Information

  • Project Name

  • Client

  • Conducted on

  • Prepared by

  • Personnel on site

CLOSEOUT PHOTOS

Task Completed

  • 1. Rack Installed/Anchored/Grounded - Front/Rear

  • 2. Top Support/Ladder Rack/Fiber Duct

  • 3. Equipment Rack/Stacked/Grounded

  • 5. Power Cable Ran/Stitched

  • 6. Power Terminated to Equipment

  • 7. Power Terminated to FAP/BDFB

  • 8. Fiber Installed/Labeled

  • 9. Cat 5 Installed/Labeled

  • 10. TTU Completed

  • 11. Site Cleanliness

  • 12. Misc Photos

Installation Summary

  • In your own words describe your overall grade on the installation.

  • How can E-3 and or the customer help better the installation process?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.