Information
-
Site conducted
Weekly Compliance Inspection
-
Audit Title (yyyy-mm-dd Compliance - High)
-
Document No.
Completed On
-
Select date
WEEKLY REQUIRED SITE COMPLIANCE VISITS
-
CHECKED FOR THE FOLLOWING ISSUES:
Doors & windows closed, waste separated & stored properly, food present, odour present, housekeeping, spills, wildlife: present/signs,
Equipment placement, ferrosilicon or flocculent.
Cement Bags: placement, spillage, storage of empty bags.
Condition around grey-water/fuel/glycol tanks, emissions. Sea-can alignment, proper storage of cylinders,
Fuel Tank: hoses, connections, liner condition, berm capacity. Cylinders stored properly,
Effluent locations in PKC, pipeline damage or leaks, coarse rejects deposition, barge condition. Fuelling Stations: nozzles stored properly, fuel levers off, spill kits present, no other waste/equipment stored in secondary containment areas
NA Prill & outdoor bag storage, bird nests or dead birds. -
D1 Lay-Down (FAR, Dewatering, Geology, Drill Crews, ADCO, Refueling Bay) Inspected
-
Comments
-
Add media
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Reasoning
-
Zone 1 (HME Refueling & N3 Lay-down) Inspected
-
Comments
-
Add media
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Reasoning
-
Crusher ROM (Refueling Bay) Inspected
-
Comments
-
Add media
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Reasoning
-
UG (Dry/Sprung/Portal/Refueling/Lay-down/Surface) Inspected
-
Comments
-
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Reasoning
-
South Tank Farm (HME & LV Refueling Bays) Inspected
-
Comments
-
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Reasoning
A21 Areas
-
Old JJM Laydown (Including 51 Sampling Shack and Surrounding Laydowns) Inspected
-
Comments
-
Add media
-
Description/Action Required
-
Add media
-
Compliance Rating
-
Description/Action Required
-
Add media
-
Compliance Rating
-
Reasoning
-
Zone 2 (HME, Muster & Laydown) Inspected
-
Comments
-
Add media
-
Description/Action Required
-
Add media
-
Compliance Rating
-
Description/Action Required
-
Add media
-
Compliance Rating
-
Reasoning
-
Zone 3 Inspected
-
Comments
-
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Reasoning
-
A21 Pit Shop Inspected
-
Comments
-
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Reasoning
-
A21 Dike Areas Inspected
-
Comments
-
Add media
-
Description/Action Required
-
Add media
-
Compliance Rating
-
Description/Action Required
-
Add media
-
Compliance Rating
-
Reasoning
SEASONAL CONSIDERATIONS
-
Season
-
Snow Dumps Inspected
-
Comments
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Reasoning
-
Winter Road Staging Area Inspected
-
Comments
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Reasoning
-
Is the dock and ramp in good working condition? Can the boat easily be launched/retrieved?
-
Comments
-
Comments
-
Photo
-
Collection Ponds Inspected
-
Comments
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Reasoning
-
Vegetation Plots Inspected
-
Comments
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Description / Action Required
-
Photo
-
Compliance Rating
-
Reasoning
Seepage Locations
-
Seepage inspections in the following locations must be completed on a weekly basis and photos must be collected.
-
Seepage Location 1 (Pipe bench along AN Road) Inspected
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Sample collected?
-
Date sampled:
-
Reason for not sampling:
-
Notify Environment Supervisor
-
Take photo on iPad and upload to P Drive 14.6 **Do not take through iAuditor!**
-
Seepage Location 2 (Intersection of Lakeshore Blvd and Winter Road Staging Area) Inspected
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Sample collected?
-
Date sampled:
-
Reason for not sampling:
-
Notify Environment Supervisor
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Seepage Location 3 (Middle of Lakeshore Blvd) Inspected
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Sample collected?
-
Date sampled:
-
Reason for not sampling:
-
Notify Environment Supervisor
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Seepage Location 4 (Lakeshore Blvd near A21 LV Entrance) Inspected
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Sample collected?
-
Date sampled:
-
Reason for not sampling:
-
Notify Environment Suspervisor
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Seepage Location 5 (A21 Zone 3 & A21 North Ramp Road) Inspected
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Sample collected?
-
Date sampled:
-
Reason for not sampling:
-
Notify Environment Supervisor
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Seepage Location 6 (Old JJM Laydown) Inspected
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Sample collected?
-
Date sampled:
-
Reason for not sampling:
-
Notify Environment Supervisor
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Seepage Location 7 (Edge of A21 Zone 2) Inspected
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
Sample collected?
-
Date sampled:
-
Reason for not sampling:
-
Notify Environment Supervisor
-
Take photo on iPad and upload to P Drive 14.6. **Do not take through iAuditor!**
-
SCRP Pond 1 Water Level Inspected
-
Is there flow to the west? Confirm from tundra
-
Photo of SCRP Pond
-
Contact Environment Supervisor Immediately and take photos.
-
Photo of SCRP Pond 1
-
Reason for no inspection:
Closure & Sign-off
-
Compliance Report Complete
-
Signature