Title Page

  • Project Name

  • Project Number

  • Date

  • CPP Person Conducting Inspection

  • Additional Inspection Attendee

  • Brief Description of Works Being Completed During Inspection

  • Location
  • Instructions:
    1. Identify non-conformance during your site inspection by answering the questions below.
    2. Add photos,inspection findings, or description by clicking on the paperclip icon
    3. To add a Corrective Action and Recommendation click on the paperclip icon then "Add Action," provide a description, assign to a member, set priority, and due date
    4. Complete audit by providing digital signature
    5. Share your report by exporting as PDF, Word, Excel or Web Link

    This form shall be utilized for inspections of the site WHS, Environmental, and Quality Assurance status of the work site. This inspection will be conducted by the Site Manager or delegate and Representatives from Sub-Contractor work groups where applicable.
    Condition Codes:
    C = Conforming,
    PC = Partial Conformance,
    NC = Non-Conforming,
    NA = Not Applicable

Housekeeping

  • Bins emptied regularly

  • Site Offices clean & tidy

  • Kitchen / Tea room area clean & tidy

  • Notice boards in place & used

  • Adequate drinking water

  • Toilets clean & tidy, hand wash / toilet paper available

  • Storage of materials

  • Refuse / Scrap removed

  • Correct stacking of materials

  • Barricading erected / maintained

  • Tools and equipment correctly stored

  • Signs, flagging & bunting erected / maintained

  • Sharp objects capped i.e. star pickets / rio bar

  • Work benches clean & tidy ☐

  • Faulty tools and equipment placed in quarantine

General

  • Adequate/ suitable PPE for task

  • Emergency siren tested and working correctly

  • WHS registers reviewed & amended i.e. SWMS / Permits

  • Fire extinguishers tagged and in date / register up to date

  • First aid kits stocked and in prominent position

  • SDS’s reviewed / registers up to date

Tools and Equipment

  • Tools and equipment correctly stored

  • Electrical equipment tested and tagged / register up to date

  • Lifting equipment tested and tagged / register up to date

  • Ladders in good condition / register up to date

  • Operational and in good condition

  • Faulty tools and equipment placed in quarantine

Environment

  • Any mechanical plant parked in drip-lines of trees

  • Are plant and machinery leaks evident?

  • Are they being suitably dealt with

  • Are sediment and erosion control measures being maintained?

  • Are water drainage measures being maintained

  • Is the concrete washout suitable and working effectively

  • Are dust and air quality control measures being maintained

  • Are solid/liquid wastes being managed appropriately

  • Any new areas of cultural significance discovered

  • Are chemicals suitably bunded, stored and labelled

  • Is the site chemical spill kit accessible and stocked

Mobile Plant

  • Operator competencies verified

  • Kept Clean, including EWP

  • Daily pre start inspection checklist completed by operator

  • Safety devices operational - seat belts / fire extinguishers / reverse beeper / machine guards.

  • Mobile plant inspections complete for all plant on site

Permit to Work / SWMS

  • Permits in place as required

  • Permit conditions adhered to

  • Permit understood by relevant persons

  • Permit within expiry date

  • Permit available at location of works

  • SWMS completed for High Risk Tasks

  • Approved SWMS in place

  • SWMS reflect the task in progress

  • Personal signed onto correct SWMS

Quality

  • Are IFC drawings identified and controlled as required

  • Are IFC drawings current / drawing register up to date

  • Are transmittals received and scanned

  • Are CPP's QA documents including ITC/ITP'S completed, checked, signed off, filed appropriately

  • Are Sub-Contractors QA documents including ITC/ITP'S completed, checked, signed off, filed appropriately

  • Have defective or non-conforming plant, equipment or materials been isolated and labelled 'out of service' or 'quarantine'?

Completion

  • General Comments/Findings

  • Co Representative: (Full Name and Signature)

  • CPP Person Conducting Inspection: (Full Name and Signature)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.