Title Page
-
CFG-ITP-001
-
Project ______________________ ITP
-
Site Name
-
Conducted on
-
Prepared by
-
Use GPS Location input on Mobile Device
-
Personnel undertaking audit
Inspect Roof for Obstructions
Pre-Commencement of Work
-
Roof area where platform is to be installed is clear of material/debris?
-
If No response above , take photo & upload
Inspect Roof for Pre-Existing Damage
Pre-Commencement of Work
-
Any pre-existing damage to roof prior to installation?
-
If YES add photo of pre-existing damage and notify site manager
Unpack Platform & Inspect for any Freight Damage
Installation start
-
Any freight damage bring to the attention of Con-form PM?
-
If Yes add photo for PM
Check Packing List
Installation Start
-
Are there any missing parts - bring to the attention of PM?
Assemble Platform
Main Installation
-
Assembled as per documented drawings and instructions?
-
Platform assembled as per documented drawings and instructions - Yes take photo
Assemble Platform Walls
Main Installation
-
Assembled as per documented drawings and instructions?
-
Platform walls assembled as per documented drawings and instructions - Yes take photo.
Install Load and Rating Capacity Signage
Main Installation
-
Load sign installed in clear and visible area to user - main thoroughfare?
Platform & Associated Walls Complete
Main Installation
-
All assembly and installation completed within project tolerances?
Clear Work Area
Post Installation
-
Disposed of project related debris after platform installation? Site manager to inspect and sign off?
Final Inspection & Commission
Post Installation
-
Inspect and Commission Platform against scope - Con-form PM Site Manager?
-
Add signature
-
Inspect and Commission Platform against scope - Client Site Manager?
-
Add signature
-
Project photos taken and sent through to Con-form?