Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Contractor on site

SECTION 1. SITE DETAILS

  • Audit Number

  • Audit Title

  • Site Address Being Audited
  • Analyst Being Audited

  • Date of Audit

  • Location Air Monitoring Sampling

  • Type of Air Monitoring

  • Site Job Number

SECTION 2. DOCUMENTATION CHECK

  • Has the analyst reviewed the method statement, risk assessment, COSHH on site?

  • Analysts guide HSG248 on site?

  • Analyst company in-house procedures on site?

  • Has a site specific risk assessment been carried out? (Check Analysts PDA)

SECTION 3. STAGE 1 Site Setup and Assessment

  • Does the Analyst have all necessary equipment available

  • Has the Analyst Checked Transit Route

  • Has the Analyst inspected areas surrounding the - Enclosure,Van and Skip

  • Has the Analyst inspected Enclosure,Vision Panel placement or CCTV

  • Has the Analyst checked the DCU

  • Has the Analyst inspected contractors on site decontamination equipment

  • Has Analyst taken sufficient amount of photographs?

SECTION 4. STAGE 2 Visual Inspection

  • Is the analyst wearing app appropriate PPE/RPE?

  • Does the Analyst have all the necessary equipment ( Torch,Flexible Mirror,Screwdriver,Wet Wipes and Camera)

  • Has the Analyst witnessed the Site Supervisor conduct visual inspection?

  • Has the analysts inspected enclosure and air locks for debris

  • Has the Analyst checked surfaces of remaining plant/equipment in the Enclosure? (Use of Wet Wipes or Visual)

  • Has the analyst recorded findings to wether enclosure is dry?

  • Has the analyst inspected integrity of Enclosure?

  • Did the Analyst conduct the visual inspection for the recommended length of time? (Record Time)

  • Has Analyst taken sufficient amount of photographs?

  • When the analyst left the enclosure after Stage 2 have they carried out the correct decontamination procedure?

SECTION 5. EQUIPMENT SETUP AND CHECKS

  • Is the equipment in use calibrated, labelled and in good order?

  • Has the Analyst allowed the Air Sampling pump to stabilise?

  • Has the Analyst calibrated the flow meter using the master flowmeter

  • Has the Analyst checked the Flow rate to ensure the correct amount of air is being pulled through the pump

  • Has the Analyst started the calibrated timepiece to record pump run?

SECTION 6. CALIBRATED EQUIPMENT

  • Microscope (serviced) - Ref I.D

  • In Calibration?

  • Stage Micrometer - Ref I.D

  • In Calibration?

  • NPL test slide - Ref I.D

  • In Calibration?

  • High Flow Meter - Ref I.D

  • In Calibration?

  • Low Flow Meter - Ref I.D

  • In Calibration?

  • Tally Counters - Ref I.D

  • In Calibration?

  • Barometer - Ref I.D

  • In Calibration?

  • Thermometer - Ref I.D

  • In Calibration?

  • Timer - Ref I.D

  • In Calibration?

SECTION 7. NON CALIBRATED EQUIPMENT

  • Does all relevant equipment have a valid PAT test?

  • Does the analyst have an adequate number of high flow pumps to carry out suitable air monitoring?

  • Does the analyst have a low flow (personal) pump?

  • Does the analyst have and adequate number of cowl heads to carry out suitable air monitoring?

  • Does the analyst have an acetone vaporiser?

  • Does the analyst have a calculator?

  • Does the analyst have adequate supplies of slides, cover lips and filters?

  • Does the analyst have spare equipment in case of emergencies? (Fuses 3A/13A, bulbs, mask filters?)

  • Does the analyst have sufficient acetone/triacetin?

SECTION 8. STAGE 3 Air Sampling

  • Is the analyst wearing app appropriate PPE/RPE?

  • Has the Analyst confirmed NPU is capped and switched off?

  • Has the analyst removed all non essential work items from the enclosure?

  • Has the Analyst placed the correct number of pumps in relation to the enclosure size?

  • Has a disturbance been carried out using a brush? (1.5 minutes per pump up to a max of 5 mins)

  • Has the Analyst confirmed the full run time and the flow rate has been maintained?

  • When the analyst left the enclosure after Stage 3 have they carried out the correct decontamination procedure?

SECTION 9. STAGE 4 Enclosure Dismantling

  • Has the Analyst witnessed the Dismantling of the Enclosure.

  • Has the Analyst checked the area to ensure it is free of debris after dismantling?

  • Has the Analyst checked waste routes and areas surrounding skips and vans?

  • Has the Air Test Interface been complete in full on the PDA?

  • Has the Certificate of Reoccupation been filled out correctly (Calculations and all entries need to be checked)

  • Has the analyst took sufficient amount of photographs?

SECTION 10. DCU CLEARANCE

  • Has the Analyst checked the DCU to ensure contractor has cleaned prior to Air Clearance?

  • Has the Analyst carried out the correct number of sample to the DCU (<10m2 = 1 - >10m2 = 2)

  • Has the Analyst carried out the equipment checks as section 5

Q.C.

  • Have the correct version of forms been used? (Check version on document index)

Auditor Sign Off

  • Assessment/Audit Satisfactory

  • Analyst Approved?

  • Specify date of re-assessment

  • Note: if no then document details of discussion/training that has taken place.

  • Comments

  • Any comments, Is there requirements for the analyst to be retrained in any areas?

  • Auditor Signature

  • Analyst Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.