Title Page

  • Note: I declare that the work undertaken fully complies with the requirements of the Q-Mark Fire Stopping Installation scheme and that the work undertaken complies with Regulations 4 and 7 of the Building Regulations for England and Wales or in accordance with the local regulations in force at the specific job site location.

  • This audit report remains the property of BM TRADA. It was based on a sampling approach and therefore non-conformities may exist which have not been identified within this report. If non-conformities have been raised, it is the responsibility of the certified company to provide clear documentary evidence to support the closure along with full completion of each NCR form. Failure to provide adequate evidence may result in a further revisit by an auditor to witness the action taken to resolve any issues found, this will be at the cost of the certified company. BM TRADA shall keep confidential all information relating to the audit and your organisation and shall not disclose such information to any third party except as required by law or by BM TRADA’s Accreditation Bodies.

  • Document No.

  • Client

  • Site

  • Location
  • Conducted on

  • Initial Survey Report completed by:

  • Survey Engineer signature:

  • Approved Operative/s Name/s:

  • Registered Installer Name/s:

  • On-site customer representative

  • Customer representative signature

  • Are you satisfied with your service today?

  • Accreditations 220822 1.png

Premises Checklist

  • Are RAMS in place for the work to be carried out?

  • Have these been understood by all engineers?

  • Are Floor Plans available?

  • Is the required Fire resistance known?

  • Where has this information been provided from?

  • All remedial action advised will be to a minimum of 60 minute Fire Rating unless otherwise.

  • Is a quote required?

  • Summary of parts required to rectify:

  • Batch numbers

Issue Identified

    Defect
  • LOCATION WITHIN BUILDING

  • LOCATION OF DEFECT POINT

  • DURATION REQUIRED

  • CONSTRUCTION TYPE

  • DETAIL

  • NUMBER OF EXISTING PENTRATIONS

  • SEAL GROUP:

  • TYPE OF PENETRATION/SERVICES

  • PIPE SIZE

  • PIPE MATERIAL

  • THERMAL INSULATION

  • SUPPORT CONDITION

  • DISTANCE OF 1ST SUPPORT

  • SIZE

  • BUNDLES

  • SIZE

  • BUNDLES

  • TYPE OF TRAY

  • SUPPORT CONDITIONS

  • DISTANCE OF 1ST SUPPORT

  • SIZE

  • SEAL DETAIL

  • SUPPORT CONDITIONS

  • DISTANCE OF 1ST SUPPORT

  • NOTES

  • SIZE OF PENETRATION

  • PREPARATION

  • PROXIMITY TO OTHER ELEMENTS

  • DETAILS

  • SUGGESTED TYPE OF MATERIAL REQUIRED TO MAKE REPAIR.

  • ACCESS TO RECTIFY

  • PHOTO OF DEFECT

  • Is this penetration able to be adequately sealed?

  • Details:

  • Are remedial works being completed today?

  • PHOTO: POST-REMEDIAL WORKS COMPLETED

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.