Title Page

  • Evo Net No.

  • PSF No.

  • Address/ Plot No.

  • Inspection Conducted/Completed on

  • Inspection Completed by

  • Date of Installation

  • Specification (Type of Windows and Doors)

  • Fitting Team

  • Have all windows/ doors been fitted as per standard site fitting instructions (150mm fixings from corners & 300mm centres from there, window fitted plumb and square)

  • Has there been an EPDM fitted on the windows?

  • Have all keys for windows/ doors been handed to a representative of the site team?

  • Please take a picture of all windows and doors internally

  • Comments

  • Please take a picture of all windows and doors externally

  • Comments

  • Add pictures of any damages or issues occurred on-site

  • Comments on damages or issues on-site

  • CMS Sign Off

  • Site Team Representative Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.