Title Page

  • Project:

  • Document Number:

  • Conducted on

  • Prepared by

  • Location
  • Week Number:

  • After week 30 a detailed report is required for all Quality Audit information. Please notify the Senior Project Manager and issue.

  • Week Ending Date:

Site Attendance

Site Attendance W.C Monday

  • Project Manager:

  • Dry Liner

  • Plaster/ Jointer

  • Labourer

  • Supervisor

Site Attendance Tuesday

  • Project Manager:

  • Dry Liner

  • Plaster/ Jointer

  • Labourer

  • Supervisor

Site Attendance Wednesday

  • Project Manager:

  • Dry Liner

  • Plaster/ Jointer

  • Labourer

  • Supervisor

Site Attendance Thursday

  • Project Manager:

  • Dry Liner

  • Plaster/ Jointer

  • Labourer

  • Supervisor

Site Attendance Friday

  • Project Manager:

  • Dry Liner

  • Plaster/ Jointer

  • Labourer

  • Supervisor

Site Attendance Saturday

  • Project Manager:

  • Dry Liner

  • Plaster/ Jointer

  • Labourer

  • Supervisor

Site Attendance Sunday

  • Project Manager:

  • Dry Liner

  • Plaster/ Jointer

  • Labourer

  • Supervisor

Site Report

  • Has the relevant toolbox talk been carried out?

  • Has there been any issue with Health and Safety compliance?

  • Are the areas clean, tidy and clear of all trips, slips and falls?

  • Why are the areas left unsafe?

Plant

  • Have all podiums been checked and signed every 7 days?

  • Please select all podiums that have been signed off fit for use

  • Have all pallet trucks been checked for damage, ensure that all lifting equipment is stored correct and chained up at the end of the day?

Design

  • Are there any outstanding Requests for Information?

  • Is there any critical design information that is required that is holding up progress?

  • Are there any verbal instructions that require action?

  • What verbal instructions require action?

  • Drylining Works Progress
  • Level:

  • What is the percentage of SFS complete?

  • What is the percentage of 1st fix partitioning complete

  • What is the percentage of 2nd fix partitioning complete

  • What is the percentage of 1st fix ceilings complete

  • What is the percentage of 2nd fix ceilings complete

  • What is the percentage of plastering/ tape jointing complete

  • Comments
  • Date:

  • Comments:

  • Signed:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.