Information

  • Document No.

  • Job No.

  • Site

  • Conducted on

  • Prepared by

  • Location
  • Subcontractor

1.0 SITE SIGNAGE AND MANAGEMENT PLAN

  • 1.1 Is the Safety Management Plan in Temp PowerBox?

  • 1.2 Is site signage displayed and visible?

2.0 SUBCONTRACTOR CHECKS

  • 2.1 Are subcontractors aware of relevant site safety information?

  • 2.2 Confirm subcontractors completed safety briefs to their workers?

  • 2.3 Confirm all subcontractors and workers have a WHITE/BLUE CARD?

3.0 PUBLIC PROTECTION & CONTROLS

  • 3.1 Subcontractor has secured/removed any hazards associated with their work prior to leaving site.

  • 3.2 Is on-site fencing required?

  • 3.3 Is Traffic Management required?

4.0 TOILET & AMENITIES

  • 4.1 Are site toilet amenities in a clean condition?

  • 4.2 Are the amenities in good working order?

  • 4.3 Is there adequate supply of clean fresh drinking/portable water?<br>

  • 4.4 is there a rubbish enclosure/bin on site?<br>

  • 4.5 The bin is located away from the vicinity of the house or areas where vehicles, plant and equipment are parked or stored?

5.0 ACCESS EGRESS

  • 5.1 Is a safe/clear access provided to all workplaces?

6.0 SCAFFOLDING

  • 6.1 Are the solid foundations under scaffold safe?

  • 6.2 Is there adequate bracing to scaffold?

  • 6.3 Are all work areas fully planked?

  • 6.4 Are handrails, kick boards, brick guards in use on scaffold over 2mtrs?<br>

  • 6.5 Is there safe access to the work platforms?<br>

  • 6.6 Is scaffolding in good condition?

7.0 ELECTRICAL SAFETY

  • 7.1 Is the Temp power supply box waterproof and in good condition?

  • 7.2 Is the RCD tripping when tested?<br>

  • 7.3 Is earth leakage protection test sticker in date?

  • 7.4 Are all electrical tools and leads in date for test tag?

  • 7.5 Are all power tools fitted with safety guards?

8.0 CONFINED SPACE (ROOF)

  • 8.1 Is access safe and adequate?

  • 8.2 Is lighting adequate?

  • 8.3 Is ventilation adequate?

9.0 MANUAL HANDLING & DELIVERIES

  • 9.1 Are subcontractors using safe manual handling techniques?

  • 9.2 Is mechanical Equipment available for lifting heavy loads?

  • 9.3 Is the material/equipment delivered, located in a safe location (not on footpath/verge/roadway)?

10.0 PERSONNEL PROTECTIVE EQUIPMENT (PPE)

  • 10.1 Are all personnel wearing safety footwear with good tread?

  • 10.2 Are appropriate respiratory protection being used for hazardous substances?

  • 10.3 Are long sleeve shirts/broad brims hats/SPF15+being used when exposed to sun?

  • 10.4 Are appropriate gloves used where Required?

  • 10.5 Are hand creams being used to protect against corrosive substances?

  • 10.6 Are personnel using appropriate hearing protection when exposed to loud noise?<br>

  • 10.7 Is noisy machinery moved as far as possible away from workers?

  • 10.8 Are personnel wearing Australian Standard Safety glasses?<br>

  • 10.9 Are appropriate safety glasses/shields/goggles being used in hazardous situations

11.0 STORAGE

  • 11.1 Are hazardous substances/materials stored correctly?

  • 11.2 Are containers labelled correctly?

GENERAL

  • Is the Occupational Safety & Health Act 1984 being followed?

  • Are the Occupational Safety & Health Regulations 1996 being followed?

CORRECTIVE ACTIONS

  • Enter any corrective actions that will be undertaken

SIGN OFF

  • On Site Representative

  • Supervisor Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.