Title Page
Site details
-
Store name: Co-operative Food Store,
-
Store address:
-
FSV Conducted on:
-
Prepared by:
Proposed Programme Dates
-
Start on site:
-
Store closes:
-
Handover to MC:
-
Pre PC snagging:
-
PC date:
-
Store Launch:
Project related issues
Metro FRA issues
-
Are there any FRA issues noted on the latest report, please list and advise actions required.
Maintenance FM Store related issues
-
Are there any FM issues noted by Maintenance contractor, please list and advise actions required.
Store manager existing building/operational issues.
-
Has the store manager any building/operational issues relating to the proposed project.
Power upgrade
-
Is a power upgrade been planned for this store, if so, please include full details, include photos of existing installation and note meter details. Include status of application.
Asbestos removals
-
Are there any planned asbestos removals programmed/required, if so, please list and take photos of areas to be removed. Have they been cross referenced with the proposed scope of works.
Incoming Electrical supply
-
Please specify original position & new position if having a power upgrade and meter is being moved. Please take photos to include existing meter position and serial numbers.
Incoming Gas supply
-
Is gas available if so where is the meter position, please take photos
Incoming water supply
-
Incoming water supply stop cock. Please specify position of stop cock, position of water meter if internal and known, take photos.
Incoming BT cables/phone lines/fibre optic cables
-
Is there an internal incoming DP box, if so, please specify position and take photos.
Information relating to project
Current Drawings available
-
List drawings
Asbestos report
-
List types, dates, etc
Refrigeration survey/report
-
Refrigeration drawings/surveys available
Planning applications & consents
-
Is the premises listed, subject to a preservation order.
-
Planning permission received
Team Photo
-
Please take team photo of the Uplands site manager, RPM, Store manager & Regional operation manager and list contact details.
Store information required.
-
List of opening hours, current & proposed.
-
Managers name
-
Store telephone number
-
Managers mobile number
-
Delivery restrictions, please list
-
Residential issues/nearby houses/occupied flats above/ communal areas & entrances, please list
Shop front/external elevations
External Shop front
-
Shop front full photos
-
New signage, please refer to signage contractor drawing
-
Approximate full shop front width in mts.
-
Approximate shop front height of curtain walling in mts
-
Approximate shop front width of curtain walling in mts
-
Retain Post office sign, priority 1
-
Retain Pay point sign, priority 2
-
Retain Cash zone ATM sign, priority 3
-
Retain Amazon sign, priority 4
-
Retain National Lottery sign, priority 5
-
Timber fascia works, please specify, take photos
-
Shop front curtain wall/ doors painted 7043 grey, please confirm works.
-
Shop front decorations to render/doors/pipe work required
-
Approximate square meterage of decorations to render/doors/pipe work
-
Shop front repairs, please specify, take photos
-
Existing front door type
- Single swing door
- Double swing doors
- Single sliding door
- Double sliding doors
-
Existing clear opening height in mm
-
Existing clear opening width in mm
-
Do the doors need removing for access, please take photos of inside & outside elevations
-
New Auto doors required
- None repair existing
- Renew existing door set type
- New door set & curtain wall
- New door set & curtain wall, new position
-
New door set type to be installed
-
New door clear opening height in mm
-
New door clear opening width in mm
-
Threshold works, please specify, take photos
-
New threshold width in mm
-
New threshold depth in mm
-
Is a new external mobile plant/flower stand required.
-
Is an external news tower required.
-
Is there an external ramp, if so, are there any works, please specify & take photos
-
Additional information, please specify, take photos
External front pavement/car park works
External front pavement/car park works
-
Are external pavement/car park works required
-
Roller shutter works, please specify, refer to ADRS spec
-
Additional bollards required, please state size & type, take photos
-
Number of new bollards required
-
Armco barrier system required
-
Tarmac repairs required, please specify, take photos
-
Tarmac repairs, approximate square meterage required
-
New white/yellow lining
-
Approximate linear meterage of white lining/yellow hatching required
-
Trolley bay requirements.
- None
- New mobile required
- Repair existing
- New Kee Klamp bay required
-
Drainage repairs/cleaning required, please specify, take photos
-
Additional signage required, please specify, refer to signage contractors dwg
-
Temporary Mobile shop facility to be installed.
-
Cable tidy required, please specify, take photos
-
News paper cabinet requirements
- None
- Redecorate existing
- Install new, refer to ODSF
-
Post office collection cabinet works.
- None
- Redecorate existing
- Install new, refer to ODSF
-
Jet washing required, please specify, take photos
-
Approximate square meterage of jet washing required
-
New floor mounted rubbish bin & installation required
-
New wall mounted rubbish bin & installation required
-
New Kee Klamp protection rail required, please specify, take photos
-
Approximate linear meterage of Kee Klamp requiredh
-
Additional information, please specify, take photos
External LH elevation building/pavement/car park works
External LH elevation building/pavement/car park works
-
Are there any external LH elevation building/pavement/car park works
-
Roller shutter works, please specify, refer to ADRS spec
-
Additional signage, please refer to signage contractors spec/dwg
-
Additional bollards required, please state size & type, take photos
-
Number of new bollards required
-
Armco barrier system required
-
Tarmac repairs required, please specify, take photos
-
Tarmac repairs, approximate square meterage required
-
New white/yellow lining
-
Approximate linear meterage of white lining/yellow hatching required
-
Drainage repairs/cleaning required, please specify, take photos
-
Additional signage required, please specify, refer to signage contractors dwg
-
Temporary Mobile shop facility to be installed.
-
Cable tidy required, please specify, take photos
-
Trolley bay requirements.
- None
- New mobile required
- Repair existing
- New Kee Klamp bay required
-
News paper cabinet requirements
- None
- Redecorate existing
- Install new, refer to ODSF
-
Post office collection cabinet works.
- None
- Redecorate existing
- Install new, refer to ODSF
-
Jet washing required, please specify, take photos
-
Approximate square meterage of jet washing required
-
New floor mounted rubbish bin & installation required
-
New wall mountedrubbish bin & installation required.
-
New Kee Klamp protection rail required, please specify, take photos
-
Approximate linear meterage of Kee Klamp requiredh
-
Additional information, please specify, take photos
External RH elevation building/pavement/car park works
External RH pavement/car park works
-
Are there any external RH elevation building/pavement/car park works
-
Roller shutter works, please specify, refer to ADRS spec
-
Additional signage, please refer to signage contractors spec/dwg
-
Armco barrier system required
-
Additional bollards required, please state size & type, take photos
-
Number of new bollards required
-
Tarmac repairs required, please specify, take photos
-
Tarmac repairs, approximate square meterage required
-
New white/yellow lining
-
Approximate linear meterage of white lining/yellow hatching required
-
Jet washing required, please specify, take photos
-
Approximate square meterage of jet washing required
-
New wall mountedrubbish bin & installation required.
-
New floor mounted rubbish bin & installation required
-
New Kee Klamp protection rail required, please specify, take photos
-
Approximate linear meterage of Kee Klamp requiredh
-
Drainage repairs/cleaning required, please specify, take photos
-
Additional signage required, please specify, refer to signage contractors dwg
-
Temporary Mobile shop facility to be installed.
-
Cable tidy required, please specify, take photos
-
Trolley bay requirements.
- None
- New mobile required
- Repair existing
- New Kee Klamp bay required
-
News paper cabinet requirements
- None
- Redecorate existing
- Install new, refer to ODSF
-
Post office collection cabinet works.
- None
- Redecorate existing
- Install new, refer to ODSF
-
Additional information, please specify, take photos
Internal shop floor
Shop front internal
-
Decorations to shop front, please refer to specification & Novograf drawing. Please list & take photos
-
Repairs/new stall riser
-
Internal roller shutter service/repairs, please refer to ADRS spec & maintenance scheduling, RPM to advise.
-
Decorations to roller shutters & guides
- None
- Decorate guides grey
- Decorate guides & bottom runner grey
- Decorate guides & bottom 300 mm grey
-
Shop front bulkhead works, please specify & take photos.
-
Additional information, please specify & take photos
Ceiling/soffit works
-
Are ceiling/ soffit works required
-
Fire boarding required, please refer to Coop FRA document if available for addition guidance.
-
Fire boarding approximate quantity in square meters
-
Does the ceiling grid require strengthening to support the new lighting
-
Are recessed light fittings being removed, please specify and take photos.
-
Remove existing bulkheads, please specify & take photos.
-
Shop floor ceiling works required, please specify.
- No works
- Replace % of ceiling tiles only
- Replace % of ceiling tiles & damaged grid
- Replace all ceiling tiles & damaged grid
- Full replacement of ceiling tiles and grid
- Decorate & repair existing soffit
- Replace damaged ceiling tiles & grid
-
Percentage of ceiling replacement
-
Are 595mm x 595mm plywood pattresses required for ceiling fittings
-
Quantity of pattresses required for ceiling fittings
-
Additional information, please specify & take photos.
Flooring
-
New vinyl flooring required, please refer to current specification.
- None
- Repair existing
- New non slip flooring
- Vinyl wood plank to current spec
- Other, please refer to spec & dwg
- New Grey vinyl tiles
-
Existing flooring repairs, please specify & take photos. Refer to flooring contractors survey for details.
-
Approximate square footage of flooring required, please refer to the current drawing.
-
Existing entrance matting, please refer to photo below.
- Surface mounted
- Recessed matting
-
Photo of existing entrance matting
-
New entrance matting required, please refer to current specification.
- Surface mounted matting in new dim strip frame
- Reuse existing matting
- Renew recessed matting to existing mat well dimensions
- Reduce size of mat well & install new matting
-
Required width of entrance matting in mm.
-
Required length of entrance matting in mm.
-
Approximate length of vinyl skirting required Tito exposed areas in meters
-
Additional information, please specify & take photos.
EAS Gates
-
New EAS gates required,please refer to Algreta/Catalyst specification.
-
Is new EAS gates containment & electrical supply required. Please refer to Algreta/Catalyst spec
-
Additional information, please specify & take photos.
Kiosk & counters
-
Are works required to the Kiosk/counters
-
New frontline counters required, please refer to ODSF & Dwg.
-
New back line counters required, please refer to ODSF & Dwg.
-
Tobacco unit retained/refurbished.
-
New community wall including BT line required.
-
Number of existing tills installed
-
Number of new tills required, please refer to the latest drawing & ODSF
-
Managers work station required, please refer to the ODSF & Dwg.
-
Lottery counter installed, please keep safe on site for reuse. If new is required please order from Aspen & include on the ODSF.
-
ASS safe required, please check the ODSF for details.
-
Post office till/counter installed on frontline, if existing, please keep all equipment in a dust free & secure area of the store ready for reuse.
-
Is space required behind the counters for post office collection bags, if yes, please specify number of bag space required.
-
Additional information, please specify & take photos.
New frieze ladder racking
-
Are works required to existing wall frieze.
-
Remove existing frieze/ladder racking, please specify & take photos.
-
Length of frieze/ladder racking to be removed.
-
Length of frieze/ ladder racking to be installed, please refer to the Novograf drawing & proposed layout drawing.
-
Height of ladder racking /frieze in mm.
-
Additional information, please specify & take photos.
Columns
-
Do the columns need stripping & re-cladding.
-
Number of columns to be stripped.
-
Number of columns to be re-clad.
-
Additional information, please specify & take photos.
Wall protection
-
Wall protection required, please refer to current Dwg.
-
Chequer plate to doors required, please specify & add approximate dimensions, take photos if relevant.
-
Additional information, please specify & take photos.
New internal graphics
-
Are new internal graphics being installed, please refer to Novograf drawing & proposed layout Dwg.
-
Additional information, please specify & take photos.
Lighting
-
Is there new lighting being installed, please refer to electrical specification for details
-
Additional information, please specify & take photos.
CCTV
-
New CCTV, refer to Kings specification & SOW.
-
Additional information, please specify & take photos.
Alarms
-
New Alarms, refer to Kings specification & SOW.
-
Additional information, please specify & take photos.
Fire Alarms
-
New fire alarms, refer to fire alarm contractors specification & SOW.
-
Additional information, please specify & take photos.
Data/IT
-
New data/IT installation, refer to CTS/Sudlows specification & SOW.
-
Additional information, please specify & take photos.
Post Office dedicated counter
-
Existing PO installed, if yes, please take photos
-
Is PO moving, please refer to proposed layout.
-
Additional information, please refer to spec/Dwg. Photos of existing
ATM
-
Is there any ATM works
- None
- External to remain
- External to move
- Internal to remain in place
- Internal to move
- New external
- New internal
-
If existing, does it move including BT, alarms & electric supply, please refer to proposed layout Dwg.
-
If new are new services required, BT line, Electrical socket & Alarms. Please refer to spec & Dwg.
-
Are shop front glazing works required to install the new ATM, please refer to spec & dwg
-
Is a new concrete base required for the installation, please refer to spec & Dwg.
-
Additional information, please refer to spec/Dwg. Photos of existing
Shelving/fixtures
-
Is all the shelving being renewed, refer to spec/dwg/Edens SOW.
-
Additional information, please refer to spec/Dwg. Photos of existing
Amazon lockers
-
Are there Amazon lockers in store, please specify, take photos. Refer to guidance notes for locker moves.
Refrigeration
-
Is the refrigeration being replaced, please refer to BJA survey & proposed Dwg.
-
AC units to renewed.
-
AC units to be moved.
-
Additional information, please refer to spec/Dwg. Photos of existing
Warehouse door entry system.
-
Door entry system works required.
Shop floor builders works/alterations
-
Alterations to walls/new layout, please specify, refer to proposed layout. Take photos
-
New doors/doors moved, please refer to proposed layout.
-
Demolition/soft strip, please refer to proposed layout Dwg.
-
New drains/alterations to existing, please specify, take photos, mark up on drawing.
-
Builders works in connection with services, please review with contractors for details
-
New Soham door required, please refer to proposed layout Dwg.
-
Additional information, please refer to spec/Dwg. Photos of existing
Internal BOH Rear doors
Goods in roller shutter
-
New roller shutter
-
Service roller shutter
Rear goods in doors
-
Door repairs required
Rear entrance doors
-
New Soham door required, please specify size, take photo
-
Door repairs required, please specify, take photos
Internal plant room
-
Internal plant room work, please specify, add photos
Goods in Warehouse/Warehouse 2
Goods in Warehouse 1
-
Are Goods in Warehouse 1 works required
-
New ceiling required, if so please specify type
-
Ceiling/soffit repairs & decorations required, please specify
-
Approximate square meterage of ceiling required
-
Decorations to walls
-
Flooring repairs, please specify
-
Corner protection required, please specify
-
New dedicated walkway yellow lining
-
Are there any works required to existing windows.
-
Cable tidy required, please specify
-
New shelving required, please specify
-
Kee Klamp protection required, please specify.
-
Service penetrations required, please specify
-
Fire stopping required, please specify.
-
Drainage works required, please specify
-
New lighting pack required, refer to electrical spec
-
Is a dock leveller installed, if so, please specify SWL , currently in service, any remedial works required during the refurbishment programme.
-
Additional information, please include photos
-
Wall protection required, please specify
Warehouse 2
-
Are Warehouse 2 works required
-
New ceiling required, if so please specify type
-
Ceiling/soffit repairs & decorations required, please specify
-
Decorations to walls
-
Flooring repairs, please specify
-
Corner protection required, please specify
-
New dedicated walkway yellow lining
-
Wall protection required, please specify<br>
-
Are there any works required to existing windows.
-
New shelving required, please specific
-
Cable tidy required, please specify
-
Kee Klamp protection required, please specify.
-
Service penetrations required, please specify
-
Fire stopping required, please specify.
-
Drainage works required, please specify
-
New lighting pack required, refer to electrical spec
-
Additional information, please include photos
Cash office
Cash office
-
Cash office works, please refer to drawing.
- None
- Extend existing
- Refurb existing
- New BWS store, new position
-
Cash Office Ceiling
- No works
- Replace % of ceiling tiles only
- Replace % of ceiling tiles & damaged grid
- Replace all ceiling tiles & damaged grid
- Full replacement of ceiling tiles and grid
- Decorate & repair existing soffit
- Replace damaged ceiling tiles & grid
-
Cash Office flooring
- None
- Repair existing
- New non slip flooring
- Vinyl wood plank to current spec
- Other, please refer to spec & dwg
- New Grey vinyl tiles
-
Cash Office walls/decorations
- None
- Decorate only
- Repair & decorate
- Part decorations
-
Cash Office worktops
- No works
- Renew all worktops
- Replace damaged only
-
Cash office safe works, please specify & take photos
-
New cash office lighting required, refer to electrical spec
-
New CCTV package, please refer to Kings spec
-
New IT/Data package, please refer to Sudlows/CTS spec
-
Cash office filing cabinets
- None, reuse existing
- 1 new 2 drawer cabinet
- 2 new 2 drawer cabinets
- 1 new 4 drawer cabinet
- 2 new 4 drawer cabinets
-
Cash office white boards required, please specify size & number
-
Cash office pin boards required, please specify size & number
-
Cash office shelf units required, please specify size & number.
-
Cash office chairs required
- None
- 1 new chair required
- 2 new chairs required
- 3 new chairs required
- 4 new chairs required
-
Additional information, please include photos
ISB ( In store bakery)
ISB(in store bakery)
-
ISB requirements
- None
- Extend existing
- Refurb existing
- New BWS store, new position
-
Ceiling remedial works
- No works
- Replace % of ceiling tiles only
- Replace % of ceiling tiles & damaged grid
- Replace all ceiling tiles & damaged grid
- Full replacement of ceiling tiles and grid
- Decorate & repair existing soffit
- Replace damaged ceiling tiles & grid
-
Hygienic cladding to walls
- None
- Repair existing
- Extend existing
- New wall cladding
-
Stainless steel behind ovens, if yes, specify size & nr of sheets required
-
Flooring
- None
- Repair existing
- New non slip flooring
- Vinyl wood plank to current spec
- Other, please refer to spec & dwg
- New Grey vinyl tiles
-
Bakery door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Door transfer grille required
-
Please specify door transfer grille size in mm.
-
New extract system required, please specify
-
Worktops
- No works
- Renew all worktops
- Replace damaged only
-
New cabinets required, please specify, photos
-
Wash up equipment cleaning sink
- No works
- New sink
- Reuse existing
- New sink, new position
- Existing sink, new position
-
Wash hand basin
- No works
- New sink
- Reuse existing
- New sink, new position
- Existing sink, new position
-
Sink taps
- None
- All new taps
- New wash up sink taps only
- New WHB sink taps only
-
Bakery Ovens, refer to Dwg & mono spec
- None
- 1 new oven required
- 2 new ovens required
- Full equipment package required
-
Are there any bakery ovens to be removed from site
-
Bakery oven water supplies required
- None
- 1 new supply required
- Add1 supply to existing
- 2 New water supplies required, existing position
- 2 New water supplies, new position
-
Bakery oven drainage required
- None required
- 1 new waste existing position
- 2 new wastes/reconfigure existing position
- 1 new waste, new position
- 2 new wastes, new position
-
Ticket rails
- None required
- 2 new rails required
- Reuse existing rails
- 1 new rail, reuse existing
-
Bakery printer package required, refer to ODSF
-
New lighting required, refer to electrical spec
-
New white boards, refer to ODSF
-
Data/IT package required, Sudlows/CTS, refer to ODSF
-
Bakery oven electrical supplies, refer to electrical spec
- None required
- 1new supply required
- 2 new supplies required
- 2 new supplies required in new position
- 1 new supply required in new position
-
New freezer required, please specify, refer to Dwg
-
Are there any works to existing windows, please specify.
-
Additional information, please include photos
BWS store
BWS store
-
Are works required to the BWS store
- None
- Extend existing
- Refurb existing
- New BWS store, new position
-
BWS door works
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
New ceiling required, if so please specify type
-
Ceiling/soffit repairs & decorations required, please specify
-
Decorations to walls
-
Flooring repairs, please specify
-
Corner protection required, please specify
-
New dedicated walkway yellow lining
-
Wall protection required, please specify
-
Cable tidy required, please specify
-
New shelving required, please specify
-
Kee Klamp protection required, please specify.
-
Service penetrations required, please specify
-
Fire stopping required, please specify.
-
Drainage works required, please specify
-
New lighting pack required, refer to electrical spec
-
Are there any works to existing windows, please specify.d
-
Additional information, please include photos
Secure store
Secure store
-
Are works required to the Secure store
-
Secure store door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Secure store ceiling
- No works
- Replace % of ceiling tiles only
- Replace % of ceiling tiles & damaged grid
- Replace all ceiling tiles & damaged grid
- Full replacement of ceiling tiles and grid
- Decorate & repair existing soffit
- Replace damaged ceiling tiles & grid
-
Secure store Decorations
- None
- Decorate only
- Repair & decorate
- Part decorations
-
Secure store flooring
- None
- Repair existing
- New non slip flooring
- Vinyl wood plank to current spec
- Other, please refer to spec & dwg
- New Grey vinyl tiles
-
Secure store new lighting, refer to electrical spec
-
Are there any works to existing windows, please specify.d
-
New secure store shelves
-
Additional information, please include photos
Cleaners and Store room
Cleaners room/store
-
Cleaning store/room works required
-
Ceiling works, please specify
-
Decorations, please specify'
-
Flooring works, please specify
-
Plumbing works, please specify
-
Are there any works to existing windows, please specify.d
-
Additional works, please specify & add photos
Store room
-
Store room works required
-
Ceiling works, please specify
-
Decorations, please specify
-
Flooring works, please specify
-
Are there any works to existing windows, please specify.d
-
Additional works, please specify & add photos
Canteen/rest room
Canteen/rest room
-
Canteen works required
-
Canteen/rest room door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Canteen ceiling
- No works
- Replace % of ceiling tiles only
- Replace % of ceiling tiles & damaged grid
- Replace all ceiling tiles & damaged grid
- Full replacement of ceiling tiles and grid
- Decorate & repair existing soffit
- Replace damaged ceiling tiles & grid
-
Canteen walls
- None
- Decorate only
- Repair & decorate
- Part decorations
-
Canteen floors
- None
- Repair existing
- New non slip flooring
- Vinyl wood plank to current spec
- Other, please refer to spec & dwg
- New Grey vinyl tiles
-
Canteen worktop
- No works
- Renew all worktops
- Replace damaged only
-
Canteen breakfast bar required
- No works
- Renew all worktops
- Replace damaged only
-
Canteen cupboards required, please specify size & number
-
Are there any works to existing windows, please specify.d
-
New canteen lighting, please refer to electrical spec
-
Canteen chairs/stools required
- None
- 1 new chair required
- 2 new chairs required
- 3 new chairs required
- 4 new chairs required
-
New microwave required
-
New fridge required
-
New toaster required
-
New kettle required
-
Bunzl package required
-
Additional information, please include photos
Ladies Toilet
Ladies Toilet
-
Ladies toilet works required
-
Ladies toilet door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Ladies toilet decoration works
- None
- Decorate only
- Repair & decorate
- Part decorations
-
Ladies toilet flooring
- None
- Repair existing
- New non slip flooring
- Vinyl wood plank to current spec
- Other, please refer to spec & dwg
- New Grey vinyl tiles
-
Ladies toilet plumbing
- No works
- Replace toilet seat only
- New toilet & cistern complete
- New toilet seat & WHB taps
- Full replacement of all sanitary ware
-
WHB slplashback
- No works
- Re-grout existing
- Renew existing
- New hygienic splash back
-
WHB splash back photo
-
New Ladies toilet lighting, please refer to electrical spec
-
New mirror required, please specify size
-
New soap dispenser, toilet roll holder etc required
-
Are there any works to existing windows, please specify.d
-
Additional information including photos
Gents Toilet
Gents Toilet
-
Gents toilet works required
-
Gents toilet door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Gents toilet ceiling works
- No works
- Replace % of ceiling tiles only
- Replace % of ceiling tiles & damaged grid
- Replace all ceiling tiles & damaged grid
- Full replacement of ceiling tiles and grid
- Decorate & repair existing soffit
- Replace damaged ceiling tiles & grid
-
Gents toilet decoration works
- None
- Decorate only
- Repair & decorate
- Part decorations
-
Gents toilet flooring
- None
- Repair existing
- New non slip flooring
- Vinyl wood plank to current spec
- Other, please refer to spec & dwg
- New Grey vinyl tiles
-
Gents toilet plumbing
- No works
- Replace toilet seat only
- New toilet & cistern complete
- New toilet seat & WHB taps
- Full replacement of all sanitary ware
-
WHB slplashback
- No works
- Re-grout existing
- Renew existing
- New hygienic splash back
-
WHB splash back photo
-
New Gents toilet lighting, please refer to electrical spec
-
New mirror required, please specify size
-
New soap dispenser, toilet roll holder etc required
-
Are there any works to existing windows, please specify.d
-
Additional information including photos
Backup Chiller/Freezer works
BOH backup chiller
-
Backup chiller works, refer to BJA spec & Dwg.
-
New chiller flooring
-
New chiller threshold works
- No works
- Repair existing
- Replace existing
- Repair substrate & replace existing
-
Existing chiller threshold
-
New chiller racking required, please specify size & nr of bays
-
Additional works, please specify, photos
BOH backup freezer
-
Backup freezer works, refer to BJA specs & dwgz
-
Excavation to form new freezer floor well
- No works
- Excavate & form new pit
- Repairs to existing
- Excavate & form new pit in new position
-
New freezer threshold works
- No works
- Repair existing
- Replace existing
- Repair substrate & replace existing
-
Existing freezer threshold
-
New freezer racking required, please specify size & nr of bays
-
Additional works, please specify, photos
Managers office/Training room/Stairs
Managers office 1
-
Managers office works
-
Managers office door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Ceiling works, please specify
-
Decorations, please specify
-
Flooring works, please specify
-
Are there any works to existing windows, please specify.d
-
Additional works, please specify & add photos
Managers office 2
-
Managers office works
-
Managers office door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Ceiling works, please specify
-
Decorations, please specify
-
Flooring works, please specify
-
Are there any works to existing windows, please specify.d
-
Additional works, please specify & add photos
Training room
-
Training room works
-
Training Room door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Ceiling works, please specify
-
Decorations, please specify
-
Flooring works, please specify
-
Are there any works to existing windows, please specify.d
-
Additional works, please specify & add photos
Staircase & landing
-
Stairs & landing works
-
Ceiling works, please specify
-
Decorations, please specify
-
Flooring works, please specify
-
Are there any works to existing windows, please specify.d
-
Additional works, please specify & add photos
First Floor Warehouse
First floor warehouse
-
First floor warehouse works required
-
New ceiling required, if so please specify type
-
Ceiling/soffit repairs & decorations required, please specify
-
Decorations to walls
-
Flooring repairs, please specify
-
Corner protection required, please specify
-
New dedicated walkway yellow lining
-
Wall protection required, please specify
-
Cable tidy required, please specify
-
New shelving required, please specify
-
Kee Klamp protection required, please specify.
-
Service penetrations required, please specify
-
Fire stopping required, please specify.
-
Drainage works required, please specify
-
New lighting pack required, refer to electrical spec
-
Are there any works to existing windows, please specify.d
-
Additional information, please include photos
First floor Ladies Toilet
First floor Ladies Toilet
-
First floor ladies toilet works
-
First floor ladies toilet door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Ladies toilet ceiling works
- No works
- Replace % of ceiling tiles only
- Replace % of ceiling tiles & damaged grid
- Replace all ceiling tiles & damaged grid
- Full replacement of ceiling tiles and grid
- Decorate & repair existing soffit
- Replace damaged ceiling tiles & grid
-
Ladies toilet decoration works
- None
- Decorate only
- Repair & decorate
- Part decorations
-
Ladies toilet flooring
- None
- Repair existing
- New non slip flooring
- Vinyl wood plank to current spec
- Other, please refer to spec & dwg
- New Grey vinyl tiles
-
Ladies toilet plumbing
- No works
- Replace toilet seat only
- New toilet & cistern complete
- New toilet seat & WHB taps
- Full replacement of all sanitary ware
-
WHB slplashback
- No works
- Re-grout existing
- Renew existing
- New hygienic splash back
-
WHB splash back photo
-
New Ladies toilet lighting, please refer to electrical spec
-
New mirror required, please specify size
-
New soap dispenser, toilet roll holder etc required
-
Are there any works to existing windows, please specify.dg
-
Additional information including photos
First floor Gents Toilet
First floor Gents Toilet
-
Gents toilet works
-
First floor gents toilet door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Gents toilet ceiling works
- No works
- Replace % of ceiling tiles only
- Replace % of ceiling tiles & damaged grid
- Replace all ceiling tiles & damaged grid
- Full replacement of ceiling tiles and grid
- Decorate & repair existing soffit
- Replace damaged ceiling tiles & grid
-
Gents toilet decoration works
- None
- Decorate only
- Repair & decorate
- Part decorations
-
Gents toilet flooring
- None
- Repair existing
- New non slip flooring
- Vinyl wood plank to current spec
- Other, please refer to spec & dwg
- New Grey vinyl tiles
-
Gents toilet plumbing
- No works
- Replace toilet seat only
- New toilet & cistern complete
- New toilet seat & WHB taps
- Full replacement of all sanitary ware
-
WHB slplashback
- No works
- Re-grout existing
- Renew existing
- New hygienic splash back
-
WHB splash back photo
-
New Gents toilet lighting, please refer to electrical spec
-
New mirror required, please specify size
-
New soap dispenser, toilet roll holder etc required
-
Are there any works to existing windows, please specify.d
-
Additional information including photos
First floor Canteen/Rest room
First floor Canteen/staff room
-
First floor canteen works
-
First floor canteen door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Canteen ceiling
- No works
- Replace % of ceiling tiles only
- Replace % of ceiling tiles & damaged grid
- Replace all ceiling tiles & damaged grid
- Full replacement of ceiling tiles and grid
- Decorate & repair existing soffit
- Replace damaged ceiling tiles & grid
-
Canteen walls
- None
- Decorate only
- Repair & decorate
- Part decorations
-
Canteen floors
- None
- Repair existing
- New non slip flooring
- Vinyl wood plank to current spec
- Other, please refer to spec & dwg
- New Grey vinyl tiles
-
Canteen worktop
- No works
- Renew all worktops
- Replace damaged only
-
Canteen breakfast bar required
- No works
- Renew all worktops
- Replace damaged only
-
Canteen cupboards required, please specify size & number
-
Are there any works to existing windows, please specify.d
-
New canteen lighting, please refer to electrical spec
-
Canteen chairs/stools required
- None
- 1 new chair required
- 2 new chairs required
- 3 new chairs required
- 4 new chairs required
-
New microwave required
-
New fridge required
-
New toaster required
-
New kettle required
-
Bunzl package required
-
Additional information, please include photos
First floor Fire escape/Corridor/training room
First floor Corridor
-
First floor corridor works
-
First floor corridor door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Decorations, please specify
-
Ceiling works, please specify
-
Decorations, please specify
-
Flooring works, please specify
-
Are there any works to existing windows, please specify.d
-
Additional works, please specify & add photos
First floor Fire Escape stairs
-
First floor Fire escape/stairs works
-
First floor fire escape/stairs door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Decorations, please specify
-
Ceiling works, please specify
-
Decorations, please specify
-
Flooring works, please specify
-
Are there any works to existing windows, please specify.d
-
Additional works, please specify & add photos
First floor Training room
-
First floor Training Room works
-
First floor training room door
- No works
- New door & frame complete
- Decorations only
- Repairs & decorations
- Repairs, decs & new ironmongery
- Ease & adjust
-
Decorations, please specify
-
Ceiling works, please specify
-
Decorations, please specify
-
Flooring works, please specify
-
Are there any works to existing windows, please specify.d
-
Additional works, please specify & add photos
Goods in/Rear yard
Rear yard/external goods in area
-
External decorations, please list, take photos
-
Security gate works, please specify, take photos
-
Plant area security gates, please specify, take photos
-
Plant area remedial works, please specify, take photos
-
New refrigeration plant required, please refer to BJA report
-
New A/C plant required, please refer to BJA report
-
Acoustic cladding requirements, please refer to survey, BJA report
-
Perimeter fencing works, please specify requirements, size, photos
-
Is Kee Klamp protection required to plant, please specify, add dimensions & photos
-
External BWIC/fire stopping required, please specify, take photos
-
White lining requirements, please specify, photos
-
Yellow hatching requirement, please specify, take photos
-
New external lighting, please refer to electrical spec
-
Soham doors required if not specified elsewhere, please refer to Dwg,
-
Armco barrier system requirements
-
Ram raid/demarcation bollards required, please specify, take photos, quantity
-
Tarmac repairs, please specify, include area, take photos
-
Drain jetting works required, please specify, take photos
-
Jet washing to rear yard, please specify, take photos
-
Addition information, please specify
Roof works
Roof works
-
New overlay to roof, please specify
-
Roof repairs please specify
-
New Kee Klamp edge protection/walkway, please specify
-
Additional works, please specify, photos etc
Next steps/Additional information required.
Next steps/additional information.
-
Is a new COSHH cabinet required, if so, where will it be positioned.
-
Additional works not covered elsewhere, please specify & add photos
-
Additional information required/outstanding/awaiting confirmation, please list.
-
Next steps, please list.