Information
-
Document No.
-
Audit Title
-
Audit Completed At:
-
Add location
-
Conducted on
1.Site Documentation
1.1 Site Manual (Procedure reference OP1/OP3/SA2)
-
1.1.1 Is the site manual the current COFELY format
-
1.1.1a Is the site manual up to date and been reviewed in the last 12 months
-
1.1.1b Is the site manual accessible to all site personnel
1.2 Site Manual – Health & Safety (Procedure reference OP3/SA2/SP6/RAP1/COSHH1/PTW1)
-
Does the site manual include the following documents / Information:
-
1.2.1 Current Company policy statements
-
1.2.1 Site Specific H & S information including Risk , COSHH assessments and Method Statements, Site Accident Book (Confirm all site personnel are aware of information)
-
1.2.1 Current Sub-Contractor Information
-
1.2.1 Identifies the Permit to Work system in use (COFELY or Customer)
-
1.2.1 Site Specific Induction Procedure (Site personnel/ Sub-contractors)
-
1.2.1 Site Specific Fire, Evacuation & Emergency Procedures
1.3 Site Records (Procedures Reference OP3/QA3/SA2/SP4/SP6)
-
Are the Following site records available and up to date:
-
1.3.1 Planned Maintenance Planner & completed tasks (COFELY)
-
1.3.1 Planned Maintenance Planner & completed tasks (Sub-Contractor including insurance certification, RA, COSHH, MS , Calibration and training record etc as required )
-
1.3.1 Standby Generator tests
-
1.3.1 Site Specific Environmental Aspects/ Objectives and Targets
-
1.3.1 Site Specific Operational Disaster Recovery Plan
-
1.3.1 Site Specific Signing in Procedure for all staff (Inc sub-contractors & visitors)
-
1.3.1 Site Utility readings
-
1.3.1 Completed toolbox talks
-
1.3.1 Completed time sheets
-
1.3.1 Previous site audit reports (internal / external audits Inc completed corrective actions)
-
1.3.1 Site Specific correspondence ( Inc letters, email, memos etc)
-
1.3.1 Document Control (Inc filing, archives issue & amendment etc)
-
Are the Following site records available and up to date:
-
1.3.2. Engineers quality of work checks (QAC1/QAC2)
-
1.3.2 Sub- contractor quality of work checks (QAC1)
-
1.3.2 Sub-contractor attendance form (SAF1)
-
1.3.2 Engineers Tool Checks (Inc PPE0 (ETC1)
-
1.3.2 Site Tool/ Equipment Register (TI1)
-
1.3.2 Site Test Equipment Calibration Record (Inc Certificates)
-
1.3.2 Site PAT test register (current and in date)
-
1.3.2 Site Ladder Log ( Current and in date) (LAD1)
-
1.3.2 Site / Engineer Vehicle inspection ( VRFV1 / VRFC1)
-
Audit Completed On:
2 Contract Management / Supervision
2.1 Customer Meetings / Reviews (Procedures Reference OP1/OP3/SP2)
-
Are the Following site records available and up to date:
-
2.1.1 Have relevant Customer meetings / reviews taken place
-
2.1.1 Do the records demonstrate completed corrective actions have been achieved in the records of meetings / reviews
-
2.1.2 Have relevant management / supervisory visits taken place
-
2.1.2 Completed Monthly Contract Review (MCR1/ MCR1b)
-
2.1.2 Completed Managers Check List (MCL1 (Health Care) / MCL2 (Regions)
-
2.1.2 Have roles, responsibilities and authorities been defined and communicated to site personnel
-
2.1.2 Have relevant site personnel appraisals taken place
-
2.1.2 Have staff completed relevant training identified as a result of annual appraisal
3 Site Operations
3.1 Procurement (Procedures Reference OP1/OP3/OP4/SP3)
-
Are the Following site records available and up to date:
-
3.1.1 Have all materials & Services been correctly requisitioned (Inc copies of quotation / purchase orders / delivery notes / invoicing/ Docuware sign off) ( ORF1/IS1)
-
3.1.1 Is the procedure for receipt/ storage and goods returned understood by site personnel
3.2 Site Accommodation and Activities (Procedure reference OP1/OP3/SP6/COSHH)
-
3.2.1 Are all plant rooms / areas (Inc workshops, stores, welfare and office) maintained in a clean and tidy condition
-
3.2.1 Are all non public areas secured when not in use
-
3.2.1 Is appropriate spill equipment PPE, First Aid and Eye Wash equipment available
-
Are the Following site records available and up to date:
-
3.2.2 Are Chemicals controlled and stored correctly
-
3.2.2 Are COSHH assessment /MSDS been produced and registered for all substances and are available at point of use
-
3.2.2 Is site waste effectively controlled, managed and appropriately disposed off as required by current legislation
-
3.2.2 Have sub-contractors removed relevant waste from site following sub-contractor visits
4 Statutory Compliance
4.1 Emergency Lighting
-
4.1.1 Is there current and up to date test schedule for emergency lighting installation on site
-
4.1.1 Has the installation been maintained and tested in accordance with the schedule produced
-
4.1.1 Is a current annual test certificate available for the installation
-
4.1.1 Have any defects reported as a result of testing been repaired and records amended to confirm corrective action
4.2 Fire Alarm /Suppression Systems
-
Are the Following site records available and up to date:
-
4.2.1 Is a current site specific fire alarm logbook available (Inc records of periodic maintenance and test) in accordance with current legislation.
-
4.2.1 Is there a site record of fire evacuation drills (Inc who maintains the record COFELY /Customer)
-
4.2.1 Date of last fire evacuation drill completed
-
4.2.1 Does the site have a current fire risk assessment
-
4.2.1 Date of last review of fire risk assessment
-
4.2.1 Are records for fire extinguisher and suppression systems available and up to date (including confirmation of any completed repairs)
4.3 REFCOM / “F” Gas
-
Are the Following site records available and up to date:
-
4.3.1 Does the site have a up to date REFCOM /”F” Gas logbook available
-
4.3.1 Are the records being maintained in accordance with current legislation
-
4.3.1 Where COFELY engineers maintain refrigeration equipment is there evidence to confirm the COFELY REFCOM database has been updated
4.4 Water Treatment / Hygiene
-
Are the Following site records available and up to date:
-
4.4.1 Are there current and up to date logbooks for water treatment and water hygiene
-
4.4.1 Do the records include periodic testing of hot and cold water taps, shower, calorifier, stored water heater, CWS storage tank temperatures
-
4.4.1 Have any cooling towers been identified on site and information forwarded to the COFELY central database
4.5 Control of Asbestos
-
Are the Following site records available and up to date:
-
4.5.1 Is there a Asbestos register on site to confirm the presence of Asbestos
-
Is the register made freely available to all site based and visiting personnel (Inc Sub-contractors)
-
4.5.1 Date of last review
-
4.5.1 Are site and visiting personnel aware of the COFELY policy for working with Asbestos
4.6 Heating Installations and Plant
-
Are the Following site records available and up to date:
-
4.6.1 Are we responsible for boilers and heating appliance and plant on site
-
4.6.1 Are service records available
-
4.6.1 Date of last service
-
4.6.1 Is a Landlords Safety Certificate required
-
4.6.1 Date of last certificate issued if applicable
4.7 Electrical Installation Testing
-
Are the Following site records available and up to date:
-
4.7.1 Is there a current fixed wiring electrical test certificate available for site
-
4.7.1 Date last certificate issued
-
4.7.1 Is lightening protection installation and maintenance COFELY responsibility
-
4.7.1 Is a current installation test certificate available
-
4.7.1 Date last certificate issued
4.8 Pressure Systems
-
Are the Following site records available and up to date:
-
4.8.1 Have pressure systems been identified on site
-
4.8.1 Are identified systems controlled by an insurance scheme of inspection in accordance with current legislation
-
4.8.1 Date of last insurance inspection
4.9 Lifting Equipment
-
4.9 Are the Following site records available and up to date:
-
4.9.1 Are COFELY responsible for any lifting equipment including, lifting appliance, passenger carrying lifts, slings, shackles and harnesses
-
4.9.1 Are there current test insurance certificates available
-
4.9.1 Date of last periodic test / insurance inspection
4.10 Misc
-
4.10 Has the site identified any systems/ installation which require statutory inspection and test not covered in sections 4.1-4.9
-
4.10 Confirm details of systems / installations identified (see additional notes
4.11 Control of Waste
-
4.11.1 Are we acting as a waste broker for the site and are there records to support this
-
4.11.2 Has any hazardous waste been identified on site
-
4.11.3 Are Waste Transfer notes available for all waste (Inc. Hazardous Waste) on site for all waste removed
-
4.11.4 Do we have a current waste carriers license for sub-contractors who remove waste from site as part of their work activities
4.12 DSE Assessments
-
4.12.1 Do any of our staff have any special requirements relating to work stations
-
4.12.2 Has a form DSE1 been completed
4.13 Expectant Mothers
-
4.13.1 Do we have any expectant mothers on site
-
4.13.2 Has a form NEMRA1 been completed
4.14 Young Person / Trainee Management
-
4.14.1 Are there any young persons or trainees on site
-
4.14.2 Do these persons work under supervision at all times
-
4.14.3 Has form YPRA1 been completed
Non Conformance Report
-
Press to add Non conformance
NCR
-
Report No.
-
System / iCMS Ref:
- Quality
- SHE
- Commercial
- Technical
- CODIS
- H.R
-
Details of System / iCMS Ref:
-
LEVEL OF NON-CONFORMANCE
-
Details of Discrepancy:
-
Proposed Corrective & Preventative Action Target Date:
-
Person Responsible:
-
Verification of Corrective Action: to be completed by the Auditor/Manager Comments:
-
Auditor/Manager:
-
Corrective and Preventative action must be completed within 26 days of the audit.
-
Audit Completed By:
-
Audit Completed On:
-
Audit Findings Agreed By: