Title Page

  • Document No.

  • Building

  • Audit Title

  • Conducted on

  • Prepared by

  • Note 1) This audit is in accordance to CPM schedule update titled "April 2017 Schedule Update: Data Date: 3-31-17" in which RK Mechanical received on April 10, 2017.

  • Note 2) Prior to this audit being performed it was determined that the Plumbing Rough-in (minus the bath/shower fixtures) for floors 3-6 of the High-Rise have been completed, and no shower/bath fixtures have been installed yet.

  • Audited Area
  • CPM Activity ID

  • Scheduled Work Week

Kitchen Fixture Trim

  • Are the cabinets/vanities installed?

  • Are the countertops installed?

  • Are the faucets installed?

  • Are the sinks installed?

Bathroom Fixture Trim

  • Is the tile installed on the floors?

  • Are the cabinets/vanities installed?

  • Are the countertops installed?

  • Are the faucets installed?

  • Are the sinks installed?

  • Are the Water closets installed?

Shower/Bath Fixtures and Thermostats

  • Are the entry doors, with locks, installed in the units to prevent theft?

  • Is the tile installed on the shower walls?

  • Are all of the Shower/Bath Fixtures installed?

  • Are the thermostats installed?

Walls

  • Is the Drywall complete?

  • Is the final paint complete?

  • Are all of the GRDs installed?

  • Are the thermostat backs installed?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.