Title Page
-
TOW No.
-
Haircut/haircut & Seal/ Remake?
-
Client / Site
-
Conducted on
-
Prepared by
-
Location:
-
Personnel
CNI Joint Audit.
-
Pit and surrounds clean of joint debri?
-
Joint Supported?
-
Suitable Conductor length?
-
Pressure test pass?
-
Correct size, Signed and dated silica bag?
-
Correct connectors used? (MBYB/MRC=CRQ)
-
Onion Bags?
-
Collets used correctly?
-
Sealant installed to standard for cable type?
-
Cables tagged?
-
Red taped exchange side?
-
Jig Used? (Cable separation)
-
Evidence of full abrade?
-
Telstra notification of unsafe pit/Lid?