Information

  • Purchase Order Number

  • Customer

  • Location
  • Conducted on

  • Senior Technician

  • Other Personel

  • Was the system/outdoor unit installed as per plan?

  • Did the electrical contractor arrange location change before we (MTAC Services) were onsite?

  • Name of electrical contractor -

  • Details -

  • Was the salesperson/warehouse informed and did they approve?

  • Name of salesperson whom approved location change -

  • Salesperson's Name -

  • Was the customer informed and did they approve?

  • Details -

  • Does the outdoor unit have adequate ventilation?

  • Details -

  • Was the system purged and pressure tested with nitrogen?

  • Pressure tested to (Kpa) -

  • For how many minutes?

  • Was the system evacuated using a vacuum pump to a minimum of 500 microns?

  • Were we (MTAC Services) the last trade onsite?

  • Was the unit put through a test run?

  • Details -

  • Error Code Details -

  • Details -

  • Was the customer instructed on how to use their new air conditioner?

  • Was a customer home @ time of completion?

  • Details -

  • HAVE ALL ROOF TILES/ROOF SHEETS BEEN PUT BACK IN PLACE?

  • Were the other trades still working. If so, who?

  • Details -

  • Photo of outdoor unit.

  • Photo(s) of anything worth documenting.

  • Has all rubbish relevant to us/our work been removed?

  • We have left the work place free from mess.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.