Title Page
-
Inspection Reference Number
-
Acceptable Score - 75%
-
Inspection Date and Time
-
Inspector Name
- Kumar Karki
- Ramesh Bhandari
- Niranjan Kharel
- Bishnu Poudel
- Rahul Garg
- Hasnain Kadri
- Khokhon Shajahan Ali
- Chanduru Kumaran
-
Line
-
Train Number
-
Train Number
-
Location
Documentation & Staff
-
Documentation (MP&I, COSHH/SDS, Tool Box Talk, Checklist, Tag, Record)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staff Appearance (Uniform, PPE) And Personal Hygiene
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Train Interior
-
Ceilings, Ac Vents, Lighting Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Walls, Display Screens/Signage/Maps)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Glass Windows
- 1
- 2
- 3
- 4
- 5
- N/A
-
Passenger Doors
- 1
- 2
- 3
- 4
- 5
- N/A
-
Palm Handrails/Grips, Emergency Handle
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seats)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
-
Pest Treatment
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Train Exterior
-
Exterior All Vertical And Horizontal Finishes (Wall, Window, Glass, Roof)
- 1
- 2
- 3
- 4
- 5
- N/A
Signature
-
Signature