Title Page
-
Document No:
-
Client / Site:
-
Location:
-
Conducted on:
-
Prepared by:
-
Witnessed by:
Condensate Drainage Checks
-
Run details:
Run Detail
-
Run description and installation type (i.e 38ft Brooklands back/back island, 16ft Produce wall run, etc)
-
Number of cases
-
Photograph the run (pipework, all pumps/drain up stands, all rodding eyes, etc)
-
Are cabinet drain spigots correctly fitted?
-
Abandon the checks until all cabinet spigots are correctly sealed and located
-
Are condensate pipes running correctly with all supports correctly fitted and used?
-
Record what needs to be done to reconfigure the pipe works to make it correct and who must complete these works
-
Record how many rodding eyes have been fitted to the system for this run
-
Have condensate pumps been used?
-
Are the pumps electrically 'Live'?
-
Abandon the checks until all pumps have been connected electrically
-
Have the pump outlets been connected to the water drainage service main?
-
Abandon the checks until all pumps have been connected to the condensate water service main
-
Are pump location labels fitted?
-
Fit all pump location labels
-
Is the end of the condensate drain pipeline properly located in the drainage upstand
-
Abandon the checks until all condensate pipes are correctly located in the upstands
-
Who is responsible for capping the drainage upstand?
-
Is the drainage upstand properly capped?
-
Abandon the checks until the upstand has been correctly capped
-
Who is responsible for capping the drainage upstand?
-
LIFT THE END MOST CABINET BASE PLATE FOR EACH CABINET AND POUR A BUCKET OF WATER INTO THE DRAIN SPIGOT OF EACH CASE
-
Has the water cleared through each spigot?
-
Check/clear any blockages and retest cabinet
-
Are the any condensate leaks apparent?
-
Repair any leaks and retest the cabinet
Sign off
-
Condensate Drainage Acceptance for Run
-
Run Drainage integrity checked for the GB/Epta by:
-
Run Drainage integrity accepted for the client by: