Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Carpentry

  • Are forms properly installed?

  • Are forms properly oiled with releasing agent?

  • Are all ties and kickers in place to prevent blowout?

Rebar

  • Are all bars spaced properly?

  • Are the clearances from forms to bars acceptable and in tolerance?

  • Are all embeds in place and in the right location?

  • Is there proper spacing between embeds and bolts?

  • Are all bars installed per detail drawings and submittals?

  • Are all bar ties installed properly and are all bars tied?

Drawings, Submittals, and Details Below

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.