Information
-
Block Name & Postcode
-
Block I.D
-
Date of survey
-
Surveyed by
-
System Type
Survey
Details
-
IF BLOCK NEEDS TO BE SPLIT INTO MORE THAN ONE SYSTEM, A SEPARATE SURVEY MUST BE CARRIED OUT FOR EACH.
-
Number of units for this system?
-
Number of floors? (G + 1,2 etc)
-
Is Parking available?
-
Why is no parking available?
-
Client will need to be informed of parking issues and asked if there is any alternative, client may be able to provide a permit or permission to park.
-
Type of parking available?
-
Pay & Display type?
-
Cost per Hour?
-
Are there any existing dishes on the building?
-
Number of existing Sky mini dishes?
-
Number of connections from Sky dishes?
-
Number of existing Foreign dishes?
-
Photos of block with dishes
-
Any access requirements? Please specify (I.E- Residents flat no: access codes for doors or gates, keys required)
-
TYPE OF SYSTEM REQUIRED.
- Shared Dish only (Standard system)
- Shared Dish with some pre-cable
- Shared Dish with Full pre-cable
- I.R.S (5 Wire)
- I.R.S (9 wire Sky+ & Hotbird)
- SCR/SCS
-
Total number of connections to be upgraded. (Please count total number of cables connected that require upgrading) N,B - This must be completed by surveyor on site.
-
Install Type?
System Design (Equipment locations & method)
Dish
-
Details of Dish Location
-
Photos of Dish Location
-
Bracketry Required?
-
Size of T & K"s Required?
Head-ends
-
Internal or External?
-
Will Riser floors require drilling?
-
Drilling Type?
-
Number of holes required? (Drilling company to be contacted and asked to provide quotation)
-
Details of Main Head-end Location
-
Photos of Main Head-end Location (draw diagrams on photos)
-
Number of units to be fed from Main Head-end
-
Longest cable run from Main Head-end? (Flat no: & Mtr)
-
Are Sub Head-ends Required?
-
How many Sub Head-ends are required. (Add each additional Sub Head-end as required)
Sub Head-end
-
Details of Sub Head-end Location
-
Photos of Sub Head-end Location (draw diagrams on photos)
-
Number of units Sub Head-end will feed?
-
Longest Cable run from Sub Head-end? (Flat number & Mtrs)
-
Distance from Main Head-end/Sub Head-end
Cables
-
Has the Developer had the cabling installed?
-
Is this of suitable quality (CT100 or equivalent)
Cable Routes
-
Cable Routes (Provide details of how and where cables will be run)
-
Photos of Cable routes (draw diagrams on photos)
-
Cables/Looms to be run on?
-
How much Cable Tray is required? (Metres)
-
Is containment required for cable runs (Internal only)
-
Type of Trunking required?
-
Amount required? (Mtrs)
Power & Earth
-
Type Required?
-
Is there an existing Earth block?
-
Photo of existing earth block
-
Make of Consumer unit
-
Photo of consumer unit
-
Any spare ways on Consumer unit?
-
Are there any existing sockets that a new spur could be taken from?
-
An Electrician will need to visit site and see where power can be taken from
-
Details
-
Photo of existing socket
-
How many?
-
Location of Intake cupboard/Plant room
-
Access to cupboard (please specify)
-
Please State
-
Details of Power/Earth Route
-
Photos of Power/Earth route (draw diagrams on photos)
-
Is Containment required?
-
How many metres of 25x16mm Trunking required?
Labour
-
How many days will it take to complete installation (Including all dish removals)?
-
Is a 2 man team required?
-
Is Special Heights required?
System Design (Equipment locations & method)
Dish
-
Details of Dish Location
-
Photos of Dish Location
-
Bracketry Required?
-
Size of T & K"s Required?
Head-ends
-
Internal or External?
-
Will Riser floors require drilling?
-
Drilling Type?
-
Number of holes required? (Drilling company to be contacted and asked to provide quotation)
-
Details of Main Head-end Location
-
Photos of Main Head-end Location (draw diagrams on photos)
-
Number of units to be fed from Main Head-end
-
Longest cable run from Main Head-end? (Flat no: & Mtr)
-
Are Sub Head-ends Required?
-
How many Sub Head-ends are required. (Add each additional Sub Head-end as required)
Sub Head-end
-
Details of Sub Head-end Location
-
Photos of Sub Head-end Location (draw diagrams on photos)
-
Number of units Sub Head-end will feed?
-
Longest Cable run from Sub Head-end? (Flat number & Mtrs)
-
Distance from Main Head-end/Sub Head-end
Cable Routes
-
Trunk Cable Routes (Provide details of how and where cables will run from dish to head-end)
-
Photos of Trunk Cable routes (draw diagrams on photos)
-
Cables/Looms to be run on?
-
How much Cable Tray is required? (Metres)
-
Is containment required for cable runs (Internal only)
-
Type of Trunking required?
-
Amount required? (Mtrs)
-
Condition of the existing cabling (current connections to flats)
-
Photos of existing cabling
Power & Earth
-
Type Required?
-
Is there an existing Earth block?
-
Photo of existing earth block
-
Make of Consumer unit
-
Photo of consumer unit
-
Any spare ways on Consumer unit?
-
Are there any existing sockets that a new spur could be taken from?
-
An Electrician will need to visit site and see where power can be taken from
-
Details
-
Photo of existing socket
-
How many?
-
Location of Intake cupboard/Plant room
-
Access to cupboard (please specify)
-
Please State
-
Details of Power/Earth Route
-
Photos of Power/Earth route (draw diagrams on photos)
-
Is Containment required?
-
How many metres of 25x16mm Trunking required?
Labour
-
How many days will it take to complete installation (Including all dish removals)?
-
Is a 2 man team required?
-
Is Special Heights required?
-
A Commissioning Certificate must be filled out at survey and all relevant Signal Readings for the existing system must be recorded and a photo attached
-
Photo of Commissioning Certificate for Existing system
Details of Existing System
-
Please provide as much detail as possible on the current system. I.E - Existing Dish location & condition, head-end locations, switches located on which floors, number of connections off each switch, power & earth situation. Etc.
Dish
-
Details of Existing Dish Location
-
Photo of Existing Dish
-
Condition of Existing Dish (Will it need replacing?)
- Dish is in good condition and does not need replacing
- Dish needs to be replaced
- LNB needs to be replaced
- Bracketry needs to be replaced
- Other
-
Details
-
Is the Dish Correctly Earthed?
-
Earth Bonding Method
-
Photos of Earth Route
-
Any additional Dish info
Head-ends
-
Internal or External
-
Details of Existing Head-ends (Provide Launch Amp & Switch details, location details & number of connections from each switch)
-
Photos of existing Head-ends
-
Are the Switches Earth Bonded?
-
Earth Bonding Method
-
Photos of Earth Route
Existing Cables
-
Condition of existing cables (Are they CT100 or equivalent)
-
Photos of existing cables
System Design (Equipment locations & method)
Aerials
-
Details of Aerial Rig Location
-
Photos of Aerial Rig Location
-
Bracketry Required?
-
Size of T & K"s Required?
Dishes
-
Details of Dish Locations
-
Photos of Dish Locations
-
Bracketry Required?
-
Size of T & K"s Required?
Head-ends
-
Internal or External?
-
Will Riser floors require drilling?
-
Drilling Type?
-
Number of holes required? (Drilling company to be contacted and asked to provide quotation)
-
Details of Main Head-end Location
-
Photos of Main Head-end Location (draw diagrams on photos)
-
Number of units to be fed from Main Head-end
-
Longest cable run from Main Head-end? (Flat no: & Mtr)
-
Are Sub Head-ends Required?
-
How many Sub Head-ends are required. (Add each additional Sub Head-end as required)
Sub Head-end
-
Details of Sub Head-end Location
-
Photos of Sub Head-end Location (draw diagrams on photos)
-
Number of units Sub Head-end will feed?
-
Longest Cable run from Sub Head-end? (Flat number & Mtrs)
-
Distance from Main Head-end/Sub Head-end
Cable Routes
-
Cable Routes (Provide details of how and where cables will be run)
-
Photos of Cable routes (draw diagrams on photos)
-
Cables/Looms to be run on?
-
How much Cable Tray is required? (Metres)
-
Is containment required for cable runs (Internal only)
-
Type of Trunking required?
-
Amount required? (Mtrs)
Power & Earth
-
Type Required?
-
Is there an existing Earth block?
-
Photo of existing earth block
-
Is Remote power required?
-
Make of Consumer unit
-
Photo of consumer unit
-
Any spare ways on Consumer unit?
-
Are there any existing sockets that a new spur could be taken from?
-
An Electrician will need to visit site and see where power can be taken from
-
Details
-
Photo of existing socket
-
How many?
-
Location of Intake cupboard/Plant room
-
Access to cupboard (please specify)
-
Please State
-
Details of Power/Earth Route
-
Photos of Power/Earth route (draw diagrams on photos)
-
Is Containment required?
-
How many metres of 25x16mm Trunking required?
Labour
-
How many days will it take to complete installation (Including all dish removals)?
-
Is a 2 man team required?
-
Is Special Heights required?
System Design (Equipment locations & method)
Aerials
-
Details of Aerial Rig Location
-
Photos of Aerial Rig Location
-
Bracketry Required?
-
Size of T & K"s Required?
Dish
-
Details of Dish Location
-
Photos of Dish Location
-
Bracketry Required?
-
Size of T & K"s Required?
Head-ends
-
Internal or External?
-
Will Riser floors require drilling?
-
Drilling Type?
-
Number of holes required? (Drilling company to be contacted and asked to provide quotation)
-
Details of Main Head-end Location
-
Photos of Main Head-end Location (draw diagrams on photos)
-
Number of units to be fed from Main Head-end
-
Longest cable run from Main Head-end? (Flat no: & Mtr)
-
Are Sub Head-ends Required?
-
How many Sub Head-ends are required. (Add each additional Sub Head-end as required)
Sub Head-end
-
Details of Sub Head-end Location
-
Photos of Sub Head-end Location (draw diagrams on photos)
-
Number of units Sub Head-end will feed?
-
Longest Cable run from Sub Head-end? (Flat number & Mtrs)
-
Distance from Main Head-end/Sub Head-end
Cable Routes
-
Cable Routes (Provide details of how and where cables will be run)
-
Photos of Cable routes (draw diagrams on photos)
-
Cables/Looms to be run on?
-
How much Cable Tray is required? (Metres)
-
Is containment required for cable runs (Internal only)
-
Type of Trunking required?
-
Amount required? (Mtrs)
Power & Earth
-
Type Required?
-
Is there an existing Earth block?
-
Photo of existing earth block
-
Is Remote power required?
-
Make of Consumer unit
-
Photo of consumer unit
-
Any spare ways on Consumer unit?
-
Are there any existing sockets that a new spur could be taken from?
-
An Electrician will need to visit site and see where power can be taken from
-
Details
-
Photo of existing socket
-
How many?
-
Location of Intake cupboard/Plant room
-
Access to cupboard (please specify)
-
Please State
-
Details of Power/Earth Route
-
Photos of Power/Earth route (draw diagrams on photos)
-
Is Containment required?
-
How many metres of 25x16mm Trunking required?
Labour
-
How many days will it take to complete installation (Including all dish removals)?
-
Is a 2 man team required?
-
Is Special Heights required?
System Design (Equipment locations & method)
-
Reason why Full Pre-Cable
Dish
-
Details of Dish Location
-
Photos of Dish Location
-
Bracketry Required?
-
Size of T & K"s Required?
Head-ends
-
Internal or External?
-
Will Riser floors require drilling?
-
Drilling Type?
-
Number of holes required? (Drilling company to be contacted and asked to provide quotation)
-
Details of Main Head-end Location
-
Photos of Main Head-end Location (draw diagrams on photos)
-
Number of units to be fed from Main Head-end
-
Longest cable run from Main Head-end? (Flat no: & Mtr)
-
Are Sub Head-ends Required?
-
How many Sub Head-ends are required. (Add each additional Sub Head-end as required)
Sub Head-end
-
Details of Sub Head-end Location
-
Photos of Sub Head-end Location (draw diagrams on photos)
-
Number of units Sub Head-end will feed?
-
Longest Cable run from Sub Head-end? (Flat number & Mtrs)
-
Distance from Main Head-end/Sub Head-end
Cable Routes
-
Cable Routes (Provide details of how and where cables will be run)
-
Photos of Cable routes (draw diagrams on photos)
-
Cables/Looms to be run on?
-
How much Cable Tray is required? (Metres)
-
Is containment required for cable runs (Internal only)
-
Type of Trunking required?
-
Amount required? (Mtrs)
Power & Earth
-
Type Required?
-
Is there an existing Earth block?
-
Photo of existing earth block
-
Is Remote power required?
-
Make of Consumer unit
-
Photo of consumer unit
-
Any spare ways on Consumer unit?
-
Are there any existing sockets that a new spur could be taken from?
-
An Electrician will need to visit site and see where power can be taken from
-
Details
-
Photo of existing socket
-
How many?
-
Location of Intake cupboard/Plant room
-
Access to cupboard (please specify)
-
Please State
-
Details of Power/Earth Route
-
Photos of Power/Earth route (draw diagrams on photos)
-
Is Containment required?
-
How many metres of 25x16mm Trunking required?
Labour
-
How many days will it take to complete installation (Including all dish removals)?
-
Is a 2 man team required?
-
Is Special Heights required?
System Design (Equipment locations & method)
Dish
-
Details of Dish Location
-
Photos of Dish Location
-
Bracketry Required?
-
Size of T & K"s Required?
Head-ends
-
Internal or External?
-
Will Riser floors require drilling?
-
Drilling Type?
-
Number of holes required? (Drilling company to be contacted and asked to provide quotation)
-
Details of Main Head-end Location
-
Photos of Main Head-end Location (draw diagrams on photos)
-
Number of units to be fed from Main Head-end
-
Longest cable run from Main Head-end? (Flat no: & Mtr)
-
Are Sub Head-ends Required?
-
How many Sub Head-ends are required. (Add each additional Sub Head-end as required)
Sub Head-end
-
Details of Sub Head-end Location
-
Photos of Sub Head-end Location (draw diagrams on photos)
-
Number of units Sub Head-end will feed?
-
Longest Cable run from Sub Head-end? (Flat number & Mtrs)
-
Distance from Main Head-end/Sub Head-end
Cable Routes
-
Cable Routes (Provide details of how and where cables will be run)
-
Photos of Cable routes (draw diagrams on photos)
-
Cables/Looms to be run on?
-
How much Cable Tray is required? (Metres)
-
Is containment required for cable runs (Internal only)
-
Type of Trunking required?
-
Amount required? (Mtrs)
Power & Earth
-
Type Required?
-
Is there an existing Earth block?
-
Photo of existing earth block
-
Is Remote power required?
-
Make of Consumer unit
-
Photo of consumer unit
-
Any spare ways on Consumer unit?
-
Are there any existing sockets that a new spur could be taken from?
-
An Electrician will need to visit site and see where power can be taken from
-
Details
-
Photo of existing socket
-
How many?
-
Location of Intake cupboard/Plant room
-
Access to cupboard (please specify)
-
Please State
-
Details of Power/Earth Route
-
Photos of Power/Earth route (draw diagrams on photos)
-
Is Containment required?
-
How many metres of 25x16mm Trunking required?
Labour
-
How many days will it take to complete installation (Including all dish removals)?
-
Is a 2 man team required?
-
Is Special Heights required?
System Design (Equipment locations & method)
-
Number of units to be fed from this system?
-
Number of Pre-cables Required?
-
Reasons for Pre-cables?
Dish
-
Details of Dish Location
-
Photos of Dish Location
-
Bracketry Required?
-
Size of T & K"s Required?
Head-ends
-
Internal or External?
-
Will Riser floors require drilling?
-
Drilling Type?
-
Number of holes required? (Drilling company to be contacted and asked to provide quotation)
-
Details of Main Head-end Location
-
Photos of Main Head-end Location (draw diagrams on photos)
-
Number of units to be fed from Main Head-end
-
Longest cable run from Main Head-end? (Flat no: & Mtr)
-
Are Sub Head-ends Required?
-
How many Sub Head-ends are required. (Add each additional Sub Head-end as required)
Sub Head-end
-
Details of Sub Head-end Location
-
Photos of Sub Head-end Location (draw diagrams on photos)
-
Number of units Sub Head-end will feed?
-
Longest Cable run from Sub Head-end? (Flat number & Mtrs)
-
Distance from Main Head-end/Sub Head-end
Cable Routes
-
Cable Routes (Provide details of how and where cables will be run)
-
Photos of Cable routes (draw diagrams on photos)
-
Cables/Looms to be run on?
-
How much Cable Tray is required? (Metres)
-
Is containment required for cable runs (Internal only)
-
Type of Trunking required?
-
Amount required? (Mtrs)
Power & Earth
-
Type Required?
-
Is there an existing Earth block?
-
Photo of existing earth block
-
Is Remote power required?
-
Make of Consumer unit
-
Photo of consumer unit
-
Any spare ways on Consumer unit?
-
Are there any existing sockets that a new spur could be taken from?
-
An Electrician will need to visit site and see where power can be taken from
-
Details
-
Photo of existing socket
-
How many?
-
Location of Intake cupboard/Plant room
-
Access to cupboard (please specify)
-
Please State
-
Details of Power/Earth Route
-
Photos of Power/Earth route (draw diagrams on photos)
-
Is Containment required?
-
How many metres of 25x16mm Trunking required?
Labour
-
How many days will it take to complete installation (Including all dish removals)?
-
Is a 2 man team required?
-
Is Special Heights required?
Faceplates
-
Are Faceplates Required?
-
Type of Faceplate Required
-
How many Faceplates are Required?
-
An accurate description of where the sockets will be installed inside the flats must be provided. Make sure that windows open if no access with Ladders and also provide photos with diagrams of exact entry points Etc
-
Description of Entry Points
-
Photos of Entry Points (Draw diagrams on photos)
-
Description of where faceplates will be fitted
-
Photos of faceplate locations (Draw diagrams on photos)
Stock Required
Stock Required to complete installation (Including all dish removals)
-
Please enter ALL stock required to complete the entire installation, including the removal of all dishes/Re-connections. This must include all hardware such as dish, LNB, correct number of switches and cabinets etc but this must also show all consumables that will be needed, I.E- Cable, Ties, clips, cat wire, eyebolts, tensioner s etc,
Remember that this stock will be pre-picked at the warehouse so items listed will need to be as accurate as possible!
Dish & Aerials (Quantity required)
-
Dish TD78
-
Aerial (Triax QR12WF)
-
Aerial FM
-
Aerial Dab
-
Quatro LNB
-
UHF/FM/DAB Combiner (V24 310)
Bracketry (Quantity required)
-
Mast 12ft x 2" Aluminium
-
Mast 12ft x 2"Steel
-
8 Nut Clamp
-
"L" Tube (Small)
-
"L" Tube (Large)
-
12" T & K's
-
18" T & K's
-
24" T & K's
-
36" T & K's
-
U Bolts 2.5"
-
Lashing Kit (Small)
-
Lashing Kit (Large)
-
Lashing Kit (Double)
-
NPRM 2" (Non penetrating roof mount)
-
Non Pen Coupler (For joining Aerial mast)
-
Concrete Slabs
-
Rubber Matting (Per Mtr)
Cabinets & MDF Boards (Quantity required)
-
500x400x200 (CRN54) Inc grommets & Board
-
600x600x200 (CRN66) Inc grommets & Board
-
700x500x200 (CRN75) Inc grommets & Board
-
800x800x200 (CRN88) Inc grommets & Board
-
MDF Board only (500x400)
-
MDF Board only (600x600)
-
MDF Board only (700x500)
-
MDF Board only (800x800)
VIsion (V5) I.R.S
-
V5-508 (8 Way Multiswitch)
-
V5-512 (12 Way Multiswitch)
-
V5-516 (16 Way Multiswitch)
-
V5-524 (24 Way Multiswitch)
-
V5-532 (32 Way Multiswitch)
-
V5-204 (2 Way Splitter)
-
V5-408. (4 Way Splitter)
-
V5-210. (10db Tap)
-
V5-220. (20db Tap)
-
V5-101T. (Remote powered launch Amp)
-
V5-100T. (Mains powered launch Amp)
-
V5-024 PSU. (18v Power supply unit)
-
Triax Connecting Leads (5 Pk)
Vision (V4) Shared Dish
-
V4-800G. 0db Gain
-
V4-806G. +6db Gain
-
V4-812G. +12db Gain
-
V5-204 (2 Way Splitter)
-
V5-408. (4 Way Splitter)
-
V5-210. (10db Tap)
-
V5-220. (20db Tap)
-
V4-004 (Line powered Amplifier)
-
Triax Connecting Leads (5 Pk)
SCR (Johansson)
-
Johansson 9742 SCR 8 Way Multiswitch
-
Johansson 9740 SCR 4 Way Multiswitch
-
Johansson 9933 15v PSU
-
Johansson 9935 Amplifier
Consumables
Cable
-
Brown WF100 (250m)
-
White WF100 (250m)
-
Black WF100 (250m)
-
Earth Cable (4mm) 100m
Clips & Cable Ties
-
Brown Large Cable Ties (100)
-
White Large Cable Ties (100)
-
Black Large Cable Ties (100)
-
White Small Cable Ties (100)
-
Black Small Cable Ties (100)
-
Brown Small Cable Ties (100)
-
Brown Double Clips (100)
-
White Double Clips (100)
-
Black Double Clips (100)
-
Brown Single Clips (100)
-
White Single Clips (100)
-
Black Single Clips (100)
-
Earth Clips (3,5mm) 100
Fixings
-
Catenary Wire (150m)
-
M8 Eyebolts
-
Tensioners (M8)
-
French Bolts (100)
-
Rawl Bolts (M8)
-
Sat Bolts & Plugs
-
Roofing Bolts (M6) 100
-
Earth Terms (Yellow Rings) M8 x 50
-
Earth Block
-
Black Sticky Pads (100)
-
White Sticky Pads (100)
-
Tile Banding (Pattern Band) 5m
Containment
-
Cable Tray (2" x 3m)
-
Bricks
-
UPVC Trunking 25mm x 16mm
-
UPVC Trunking 50mm x 25mm
-
UPVC Trunking 50mm x 50mm
Connectors
-
Push on "F" Type Joiners
-
"F" Conns - Crimps
-
"F" Conns - Twist on
-
"F" Conns - Siamese
-
"F" To "F" Barrels
Sealants & Tapes
-
Clear Silicone
-
Brown Silicone
-
White Silicone
-
Brick Burst Plates (Brown)
-
Brick Burst Plates (White)
-
Brick Burst Plates (Black)
-
Amalgamating Tape
-
PVC Tape
-
Barrier Tape (Red & White)
Faceplates
-
Quad Faceplate
-
Triplex Faceplate
-
Twin "F" Faceplate
-
Single "F" Faceplate
-
45mm Backbox
-
32mm Backbox
Additionals
-
No: of Pre-Wires required (if any)
-
No: of days Cherry Picker required (if any)
-
No: of days Abseilers required (if any)
Client Approval
Client Approval. (Client or Managing Agent or RMC use only)
-
I confirm that I am :- (Delete as applicable)
THE CLIENT or Representative of
MANAGING AGENT (Representative)
R.M.C (Representative)
I /We fully accept and approve the installation of the new digital TV system to be carried out as described in the survey attached.
It is understood that any changes or alterations to any part of the system design made by ABCA Systems will need to be agreed by ourselves before any work commences.
It is also understood that any changes or alterations to the installation required by us after the works have been completed may be met with additional charges and will be subject to a Re-Survey. -
Signed .
-
Print Name
-
Date
-
Signed (Digital use only)