Title Page

  • Project:

  • Client

  • Project Manager(s)

  • Conducted on

  • This inspection report should verify that all siding and accessories are being installed per manufacturer's installation instructions and project plans & specifications. Follow up is required for any deficiencies noted. Forward documentation (I.e. Photos, written report(s), etc.) once deficiencies are corrected to QC Admin.

  • Subcontractor doing the work:

  • Type of siding inspected:

  • Elevation:

  • Submit this report with photos daily for the first (5) days an activity is taking place and (1) time per week thereafter until scope is complete.

  • 1. Kick out flashings installed where required:

  • 2. Penetrations have all been sealed per the manufacturer's installation instructions, caulking & tape are approved by Tyvek or manufacturer of building wrap:

  • 3. Drip cap installed over all window and door locations (sealed to Tyvek):

  • 4. Fasteners used are per specifications:

  • 5. Proper flashings at inside corners, windows, doors, and at dissimilar materials:

  • 6. Installation is allowing for lumber shrinkage at windows, doors, and at dissimilar materials:

  • 7. Metal flashing seams/overlaps are sealed per specifications:

  • 8. Metal flashings have positive drainage away from building and have allowed for lumber shrinkage:

  • 9. Specific deck flashings per project requirements:

  • 10. HVAC units (i.e. Magicpaks, etc.) have been flashed per plan and spec:

  • 11. Drainage wrap inspection has taken place prior to siding installation starting:

  • 12. Cut siding and trim edges are sealed with approved paint or sealant:

  • 13. Siding has required clearance from grade, roof, patios, decks, windows, and doors:

  • 14. Siding has proper clearance from trim to allow for sealant installation:

  • 15. Trim materials have weather cuts:

  • 16. Trim blocks are used around penetrations greater than 1-1/2":

  • 17. Inside corners have metal flashing over building wrap if specified:

  • 18. Respond yes if the crew or foreman HAS NOT changed:

  • If the crew or foreman has changed, stop work and review the project plans and specifications, manufacturers specifications and the pre-installation meeting minutes. Please note action taken:

  • Comments:

  • 19. Document work in progress with (2) or more photos for the first 5 days of activity taking place. After the first 5 days, (2) or more photos to be taken per week. <br><br>Photos have been taken and submitted to QA Admin:

  • Additional items to check from pre-install meeting

  • A.

  • Was this completed or did it pass inspection?

  • B.

  • Was this completed or did it pass inspection?

  • C.

  • Was this completed or did it pass inspection?

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.