Information
-
Document No. 01
-
Conducted on
-
Prepared by: CLG
Site Information
-
Bam Whittington Hospital
-
Job Reference: BAM HLN0285
Contractor issuing notice on behalf of the Principle Contractor
-
CLG
-
Package reference:
Contractor notice is issued to
-
Request Issued to:
-
Company Issued to:
Contractual Obligation
-
We remind you of your contractual obligation to keep your work area clear of rubbish, materials ect to ensure safe and sufficient working of this contract. To comply with this obligation you are requested to immediately remove your rubbish ect from the following areas and place it in bins / skips provided
Health & Safety Risk
-
In the event of rubbish, materials ect from the above mentioned contractor poses a health & safety risk area will immediately be cleared by Construction Logistics Group and the relevant charges will be passed on (Examples of such instances are blocked staircases, blocked fire exit routes, debris laying around ect)
-
Do the items pose an immediate health & safety risk?
Location, photos and details of areas that require improvement
-
Level
- Basement 1
- Loading Bay
- Level 1
- Level 2
- Level 3
- Level 4
- Level 5
- Level 6
- Roof
- Level 7
- Level 8
- Ground floor
- Level 9
- Level 10
- Level 11
- Level 12
- Level 13
- Level 14
undefined
-
Pictures
-
undefined
Time frame given to complete improvement notice
-
If you fail to comply with this notice within "selected timeframe below" others will remove it and you will be charged the full cost of the removal operation. The Principle Contractor will not be held responsible for any damages caused during the cleanup operation
-
Time Frame
- 1 Hour
- 2 Hours
- 3 Hours
- 4 Hours
- 5 Hours
- 6 hours
- 8 Hours
- 12 Hours
- 24 Hours
- 36 hours
- Close of business
Contra Charge Estimate
-
Estimated time and labour required to complete the "improvement notice" should the selected contractor fail to comply with the issued "improvement notice" (This will be used for the contra charge)
-
Labour Required
- Ganger
- Labourer x 1
- Labourer x 2
- Labourer x 3
- Labourer x 4
- Labourer x 5
- Labourer x 6
- Labourer x 7
- Labourer x 8
- Labourer x 9
- Labourer x 10
- Welfare
- Hoist driver
- Forklift driver
- Carpenter
- Logistics Manager
- Scissor Lift Driver
- 12y skip
- 20y skip
- Hardboard sheets x20
- Logistics manager
-
-
Time Required
- 1 Hour
- 2 Hours
- 3 Hours
- 4 Hours
- 5 Hours
- 6 Hours
- 7 Hours
- 8 Hours
- 9 Hours
- 10 Hours
Confirmation of action by Subcontractor
-
Add signature
-
Please note: Failure to comply with this notice with this section "signed off" will result in costs still being charged
Confirtmation of action by CLG
-
Logistics Manager Name
-
Name of Signee
-
-
-