Page 1: Initial questions
-
Conducted on
-
Prepared by
-
Location
Weekly Equipment Park-up Area
-
All chemicals and oils stored correctly and bunded
-
Are all vehicles parked correctly
-
All waste disposed of correctly and sufficient bins available
-
Is park-up area in a suitable condition for pedestrians and vehicles
Weekly Inspection of WCF
-
Are the roads in good condition
-
Inspect all active ash cells and identify any potential problem areas.
-
Are all materials stored safely and securely
-
Are all chemicals and oils stored correctly
-
Identify areas where slashing is required and add to next week schedule
Monthly WCF Inspection (in addition to weekly inspection)
-
Are all fire breaks servicable
-
Are all evaporation pond bands & drains in good condition
-
Are the clean water and dirty water drains free from erosion & damage
Signature
-
Add signature