-
Add media
-
Door & window openings straight, plumb & level
-
Add media
-
Safety nets installed as per requirements
-
Add media
-
Trusses erected as per plan
-
Add media
-
All roofing nogs, fly rafters, Valley, etc complete
-
Add media
-
All ceiling & internal nogs completed (including garage door, vanity, handrail, wc roll etc)
-
Add media
-
All bracing elements/hold-downs installed correctly & complete
-
Add media
-
Soffit framing, ribbon plate & sprockets completed
-
Add media
-
Structural steel installed
-
Add media
-
Engineer PS4 received for structural steel
-
Add media
-
Scaffold erected as per specification. Tagged
-
Add media
-
Sheet bracing installed (external)
-
Add media
-
Columns/posts installed
-
Add media
-
Purlins installed as per plans
-
Add media
-
Excess material removed or neatly stacked
-
Add media
-
House swept with all rubbish removed
-
Add media
-
All Council inspections passed
-
Add media
-
Variations completed, signed and uploaded
-
Add media
-
Is follow up required
-
Follow up required by
- Rob Chisholm
- Mike Mckinlay
- Ross Barritt
- Peter Zovoko
- Priya Kim
- Tony Goulding
- William Shin
- Simon Sheehan
- Cody McEaney
- Colin Bertram
- John Hay
- Lee Giles
- Mark Vincent
-
Date follow up required by:
-
Add signature