Section 01 - Initial Checks
Section 01 - Physical Environment
A. Verify physical inventory of all equipment to be assigned to this project via BOM, change orders, proposal, and drawings.
-
1. Do all delivery tickets correctly indicate equipment LOCATION in facility?
B. Check rack wiring for proper industry standards:
-
1. Are Video, RGB, line level audio, mic level audio, RF cable, on right side of rack separated in groups based on like signals, when looking from the back of the rack?
-
2. Are Control, speaker level audio, and power cables separated by like groups on the left side of rack when looking from the back?
-
3. Are all cables neatly grouped using flush-cut tie-wraps (or Velcro)?
-
4. Are all cables labeled directly behind the connectors (same distance) and labeled according to the drawings?
-
5. Do the cables that go to terminal blocks, phoenix connectors or spade lugs have 1 inch of heat shrink?
-
6. Are the shields covered by an insulator if they are being used for ground reference?
-
7. Do the cables bend due to the weight of the wires? If so, are lacing bars used to apply strain relief to cables?
-
8. Has strain relief been installed for individual cables per Infocomm Standards?
-
9. Is there snake skin for cables entering the rack from the wall, floor or ceiling, are the cables kept neat and combed straight?
-
10. If there is a pass-through wall connection to the rack are the cables protected from the edges of the box by a chase nipple or other means, making sure not to nick the wires that pass through the box?
-
11. Has power been properly distributed throughout the rack as per the shop wiring diagrams and are there spare outlets?<br>
-
a. Are the amplifiers on a delay so that they are turned on last and turned off first?
-
b. Is the control system and router on an un-switched outlet?
-
c. Are there other devices that you would consider to be required to be on un-switched power? List them.
-
d. Is power wired in such a way that devices may be easily removed from the rack for servicing?
-
12. Is all the equipment in the rack mounted and secured according to the rack elevation drawing and using proper rack mounts? (Use hand tight torque to secure screws)
-
13. If there are patch bays are they wired in the proper manner?
-
14. Are all blank spaces in the rack filled?
-
15. Do all the connectors appear to be secured and in good physical condition?
-
16. Are all field cables plenum rated? Please note any exceptions.
-
17. Where multiple cables are grouped together, are terminal blocks used instead of landing multiple conductors on to one screw terminal?
-
18. Is there a Diversified Logo panel at the top of the rack?
-
19. Is equipment in the rack labeled as to room (for racks serving multiple rooms)?
-
20. Have devices been labeled as to their function or specific ID as shown on the AV drawings?
-
21. Is Owner Furnished Equipment installed per scope?
C. Check mounting of equipment.
2. Flat Panel Mounts.
-
a. Are these the correct flat panel monitors?
-
b. Are they in the correct location as the drawings show?
-
c. Are they fed from a recessed receptacle from behind so the cables are hidden?
-
d. Are all the connections in their proper location?
-
e. Are they mounted plumb and square?
-
f. Is there ventilation around the display?
4. Wall Interfaces, Connection Plates.
-
a. Are they plumb and square?
-
b. Are they correctly labeled?
-
c. Do they match the color of other plates in the room (electrical, network, etc)?
-
d. If it is a wall interface that is not using a particular connector, is that connector <br>removed and blanked off (no holes)?
-
e. Have the proper signal level connector types been used for the plates, i.e. a <br>microphone should have an XLR not an RCA connector?
-
f. Are all other services terminated in it (network, telco)?
-
g. Is the plate adjacent to power/data?
1. Racks.
-
a. Is equipment separated according to classification and labeled accordingly?
2. Field Wiring.
-
a. Is field wiring correctly routed per its classification?
Section 02 Documentation
A. Project (Job) Book.
-
1. Is it on site?
-
2. Does it include the original scope and all change orders?
-
3. Are the redline drawings in it and ready for the Field Engineer?
B. Trash and Cleanup.
-
1. Are the rooms clean and all trash removed?
-
2. Has the floor been vacuumed?
C. Manuals and Remotes.
-
1. Have the manuals and remotes been formally delivered to the customer? (If not, please ensure that these are brought back to the shop to be organized and properly delivered by the PM)
-
D. Address any issues you find to the PM.