Information
-
Central Office Name
-
Application ID
-
SL job#
-
Conducted on
-
Location
-
Prepared by
OSPE Contact
-
Name
-
Phone Number(s)
Relay Rack or Proposed Relay Rack Location
-
Rack #
-
Picture of Existing Rack or Proposed Location of Rack
Pre-Term Cable 1
-
Count:
-
Length:
Pre-Term Cable 2
-
Count:
-
Length:
Vault
-
Picture:
Route 1 MMP
-
Scope of Work:
-
Collector Shot of Route 1
-
AT&T MH to SL HH
Route 2 MMP
-
Scope of Work:
-
Collector Shot of Route 2
-
AT&T MH to SL HH
Sign Off
-
Operator's signature
-
OSPE's signature