Title Page

  • Site conducted

  • Customer/Site Name

  • Contact Name

  • Contact Phone #

  • Install Date and Time

  • Technicians

  • Address/Location

  • Room #

  • ASI Project #

Technician - Overall System Checklist

  • Is system installed per engineered drawings?

  • Is all cabling labeled with self laminating Brady labels?

  • Wall plates, Pop ups, floor boxes, and lecterns all working as designed?

  • Has all CAT cabling been tested and passed?

  • Have the floors been vacuumed and tables all been wiped down/cleaned?

  • Has all garbage and cardboard been taken care of?

  • Have all manuals, remotes and user cables been handed over to the customer?

Technician - Audio System Performance

  • Do all sources route correctly to destinations?

  • Are all speakers functioning?

  • Have you confirmed all speakers are tapped per system drawings?

  • Are all speakers installed to correctly disperse audio in all areas of the room?

Technician - Video System Performance

  • Are all sources functional and route properly to all the displays and destinations?

  • Verify all sources provide optimum brightness, contrast, and color to the displays, with a clear quality picture

  • Verify operational functions of all input plates and cables at tables

  • Verify that there is no “Double Scaling”, make sure that any scalers connected to display devices are scaling to the native resolution of the connected display

Information

  • Any Outstanding Issues/Actions to be Performed?

  • Comments or Notes?

Product Info

    Model and Serial Numbers
  • Do you want to log product information?

Jobsite Photos

  • Photo(s) of Displays

  • Photo(s) of Rack Front

  • Photo(s) of Rack Rear

  • Photo(s) of Overall Room(s)

Signatures

  • Lead Technician Signature

  • The work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof designated above is hereby established as the Issued Date listed above which also is the date of commencement of applicable warranties and service agreements as required by the Contract Document. The Customer agrees and acknowledges that by signing off on the project listed above it requires said customer to issue final payment pursuant to this Agreement.

  • Contact Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.