Information
-
Project Name
-
Client
-
Conducted on
-
Prepared by
-
Personnel on site
CLOSEOUT PHOTOS
Task Completed
-
1. Rack Installed/Anchored/Grounded - Front/Rear
-
2. Top Support/Ladder Rack/Fiber Duct
-
3. Equipment Rack/Stacked/Grounded
-
5. Power Cable Ran/Stitched
-
6. Power Terminated to Equipment
-
7. Power Terminated to FAP/BDFB
-
8. Fiber Installed/Labeled
-
9. Cat 5 Installed/Labeled
-
10. TTU Completed
-
11. Site Cleanliness
-
12. Misc Photos
Installation Summary
-
In your own words describe your overall grade on the installation.
-
How can E-3 and or the customer help better the installation process?