Title Page

  • Conducted on

  • Accredited contractor (company) name

  • Key personnel name

  • Development address

  • Development number (MCU/ROL/OPW)

  • Standard connection application number (WWS)

  • Standard connection category

  • Standard connection description

  • Provide detail of 'other' endorsed connection

  • Size

  • Standard connection description

  • Pipe material re-lined

  • Provide detail of 'other' endorsed connection

  • House connection size

  • Temporary connection

Pre-standard connection construction

Dilapidation Report

  • What is the condition of existing service provider assets in the vicinity of the standard connection works?

  • What is the condition of existing footpaths, trees, driveways, fences, verge etc in the vicinity of the standard connection works?

  • Are there any notifiable existing defects that may cause disputes in the future?

  • Provide photos of dilapidation report

Development approval

  • Link to PD online to access development approval: https://www.goldcoast.qld.gov.au/Planning-building/PD-Online

  • Are the standard connection works compliant with the development approval?

  • Has the matter been discussed, addressed and authorised with Water and Waste? Provide details by adding a note.

Sewer pre-CCTV condition report

  • Does the development approval require a CCTV assessment of the existing sewer service to reuse?

  • Provide link to pre CCTV

  • Was the existing sewer service pipe material asbestos cement?

  • Was the existing service fit to be relined?

  • Has a new sewer connection been provided?

  • Provide link to post CCTV of the completed reline

IPAM Compliance

  • Link to IPAM list: http://www.seqcode.com.au/products/

  • Are all fittings/fixtures/meters/pipe/joins/materials/products compliant with the IPAM?

  • Have the proposed products been approved in writing by Water and Waste?

  • Provide photos of all fittings/fixtures/meters/pipe/joins/materials/products

SEQ Code compliance

  • Link to SEQ Code: http://www.seqcode.com.au/standards/

  • Are the standard connection works compliant with the SEQ Code

  • Has the proposed design been approved in writing by Water and Waste?

Standard Connection Construction

Site safety

  • The standard connection works were carried out in accordance with all relevant safety requirements

  • The standard connection works were carried out in accordance with all relevant environmental safety requirements

  • The standard connection works were carried out in accordance with all relevant traffic/pedestrian safety requirements

  • Provide photos of site safety

Trench excavation

  • Provide photos of the excavation works including any benching/battering/shoring

WW sewer/water main

  • Provide photos of the excavated sewer and/or water main

Completed connection

  • Provide photos of the new standard connection prior to backfilling

Works area reinstatement

  • Has the area impacted by the standard connection works been reinstated to its former condition?

  • Provide photos of work area reinstatement

Post standard connection construction

New water meter/s

  • Is a new water meter being installed as part of the works?

  • Install date

  • Meter serial number

  • Meter size (mm)

  • Meter make

  • Meter reading on installation date (kL)

  • Supply type

  • Location of meter

  • Upload photo of new water meter

  • Access online Water Meter Details Form on the City's website and submit - https://www.goldcoast.qld.gov.au/Services/Water-sewerage/Water-sewerage-connections/Water-meter-specifications

  • Upload photo of new water meters

Redundant water meter/s

  • Is a redundant water meter being removed?

  • Disconnection date

  • Meter serial number

  • Meter size (mm)

  • Meter reading on disconnection date (kL)

  • Supply type

  • Location of meter

  • Upload photo of redundant water meter

  • Has provision been made with the Water and Waste Inspector to retrieve the redundant water meter?

  • Access online Water Meter Details Form on the City's website and submit - https://www.goldcoast.qld.gov.au/Services/Water-sewerage/Water-sewerage-connections/Water-meter-specifications

  • Upload photo of redundant water meters

  • Has provision been made with the Water and Waste Inspector to retrieve the redundant water meters?

Standard connection as-constructed information

  • Link to GIS: https://www.arcgis.com/apps/webappviewer/index.html?id=e22412158dfc4688a1deea1468aeb6a3&extent=17077737.3814,-3249378.7389,17078310.6592,-3249098.3702,102100

  • As-constructed requirements:

    As con.JPG
  • Has the standard connection as-constructed information been completed?

  • Upload a PDF copy of the as-constructed information

Licensed plumber details (if applicable)

  • All meter installations and/or disconnections must be performed by a licensed plumber

  • Licensed plumber name

  • QBCC licence number

  • QBCC licence class

  • QBCC licence conditions (if applicable)

  • QBCC licence expiry date

Sign off

  • Name & signature of key personnel

  • Once PCR complete, share inspection report link to Inspections@goldcoast.qld.gov.au

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.