Information
-
Safety Audit Conducted by
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Working at Heights
-
1.1. Fall risks of 6 feet or more? (including voids, pits, and trenches)
-
1.2. Is there leading edge protection?
-
1.3. Are Employees using Personal Fall Arrest Systems?
-
1.4. Are Employees trained and qualified to use PFA system?
-
1.5. Did Employee inspect all components of PFA system?
-
1.6. complete and adequate guardrail system installed?
-
1.7. Do w have future work at heights on this project?
2. Aerial/Platform Lifts
-
2.1.Lift being used safely?
-
2.2. Is the lift appropriate for the task?
-
2.3. Are the operator(s) licensed by the manufacture and for this specific model?
-
2.4. Can the lift be used Safely in this area?
-
2.5. Did the operator inspect the lift today?
3. Scaffolds
-
3.1.Is scaffold complete with compatible scaffold parts?
-
3.2. Scaffold pass daily inspection by competent person?
-
3.3 Are employees trained for the scaffold?
4. Lifting Equipment
-
4.2. Loads lifted over persons, close proximity to obstacles incl. overhead power lines?
-
4.3. Lack of maintenance, testing and inspection?
-
4.4. Lack of SWL information displayed?
-
4.5. Lack of daily inspection protocol?
-
4.6. Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks?
-
4.7. Lifting equipment unlabelled, does not meet AS, no SWL displayed?
-
4.8. Unlicensed operators?
-
4.9. Lack of LOTO procedures for cleaning, servicing and maintenance?
-
4.10. SWL of plant or any lifting equipment exceeded?
5. Harness and Equipment
-
5.1. Unsafe or damaged harness or equipment?
-
5.2. Incompatible hooks/equipment?
-
5.4. Unsafe or uncertified anchor points?
-
5.5. Lack of inspection protocol for equipment?
-
5.6. Lack of or inadequate formal training for operators?
6. Ladders
-
6.1. Unsafe or damaged ladders?
-
6.2. Unsafe positioning of ladders?
-
6.3. Ladder not properly secured?
-
6.4. Ladder unsuitable for job?
-
6.5 Unsafe ladder use?
7. Hazardous Manual Tasks
-
7.1. Lack of identification hazardous manual tasks?
-
7.2. Lack of assessment of hazardous manual tasks?
-
7.3. Inadequate risk controls? (examples: no job rotation, lighter loads, trolleys, lifting equipment, etc)
-
7.4. Lack of training in risk controls and safe lifting/ team lifting techniques?
8. Hazardous Chemical (including fuel and oil)
-
8.1. Unsafe storage location? (e.g. flammables near ignition sources, spills could enter stormwater drains, etc)
-
8.2. Incompatible chemicals stored near each other?
-
8.3. Inadequate spill containment equipment?
-
8.4. Safety Data Sheets not accessible on site?
-
8.5. Lack of emergency procedures for injury/spills/fire etc?
-
8.6. Excessive quantities stored on site or in vehicles?
-
8.7. Insufficient ventilation?
-
8.8. Insufficient, or incorrect, PPE?
-
8.9. Unsuitable storage containers? (unlabeled or stored in food containers)
9. Emergency Response
-
9.1. Lack of, or no emergency plans for site?
-
9.2. Emergency procedures not displayed at site?
-
9.3. Lack of training and rehearsal of emergency plans?
-
9.4. Lack of, or inadequate first aid kits aid equipment for site?
-
9.5. Insufficient access to formally trained First Aiders for all shifts?
-
9.6. Unsuitable or inadequate communication equipment?
10. Traffic Management
-
10.1. Lack of, or inadequate, Traffic Management Plan (TMP) in place?
-
10.2. Lack of training in TMP for all persons on site? <br>(contractors and visitors)
-
10.3. Inadequate controls for TMP? (physical barriers, bollards, speed limits, flashing lights, spotters, etc)
11. Personal Protective Equipment (PPE)
-
11.1. Lack of, or inadequate PPE use
-
11.2. Lack of system to issue, inspect, replace and monitor PPE?
-
11.3. Lack of training in safe use and limitations of PPE?
12. Work Environment
-
12.1. Lack of/or inadequate amenities? (toilets, wash areas, lunch rooms, etc)
-
12.2. Inadequate housekeeping?
-
12.3. Lack of, or inadequate noise control?
-
12.4. Potentially hazardous air quality/ poor ventilation.
13. Electrical Hazards
-
13.1.Lack of GFCI testing/report log?
-
13.2. Inadequate installation/maintenance of power branch circuits
-
13.3. Insufficient lighting?
-
13.4. Insufficient Available power?
-
13.5.Lack cord management?
-
13.6. Lack of extension cord management/inspection?
-
13.7.Lack of lockout Tag-out protocol?
-
13.8. Does any unsafe condition near electrical services or energized parts?
-
13.9. Any future shutdowns and/or exposures to shock or arc hazards?
14. Administrative Procedures
-
14.1. Failure to obtain permits (Energized Works, Confined Space, ladder use, etc)
-
14.2.Lack or, or inadequate, supervisory arrangements?
-
14.3. Lack of/or inadequate training, licenses, skills, experience?
-
14.4. Lack of/or inadequate accident/incident notification procedures?
14. Administrative Procedures
-
14.1. Failure to obtain permits (Energized Works, Confined Space, ladder use, etc)
-
14.2.Lack or, or inadequate, supervisory arrangements?
-
14.3. Lack of/or inadequate training, licenses, skills, experience?
-
14.4. Lack of/or inadequate accident/incident notification procedures?
-
14.5.Lack of/or inadequate Site Specific Safety Plan?
15. Site Conditions
-
15.1. lack of safe entry/egress to work area?
-
15.2. Lack of or Improper installation of handrails?
-
15.3. Penetrations in floor or roof adequately covered, secured, and identified?
-
15.4.Lack of housekeeping?
-
15.5.Exposed rebar or other implement hazard exist?
16. Trenching or Excavation
-
16.1. Have underground utilities been identified by digsafe?
-
16.2. Lack of trench daily inspection by qualified person.
-
16.3. Is the excavation depth greater than 5 feet? If so, do we have the required trench properly installed?
-
16.4. Does trench have proper egress?
17. Other unsafe condition
-
17.1. Is there an unsafe act or condition not previously covered in this audit?
Corrective Actions
-
Enter any corrective actions that will be undertaken
Sign Off
-
On site representative
-
Auditor's signature