Information

  • Document No.

  • Site, month and year audit undertaken

  • Conducted on

  • This report has been completed based on the observations on the date given and all finding (non conformances) have been verbally advised and reported to the LT McGuinness Health and Safety manager

  • Personnel

  • Have all previous Non-Conformances and recommendations been closed out<br>ADD THE FOLLOWING QUESTIONS; Has the PCG being sent to the Health and safety manager (Monthly)<br>Provide evidence that the monthly man hours have been provided o the Health and safety manager<br>

  • Add media

1. LTM Administration

  • (*) Has project Pre-start checklist located in the Health and Safety folder been completed and returned to the Health and Safety manage

  • (*) Post incident Action plan completed with client and filed in section 31

  • (*) Is there a LTM Site Specific Safety Plan in the Health and Safety Folder (Section 3)

  • (*) Site Supervisor/ Safety supervisors Obligations read and signed by all LTM site supervisors (Section 2)

  • (*) Has Ltm Serious Harm Procedure (EM 5) been completed (Section 27)

  • (*) Has Notifiable work been notified to Work Safe NZ (Section 17)

  • (*) Has the Company Health and Safety Policy been put on the wall (Section 1)

  • (*) Has the LTM Card System signage been erected (Section 18)

  • Sign in area established

  • Morning briefing sheet completed and posted at sign in area (MEET 4)

  • Blank Health and Safety Improvement form (FORM 3) available at sign in area (Section 7)

  • Is there adequate site signage

  • Do all ltm Supervisors of Notifiable work have a current Site Safe Gold Card (Section 22)

  • Are Site Specific inductions being carried out for all staff (Section 4. INDUCT 1)

  • Site safe passport number or other construction competency provided

  • Are the Emergency procedures in place and is it up to date? (Section 12)

  • Has a trial evacuation taken place in the last 6 months (Section 25. FORM 2)and recorded

  • Are regular site Safety and enviromental meetings held and minuted at the frequency noted in the Site Specific Safety Plan ? <br>(Section 5. MEET 2)

  • Have the last health and safety meeting minutes been posted at the sign in desk

  • Has the Site Hazard register been reviewed and signed by the PM, SM or the Safety Officer in the last month (Section 8. REG 8)

  • Is there a Safety and Enviromental Hazard board with current hazards recorded and updated at least weekly

  • Weekly inspections completed? (Section 14. INSPECT 1)

  • Weekly gas leak testing being completed on Oxygen/Acetylene welding gear and the result filed (Section 14. INSPECT 3)

  • Is the LT McGuinness permit system in place? permits include height, hot work, confined spaces, ladder, J20 permit and concrete cutting and penetrations (Section 9. PERMIT 6)

  • Are permits being completed correctly and authorised (Section 9. PERMIT 1 to 11)

  • Is their evidence of a JHA (Job Hazard Analysis) /Risk assessment being completed for all significantly (High risk) hazardous works, including Notifiable works. (Section 10. SOP 1) Ref: SOP 1 Consequence matrix.

  • Heights equipment register in the H&S file on site (Section 21. REG 4)

2. Heights Administration

  • 6 monthly inspection being undertaken on heights equipment (Section 21. REG 4)

  • Emergency plan in place, briefed and signed by the teams working at height (Filed with SWMS and signed. Section 12. EM 6)

3. Scaffold Administration (Scaffolders Subcontractor file)

  • Engineers design and sign off available and design limits provided on shrink wrap scaffolds

  • Has a copy of the scaffolders Certificate of Competency been provided

  • Are scaffold fit for purpose handover certificates being complete by the scaffolding representative.

  • Is the Handover Certificate being signed by the LTM supervisor. Refer Best Practice Guidelines page 174

  • Scaf tag/Acu log /register up to date. Inspections weekly

  • Are weekly fixed scaffold inspection reports being provided by scaffold company

3.1 Special Scaffolds

  • Has a Registered Engineer designed the "Special Scaffold"

  • Is there a copy of a Registered Engineers Design Certificates for the "Special Scaffolds"

  • Has an "Advanced Certified Scaffolder" erected the Special Scaffold

3.2 Suspended Scaffold (Swinging Stage)

  • Roof suspension rigs been provide with engineers certificate

  • Roof suspension rigs have current certificate

  • Wire ropes, basket and shackles etc inspection list provided

  • Daily pre use inspection list provided and being completed

  • Emergency plan in place, briefed and signed by the teams working on Swinging Stage

  • Risk assessment or method statement completed for the tasks involving the Swinging Stage

  • Is the operators manual available on site

  • Has training been completed and a register put in place showing who is competent to operate the swinging stage

  • Has the maximum wind speed for operating the Swinging Stage been provide

  • Is there a wind speed meter available for use?

4. Asbestos Administration (Ref: SOP 7 & SOP 7A)

  • Asbestos register requested and provided by the building owner

  • Work Safe NZ notification provided for the removal of the Asbestos

  • Certificate of competency of asbestos removal supervisor supplied to site

  • Site specific Safety plan/all task analysis and removal check sheet in place and completed

  • Specific inductions provided to those who need to enter the contaminated area

  • Up to date plan of where asbestos has been found on site

  • Asbestos added to the Hazard board and Hazard register

  • Evidence of maintenance provided on decontamination unit and negative air pressure unit

  • Air test results provided

  • Disposal documentation avaliable

5. Elevated Work Platform Administration

  • All operators have suitable training and or competency records in the safe use and operation of the ewp. Mandetory Hirer training is the minimum amount of training allowed.

  • Risk assessment or method statement completed for the tasks involving an EWP

  • Emergency procedure developed in case of loss of power or operator incapacitation

6. Forklift Administration

  • Operator properly trained with evidence of (F) endorsement when driving on the road

  • Daily inspection sheet H&S being completed (Section 14. INSPECT 7)

7. Cranes, Lifting gear and Equipment Administration

  • Craned load earthquake Procedure developed, crane crew inducted on procedure and procedure signed by crane crew (Section 12)

  • Is there a current test certificate for the crane (Section 29)

  • Has the lifting gear been added to the register (Section 21. REG 5)

  • Foundation certificate from engineer (Section 29)

  • Statement confirming seismic and wind loadings for the crane configuration for both in and out of service (Section 29)

  • Daily inspection on cranes and equipment being completed (Provide Evidence) (Section 29. INSPECT 5)

  • Lift Plan completed daily when using LT McGuinness cranes (Section 10. SOP 9 Complicated lifts)

  • Are weekly inspections being carried out (Provide evidence)

  • Maeda pre-start crane check completed (Section 29. INSPECT 4)

8. Powder Actuated Tool Administration

  • Training and competency available for labour only subs, LTM employees and Sub contractors (check Section 22 of red folder plus Subs folders)

  • J20 Permits completed (Not required for SpitFire. Section 9. PERMIT 6)

9. Ladder and Podium Step Administration

  • Ladder permit being used (Section 9. PERMIT 7)

  • Ladder Inspection completed in the last 6 months (Section 14. INSPECT 2)

  • Safe Work Method Statement completed for the use of ladder (Section 10. SOP 3)

  • Ladder register completed with unique identifications logged. (Section 14. REG 3)

10. HASNO Administration

  • Existing Hazardous substances identified (lead, asbestos) and added to Hazard register (section 13)

  • Material Safety Data sheets available on site (Section 13) (or produced electronically within 5 minutes from request)

  • Hazardous substances register completed (Section 13)

  • Is PPE available, dust masks,hearing protection,eye protection and gloves for chemicals and general work

  • Task Analysis or Safe Work Method Statement completed for the use of the chemicals and substances (Section10)

11. Excavations and Trenches Administration

  • Has a Safe Work Method Statement/ Task Analysis been completed for the work and those involved been briefed and signed it

  • Is there a Traffic Management Plan in place for works outside of the construction zone that impact on road or pedestrians

  • Is there an emergency plan in place for trench collapse, contact with overhead services, in rush of water or exposure to hazardous substances in place and been briefed and signed by all involved in the process

  • Has contaminated ground sampling been done, contaminated ground removed documented and re checks been undertaken to ensure contaminant free

  • Work Safe NZ notified if excavation is in excess of 1.5m, has a depth greater than the horizontal width at the top, a vertical height of more than 5m or has an average slope steeper than a ratio of 1 horizontal to 2 vertical.

  • Daily inspections of the excavation being carried out and documented by competent person at the start of the shift or if weather conditions effect the stability of the excavation

  • Registered Engineer sign off of ground condition if approved benching battering or shields not used in all ground condition types where applicable

  • Underground services identified by referencing the councils utilities plans/marked and located before digging. Are plans updated showing exact location

12. Transport and Mobile Plant Administration

  • Wheels tracks and rollers licence endorsement (if working on the road only)

  • Operator of excavator has unit standard 17310 for operating hydraulic excavator on construction sites or has had competency training by there employer

  • Operator has 22281 unit standard "operate an excavator for facing and benching" or has had competency training by there employer

  • Task Analysis/SWMS completed for tasks involving mobile plant , signed by operator and banksman

  • Daily pre start checks being completed on the machine

  • Evidence that plant and equipment is being regularly serviced

  • Lifting chains/ slings registered and inspected

13. Confined Space Administration

  • Confined Space management plan in place including permit

  • Gas testing equipment available for use and calibration date not exceeded

14. Falsework and Formwork Administration

  • Is there safe access (Concrete placement)

  • If access scaffold attached, has it been erected by a certified scaffolder and been signed off in the register

  • Is there safe access to the form work

  • Bearers wedged centrally in fork heads

  • Steel bearer being used, timber not permitted by (LTM)

  • Screw jacks within maximum extension allowed

  • Fork heads for bearer supports

  • Correct pins and props

  • Panel props using fasteners as per propping design

  • Acrow props vertical and secured

  • Support shore loading frames and props plumb

  • False work and propping designed and approved by a suitably qualified person

  • Falsework and propping designed and approved by a suitably qualified/competent person

15. Concrete Pumping Administration

  • Plant operator and hose hand training and competency provided

  • Task analysis/Safe Work Method Statement or Hazard assessment completed and signed by all involved in the task. Emergency procedure evident also

  • Emergency procedure available

  • Emergency procedure signed by pump crew

  • Daily maintenance and pre start inspections being carried out

  • TMP in place if truck is set up outside of construction site boundary

  • Individual components have unique numbers, bends have been ultra sound tested as per ACOP. Register provided

16. Sub-contractor Performance

  • Has the sub-contractor performance form been completed and sent to the LTM Safety Manager for subs that have completed there contracted work? (View evidence in Section 28)

17. Accidents and Incidents

  • Is there an accident/incident register and is it up to date (Section 11)

  • Have all accident/incident reports been sent to the Health and Safety Manager

  • Have all incidents been reported and recorded

  • Is their a detailed description of what happened

  • Has the actual cause of the accident/incident been established

  • Have recommended actions been provided

  • Has the preventative action been completed and the report closed out

  • Add media

18. Sub-contractors (Separate Folders)

  • Name of Subcontractors whose paperwork was reviewed during the Audit. Pick three subs new and old

  • Are the Sub-Contractors Site Specific Safety Plans in place and Signed by both subcontractor and LT McGuinness supervisor (Section 1)

  • Are sub-contractors completing toolbox talks and providing the information to the Safety Forum/meeting (Section 2)

  • Are Sub-contractor Self inspections being carried out ( Section 3)

  • Do Sub-contractors have evidence of competency training for their employees ( Section 4) (For the type of work being undertaken)

  • Do all sub-contractors Supervisors of Notifiable work have a current Gold Card or NZQA unit standard in a Safety (Section 4)

  • Do all workers on site have a current Site Safe card or equivalent (Section 4)

  • Is task Analysis done for All Significant work, including the use of chemicals ( Section 5)

  • Have Sub-contractors provided a plant and equipment register including ladders (Section 6)

  • 6 monthly inspections taking place on heights equipment (Section 6)

  • Have sub-contractors provided a hazard register ( Section 7)

  • Do Sub-contractors have the MSD Sheets Avaliable and a hazardous substances register in place (Section 8)

  • Has Emergency planning been completed for all work requiring one. Includes working and harnesses, confined space, excavations and removing tower crane driver etc. (Section 9)

  • Have the TA's been signed by the workers (Section 9)

  • Have Sub-contractors Notified Work Safe NZ for notifiable work, provide evidence. (Section 10)

  • Excluding the inspections and toolbox talks, is the site Specific Safety Plan being actively managed on site check hazard register updating and TA's/risk assessment reviews have been undertaken in the last month (Section 7)

  • Add media

19. Facilities

  • Site Office clean and tidy

  • Toilet areas clean and tidy

  • Lunch room & food prep area clean and tidy

  • Hot water provided for washing hands

  • Fire Extinguishers charged and current (serviced in the previous 12 months)

  • Adequate general lighting

  • First Aid kits in place and well stocked (Within expiry date)

  • Spill kit avaliable for Chemical Spills and signage installed

  • Sprinkler/flood control kits avaliable and signage installed

  • Perimeter fences secure

  • Hoardings painted white and in good condition

  • Access to fire fighting equipment

20. Housekeeping

  • Public Protection in place

  • No radios, Ipods, MP3 players or phones playing music

  • Adequate Lighting( including provision for both general and task lighting)

  • Work areas clean and tidy, slips and trips controlled

  • Access ways clear including stairs

  • Materials stacked safely, at least 2m from open edges

  • Rubbish bins provided and in suitable quantity

  • Enclosed material waste chutes being used

  • Nets being used to cover bins where rubbish may be blown away

  • Combustable materials stowed

  • Hazardous materials controlled

  • All vertical reinforcing steel bars capped and horizontal ones where applicable

  • All materials adequately secured (weighing ply down with blocks in not sufficient) ratchet ties must be used

  • Add media

21. Personal Protective Equipment

  • Hard Hats worn (Where mandatory, or over head hazard within 5 meter radius where required)

  • Hi visibility clothing being worn

  • Adequate Safety footwear worn

  • Safety glasses/goggles being worn (Where required)

  • Respirators or masks worn (Where required)

  • Hearing Protection worn (in excess of 85db)

  • Protective clothing being worn

  • Add media

22. Asbestos

  • PPE being worn and spares available

  • Viewing station provided

  • Asbestos awareness signage installed with contact name and phone number

  • Minimum 3 zone decontamination unit provided with signage stating dirty,clean and buffer zone

  • Enclosure air tight

23. Excavations and Trenches

  • PPE being worn including hearing Protection by the banksman and the operator of the excavator

  • Is gas monitoring required in the excavation?

  • Deep excavation signage installed on fences to warn workers of hazard

  • If required, has the appropriate permit to dig been issued

  • Trench shields/sides battered or benched for excavations deeper than 1.5meters or if friable ground conditions found

  • Plant and spoil no closer than 1m from excavated edges unless excavation face is specifically shored to take loading

  • Wheel stops installed to prevent plant getting within 1m of excavated face.

  • Safe access to excavations provided by secure ladder, ramp or scaffold

  • Protection barriers and toe boards provided, mandatory requirement for excavations 1m in depth or deeper

  • Secured 1.8 m fences and signage installed on excavation in public areas

  • Services location clearly marked, above and below ground

  • Add media

24. Falsework/Formwork

  • Support shore loading frames and props plumb

  • Acrow props vertical and secured by lacing or bolting in position

  • Panel props using fasteners as per propping design

  • Correct pins in props

  • Fork heads for bearer supports

  • Screw jacks within maximum extension allowed

  • Steel bearer being used, timber is not allowed by LTM

  • Bearers wedged centrally in fork heads

  • Is there safe access to the formwork

  • If access scaffold attached, has it been erected by a certified scaffolder and been signed off in the register

  • Is there safe access for concrete placing

  • Add media

25. Welding, gas cutting and torch down

  • Welding screens,signs, area underneath barricaed to prevent access

  • Are gas bottles secured in use and/or stored correctly? Do not lay Acetylene bottles down.

  • Flash back arrestors fitted to the regulator end on both the Oxygen and fuel gas bottles. (N/A propane torch down)

  • Hoses in good condition with no perishing or burn marks

  • Guages/ regulators in full working order and not damaged (Where fitted)

  • Fire extinguishers/Fire hose reel available for gas cutting/welding, refer LTM Site Specific Safety Plan for requirements

  • Fire hose reel or charged hose pipe at torch down. Company policy and is a mandatory requirement

  • Add media

26. Confined Spaces

  • Is a confined spaces permit in place

  • Air monitored in Confined Spaces

27. Health

  • Correct PPE and PPC being worn when using chemicals or exposed to hazardous substances (dehydration, environmental, dust, noise)

28. Work at Height

  • People using harnesses are trained and competent or under direct supervision

  • Rescue Plan in place and team briefed.

  • Task Analysis completed for height works being undertaken

  • Anchors/static lines installed by a qualified and competent person with NZQA 15757

  • Harnesses used and fitted correctly (connected to anchor points)

  • Fall restraint being adopted in preference to fall arrest

  • Are fall hazards controlled

  • Guardrails in place where required

  • Holes and floor penetration covered or barricaded

  • Add media

29. Penetrations in excess of 300mm square

  • Penetration covers secured and display suitable signage stating "DO NOT REMOVE HOLE BELOW SEE LTM SAFETY OFFICER"

  • Have task analysis been submitted for removal of floor and penetration covers

  • Add media

30. Standard Fixed Length Ladders

  • Is the ladder required for the task? Could an alternative and safer means of access/platform be used

  • Only being used for short duration work, i.e. less than 5 mins

  • Are ladders in good condition with no damage to rungs or sides

  • Industrial rated

  • Being used correctly so that 3 points of contact may be maintained ( two feet one hand, two feet and body area above the hips, one foot two hands.

  • Is secured (base and/or top)

  • At correct angle- 4 up to 1 out

  • Does it Project 1 meter above step off point

  • Is registered and has unique ID markings

  • Add media

31. Step Ladders

  • Is a step ladder required for the task? Could an alternative and safer means of access/platform be used

  • Only being used for short duration work less than 5 minutes

  • Industrial rated

  • Are ladders in good condition. feet, rivots etc.

  • Set up on firm level ground

  • Set up correctly with ladder lock bars and stays in place

  • Is the correct length so that 3 points of contact may be maintained ( two feet one hand, two feet and body area above the hips, one foot two hands.

  • has unique ID markings (Tagged)

  • Add media

32. Podium Steps

  • Are podium steps in good condition. feet, bolts, rail, free from defects

  • Step up on firm level ground

33. Fixed Scaffolds

  • Scaff tag/Acu log clearly displayed

  • Suitable for the job (light, medium or heavy weight duty)

  • Access to the scaffold is adequate

  • Ladders on scaffolds suitable- 4 up to 1 out, secured1m past the step off or suitable hand holds

  • Ladder protrudes 1m past the step off area or suitable hand holds

  • Tortured path provided or gate at entry to each scaffold levels where a ladder is used

  • Scaffold hatches closed to prevent falls. (Note that hatches may be left open if tortured path is provided)

  • Hand (Top) rail between 1.1m and 900mm

  • Mid Rail between 450mm and 550mm

  • Gap between the scaffold and the work face greater than 300mm has hand and mid rails and toe boards fitted or plank installed

  • Debris netting in place, lapped correctly as per Scaffolding Best Practice Guidelines and no holes

  • Platforms adequate. 3 planks minimum, butted and secured or 2 plank wide on Layher system

  • Toe boards in place and more than 150mm high

  • Material guards in place and secured if material stacked higher than the toe board

  • Adequate base plates/sole boards and they are fully grounded with no gaps under

  • Scaffold decks clear of rubbish, plant and equipment

34. Suspended Scaffold (Swinging Stage)

  • Are sufficient counter weights secured in place

  • Are operations within the Safe a Working Load (SWL) of the platform

  • Are roof suspension rigs secured against movement

  • Is the power cable prevented from becoming dislodged or damaged

  • Are operators all using a safety harness

  • Are workers connected to independent safety line or engineered anchor system

  • Are warning notices and barricades at ground level

  • Has the safe operating wind speed been posted on the swinging stage

  • Is there a wind speed meter available in the basket for the workers to use

35. Mobile Scaffolds

  • Suitable for the job

  • Set up on firm level ground

  • Wheels locked

  • Access hatch to deck is closed when in use

  • Fully decked and decks are secured

  • Hand (top) Rails between 900mm and 1100mm

  • Mid Rails between 450mm and 550mm

  • Scaffold being accessed from inside via ladder or frames

  • No higher than 3 times the base width

  • If scaffold is more than 3 times the base width outriggers are out riggers fitted

  • Narrow scaffolds 1m wide or less at the base may only erected to twice there high without the use of outriggers

  • Scaf tag/Aculog clearly displayed (Ref: Regulation 56)

  • Signage installed to LTM mobiles stating "Scaffold is not to be altered or erected by persons who are untrained or are not competent".

  • No mixed scaffold part. Tube a clip scaffold connectors/clips may not be used on Aluminium Mobile scaffolds.

  • Add media

36. Special Scaffolds

  • Has a Registered Engineer Designed the Special Scaffold

  • Stable and secured support structure

  • Hand rails installed between 900mm and 1100mm

  • Mid rails installed between 450mm and 550mm

  • Toe boards fitted

  • Platform minimum width 675mm (3 planks)

  • Add media

37. Concrete Pumps/Concrete Pours

  • Plant operator and hose hand trained and competent

  • Concrete pumps Wind rating is not exceeded

  • Pipe connection points secured and pipe is straight to avoid unnecessary bends

  • Pipe clamp pins in place and tether in place from boom to first flexible pipe

  • Isolations in place to keep pedestrians away from work activity

  • Concrete line position designed to limit trips and excessive pipe requirements

  • Spotter in place to assist driver when positioning plant, spotter in position where driver can see him and not standing between the hopper and the concrete delivery truck

  • Workers wearing correct PPE for wet concrete. Includes hard hat, waterproof foot ware, goggles, gloves and long clothing.

  • Workers wearing hearing protection

  • Truck/pump exhaust positioned to blow outside to limit exposure to fumes. Engineered controls if necessary

  • Concrete pump boom at least 4m away from electrical lines

  • Concrete pumping truck set up so that its outriggers when fully extended are the depth of the excavation plus 1m i.e 1.5m deep excavation means truck stabiliser must be 2.5m back

  • Ground adequately compacted or pad used under stabilisers on soft ground

  • Hopper guard in the closed and unable to be opened unless special tool used position

  • Area under the boom isolated to ensure no one goes under it

  • Hose length long enough so that it does not need stretching to required location. Hose is vertical

  • Pump hand familiar with hand signals

  • Warning signs clear and in good condition

  • Person standing on hopper guard? Unsafe act mark as non compliant

  • Log book and maintenance manual in the truck and completed, records should include record of defects and inspection of equipment must be carried out by a chartered engineer

  • Delivery pipeline supported and secured

  • Cranes/ hoist towers, scaffold and formwork not to be used to secure pipelines to unless they are engineered for the purpose

  • Pipe bends that go from horizontal to vertical are bolted down

38. Elevated Work Platforms (EWP)

  • Owners inspection carried out in the last 3 months or when brought to site

  • Copy of last inspection sheet held in the waterproof pouch

  • Before use inspections being carried out and log book completed

  • Task Analysis/SWMS or written Hazard assessment completed for tasks being undertaken from MEWP

  • Machine isolated from other workers

  • Set up on firm level ground, support legs out

  • Inspected and tested within the last 6 months

  • Must be kept at least 4m away from over head power lines

  • Is EWP deck clear of debris/buckets used to store tools and bolts etc. to reduce trip hazards

  • Fall Restraint harness and lanyard being worn (n/a scissor hoist)

  • Emergency procedure developed in case of loss of power or operator incapacitation

  • Harness lanyard just long enough

  • Workers requiring to wear Fall restraint Harness trained and competent to do so or under direct supervision of person who has NZQA 15757

  • Add media

39. Transport and Mobile Plant

  • Effective HGV truck movements controlled keeping pedestrians away from vehicle movements

  • Work area isolated and safe path for workers provided

  • HGV and plant at least the depth of excavation plus 1m away from trench/excavation sides if 45 degree angle drawn. i.e 1.5m excavation should have clear distance to plant and HGV of 2.5m.

  • Ask operator to provide daily pre start check on the machine

  • Machine operating at least 4 meters from power lines

  • Safe approach to machine being used by workers, blind spots in front and behind being managed

  • Quick hitch working correctly and locking pin in place where applicable

  • No excessive wear on pivot points on machine

  • Hydraulic hoses in good order with no excessive leaks

  • Seat belt effective and in good repair and being used by the operator

  • Seat belt being worn by operator

  • Warning beacon turned on when operating on the road

  • Warning Beacon in full working order

  • Machine movement warning devices present active, include audible alarm and flashing lights

  • Reversing aids fitted were appropriate

  • If Mirrors are in place are they in full working order

  • If machine has rear camera is it in full working order

  • Disengaged buckets stored safely

  • Machines working a safe distance from the edge of the excavation. (depth of excavition plus 600mm minimum)

  • Fitted with operator protective structures

  • ROPS/ FOPS/OPS structure in good repair

  • Lifting chart available in the machine for operator use.

  • Lifting points on excavator certified and in good condition

  • Person attaching chains/slings to load and excavator have correct dogging/ slinging / rigging qualifications

  • Lifting being undertaken as per Approved Codes of Practice Load Lifting Rigging

  • Burst protection valves fitted if digger is in excess of seven Tonnes or more (after 1 Jan 2016)

  • 3 points of contact being used to enter and exit the excavator

  • Vehicles securely loaded

  • Vehicle warning signs displayed

  • Chains and slings in good order and inspection tags are current

  • Reversing vehicles are controlled by spotters

40. Electrical Tools

  • All electrical equipment set up correctly and secured in place where required

  • Tool guards secure and in good order

  • Angle grinders guard secure and both handles on the machines in use

  • Materials being worked by hand tools secured correctly

  • Second handle on Dynadrill in place and tool being used correctly

  • automatic operating switch or Dead Mans Switch in place and working

  • Bench saw- riving knife and crown guard in good order

  • Draw saw/Drop saw in good order and guards working freely

  • All operatives wearing the correct PPE (including full face shield and/or goggles for use of angle grinder

  • Blades and discs are sharp fit for purpose and not deformed

  • Plugs on equipment are heavy duty. Hard plastic plugs sometimes referred to as domestic plugs are not allowed to be used on equipment or tools except battery chargers kept in the site office

41. Compressed Air Tools and Equipment

  • Compressed air-matched and secured connections

  • Whip arresters in place and fitted correctly on air hoses and tools

  • Hoses in good order, no perishing, splits or leaks

  • Dust being controlled by use of vacuums when scrabbling concrete

  • All operatives wearing the correct PPE (including full face shield and/or goggles)

42. Cranes and Lifting Appliances

  • Emergency evacuation for operator have been established

  • Emergency harness and ropes in cab of crane available for use and emergency rescue team established

  • Operator decal legible

  • Daily Lift Plan completed for general lifts, LTM H&S 49

  • Full Safe work Method Statement completed for complicated lifts

  • Tag lines being used to control load

  • Operators manual and hand signal chart with the crane

  • Test weights available for tower crane weekly limit checks

  • Drawings, manuals, specifications, certificates, operational procedures, rating sheet available for viewing

  • Mobile crane set up level and true

  • Approved safe load indicator is set to maximum capacity of foundation design

  • Crush zone on mobile cranes isolated and signage installed

  • Crane wind speed meter fully operational

  • Lifting capacity chart with the crane

  • Overload Warning devices and voices in English

  • Outriggers fully deployed on mobile cranes

  • Check that slider locking pins are deployed

  • Signage in place warning of overhead loads and restricted access signage in loading zone

  • Check slings, chains, turfers and chain blocks certified and in good order

  • Check that the crane driver and the dogman trained appropriately and competent

  • Add media

43. Forklift

  • Seat belt in good repair

  • Seat belt being used by operator

  • Drivers and operators properly trained with evidence of certificate and licence (F) endorsement if driving on the road (Section 22)

  • Vehicle securely loaded

  • Forklift operating warning signs displayed

  • Reversing controlled by spotters if drivers line of site impeded

  • Fitted with operator protective structures

  • Protective structure in good repair

  • Safety warning devices including lights and horn in full working order

  • Forklift stored/parked and or being charged in a suitable location away from pedestrian thoroughfares

  • Add media

44. Powder Actuated Tools

  • Isolation and signage in accordance with ACOP

  • Check Tool has 6 monthly certificate

  • Tool and charges securely stored when not in use

  • 3 second verbal warning given

  • Hearing and eye protection being worn

  • Check Permit has been completed where required

  • Miss fires being collected and put in approved container ready to send back to Ramset/Hilti

  • Add media

45. Electrical

  • Main switchboard door locked

  • 3 phase power socket installed at the electrical distribution board for connecting a 3 Phase Lifeguard

  • Lifeguard units tagged 3 monthly

  • No damage evident on tool housing, electrical plugs and cords

  • Tools and Leads tagged 3 monthly

  • Leads protected in traffic areas

  • Leads clear of water/elevated/taped down at door ways and are against the walls to reduce trip hazards

  • Industrial splitter boxes and double adaptors only in use with RCD's

  • RCD protection used on portable generators

  • RCD protection used with internal power points (minimum IP 33)

  • Add media

46. Environmental

  • Is there an environmental emergency response plan in place and displayed in a central location

  • Is there an environmental plan in place for this site

  • Are relevant environmental impacts and control strategies detailed upon the site Environmental Hazard Board

  • Is construction noise being controlled in accordance with the requirements of the conditions of contract

  • Have environmental incidents been registered in the accident/incident register

  • Is the project recycling waste products

  • Are there silt controls in place

  • Is there a spill kit on site

  • Is dust controlled

  • Is there a truck tyre wash system in place

  • Wash area provided for paint, plaster and concrete

  • Add media

47. Traffic Management

  • Is there a (CAR) TMP for this site and within date range

  • Is there a copy of the TMP on site

  • Is there a qualified traffic controller on site

  • Is traffic signage as per the TMP

  • Are there controls in place to isolate pedestrians from construction and vehicular operations beyond the site boundary

  • Spotters in place for reversing vehicles

  • Add media

48. Completion

  • Safety Behavioural Observations (optional)

  • Signed by Site Representative

  • Signed by Auditor

  • Signed and dated by Site Supervisor to confirm action items and Non-conformances have been closed out

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.