Title Page
-
Document No.
-
Building
-
Audit Title
-
Conducted on
-
Prepared by
-
Note 1) This audit is in accordance to CPM schedule update titled "April 2017 Schedule Update: Data Date: 3-31-17" in which RK Mechanical received on April 10, 2017.
-
Note 2) Prior to this audit being performed it was determined that the Plumbing Rough-in (minus the bath/shower fixtures) for floors 3-6 of the High-Rise have been completed, and no shower/bath fixtures have been installed yet.
Audited Area
-
CPM Activity ID
-
Scheduled Work Week
Kitchen Fixture Trim
-
Are the cabinets/vanities installed?
-
Are the countertops installed?
-
Are the faucets installed?
-
Are the sinks installed?
Bathroom Fixture Trim
-
Is the tile installed on the floors?
-
Are the cabinets/vanities installed?
-
Are the countertops installed?
-
Are the faucets installed?
-
Are the sinks installed?
-
Are the Water closets installed?
Shower/Bath Fixtures and Thermostats
-
Are the entry doors, with locks, installed in the units to prevent theft?
-
Is the tile installed on the shower walls?
-
Are all of the Shower/Bath Fixtures installed?
-
Are the thermostats installed?
Walls
-
Is the Drywall complete?
-
Is the final paint complete?
-
Are all of the GRDs installed?
-
Are the thermostat backs installed?