Information

  • Site conducted

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Previous Audit Report

  • Has the previous audit report been closed out?

  • Have all previous issues been cleared?

Management Controls

  • Check that a signed copy of Form 10 has been sent to the local HSE office and that a copy is displayed on site.

  • Check employers and public liability insurance certificates are valid and on display.

  • Have appropriate signs/notices been erected around the site i.e. mandatory use of PPE, Incomplete Scaffolds, No Smoking, Traffic Management, Fire assembly, Fist Aid Points etc.

  • Accident Book is provided on site and is available to all personnel

  • Ensure adequate supervision is provided for all activities on the site

  • Ensure that all persons are familiar with the requirements of the site safety rules and are inducted.

  • Ensure site safety rules are displayed in a prominent position e.g. reception, canteen, site office etc.

  • Ensure all subcontractors have been assessed and are adequately resourced and competent for the work they are undertaking.

Access and Egress

  • Is there safe access and egress to all working areas of the site?

  • Have pedestrian walkways been provided to protect them from moving vehicles?

  • Are walkways free from obstructions and stored materials?

  • Are access routes adequatelly lit?

  • Stairs & Ladders compliant?

Access - External

  • Ensure site access points are clearly signposted on the approaches to the site.

  • Ensure all signage is in accordance with Chapter 8 of the New Roads & Street works Manual.

  • Ensure adequate on-site signage is provided to warn and advise both vehicle drivers and pedestrians.

  • Ensure that adequate lighting is provided, including flashing amber warning beacons where appropriate.

  • Ensure any lighting does not cause a nuisance to local residents.

  • Ensure approach roads are kept clean and tidy and that any debris is removed promptly.

  • Ensure there are suitable barriers and warning notices to keep members of the public separated from the site works and site traffic.

  • Where work at height is carried out adjacent to the public highway/footpath ensure that protective fans or other measures are provided to safeguard members of the public.

  • Ensure the site is securely fenced at all times to prevent unauthorised access.

  • Ensure all public access routes are kept clean and clear at all times.

  • Ensure adequate signage is provided to direct members of the public.

Asbestos Management

  • Has an asbestos survey been carried out in accordance with HSG264?

  • Has a detailed risk assessment and method statement been carried out?

  • Are waste consignment notes in place?

  • Is the work being carried out in a controlled and safe manner?

  • Has the asbestos been disposed off in accordance with the special waste regulations ?

Control of Substances Hazardous to Health (COSHH)

  • Have COSSH Assessments been carried out for all potentially hazardous materials and substances being used on the site.

  • Are material safety data sheets available to assist with COSHH assessments.

  • Have the hazards associated with the use of such materials been properly communicated to those affected.

  • Ensure all dangerous/hazardous materials/Substances are clearly marked/identified and stored in a secure location appropriate to the substance.

  • Have the appropriate control systems and PPE been provided and is the PPE being used.

Demolition Operations

  • Has a competent person been appointed to oversee the demolition operations?

  • Has the structural stability been checked and are temporary supports in place where required?

  • Have all services been disconnected?

  • Is the area barried off and suitably signs in place.?

  • Is there adequate dust suppression where required?

  • Is there sutable noise controls in place?

  • Is there suitable lighting?

  • Is material being removed from site on a regular basis and not allowed to accumulate?

Electrical Equipment

  • Check that all necessary utility services are provided on site before work begins.

  • Ensure that existing services e.g.: electricity cables, gas mains etc have been identified and effective steps have been taken to prevent danger from them.

  • Check that low voltage tools and equipment are being used wherever possible.

  • Check that only 110v CTE hand tool etc are in use.

  • Check that cables and leads are protected from damage.

  • Check all connections are properly made and suitable plugs are used.

  • Check that tools and equipment are visually checked and regularly inspected/tested by a competent person. (PAT)

  • Ensure that cables and trailing leads are not trip hazards.

  • Ensure that suitable and sufficient task lighting is provided to enable operatives to safely carry out their work.

Excavations/Earthworks

  • Ensure that checks are made to determine the presence of any buried services before and during all excavation works.

  • All excavations should be carried out in accordance with a detailed method statement s and permit to dig. Is there a permit to dig?

  • Check that there is adequate support and propping for the excavation, or whether it has been sloped or battered back to a safe angle.

  • Check that there is a safe method used for placing supports, without the need for operatives to work in an unsupported trench.

  • Check that there is safe access into the excavation (i.e.: a sufficiently long and secured ladder).

  • Check that barriers or other protection to stop people/vehicles falling in are in place.

  • Does the excavation affect the stability of neighbouring structures or services.

  • Ensure that materials, spoil and plant is stored away from the edge of the excavation to reduce the chance of collapse.

Fire Risks and Management

  • Is there a fire risk assessment in place?

  • Ensure all staff know what these procedures are and that they form part of the site induction.

  • Check that the emergency services have been informed of the location of the works, the key hazards and the emergency procedures.

  • Ensure that the quantity of flammable materials, liquids and gases are kept to a minimum and are adequately stored.

  • Check that flammable and combustible waste is removed regularly and stored in suitable bins and skips.

  • Check that suitable fire extinguishers are provided and that they are maintained and in a good condition.

  • Check that all fire extinguishers have had an annual inspection.

First Aid

  • An appropriate number of trained and qualified first aiders should be available on the site.

  • Are Additional suitably qualified persons available to ensure adequate first aid provision is provided.

  • Are the names of all first aiders detailed on the site notice board?

  • Ensure the first aid kit contains only first aid materials.

  • The location of the first aid box should be indicated on the site notice board and the door of the room in which it is contained. Are they clearly indicated?

  • Are new staff made aware of its location as part of their induction?

Housekeeping

  • Ensure all debris and waste is removed from the work area upon completion of the work or at the end of each shift.

  • Ensure Debris is not be allowed to collect around the site.

  • Ensure materials are stored in an appropriate manner so as not to cause damage to or a weakening of the material.

Health & Safety Management Plan

  • Ensure the project management plan is up to date and signed by all relevant parties.

  • Is an emergency plan defined and in place complete with emergency contact numbers?

  • Is the plan meaningful and communicated to all parties, including sub contractors?

Induction

  • Ensure all staff receive a site specific safety induction before starting work.

  • Are site safety inductions being adequately carried out both for staff and visitors?

Lifting Operations/Equipment

  • Ensure that all lifting equipment has been tested and installed by a competent person and is regularly maintained and inspected.

  • Check that the rated capacity/safe working load is clearly marked.

  • Ensure that the lifting equipment is capable of lifting the heaviest component within the anticipated working radius - allow for sufficient spare capacity.

  • Ensure that cranes and other lifting equipment has sufficient space to operate safely.

  • All lifting equipment should have a thorough examination every 6 months.

Low Level Access Including Steps and Podiums

  • Are podiums free from defects?

  • Are steps class use as a last resort

Manual Handling

  • Ensure that a manual handling risk assessment has been completed wherever regular lifting of heavy loads is required.

  • Check the suitability of using wheelbarrows, hoists, telehandlers and other plant or machinery so that manual handling of heavy objects is kept to a minimum.

Mobile Scaffold Towers

  • Check that proprietary tower scaffolds have been erected and are being used in accordance with the suppliers instructions.

  • Check that the wheels of any tower scaffold have been locked when in use and check that the platform is empty when being moved.

Occupational Health, HAV'S, Noise and Associated Health Risks

  • Check that workers have had information and training so that they know what the risks are from HAV.

  • Check that exposure to HAV has been reduced as much as possible by selecting suitable work methods and Plant.

  • Check whether the noise can be reduced by using different working methods or selecting quieter plant e.g.: by fitting breakers and other plant or machinery with silencers.

  • Ensure that people not involved in the work are kept away from the source of the noise.

Personal Protective Equipment (PPE)

  • PPE General Requirements - Ensure PPE compatibility issues have been considered and that one piece of PPE not restrict the effectiveness of another piece of PPE.

  • Ensure that PPE is issued on an individual basis.

  • Ensure that it is suitable for the type of work being undertaken.

  • Check that it is kept in good condition.

  • Ensure that it is appropriately replaced.

  • Ensure that footwear is fitted with steel toecaps and steel sole plates.

  • Ensure gloves are correct for their application and the activity being undertaken.

  • Check that hands are washed frequently after spells of work.

  • Ensure that hearing protection is used as instructed.

  • Ensure that the correct type of respiratory equipment is used for the works being undertaken.

  • Ensure that all equipment is cleaned and checked after use.

  • Ensure all staff and visitors are wearing safety helmets.

Plant & Equipment

  • Ensure that tools and equipments are stored correctly to avoid damage to the equipment and persons.

  • Ensure that the right tools and equipment are being used for the right job.

  • Were all hand tools found to be in good condition with no defects?

  • Power Tools

  • Check that all dangerous parts are guarded e.g. gears, chain, drives, projecting engine shafts etc.

  • Check that tools are 110 volt and that a residual current device (RCD) is used for additional protection.

  • Check the supply cable for cuts, splits or other damage. All all cables free from damage?

Risk Assessments and Method Statements

  • Are method statements adequate and suitable for the task?

  • Does the method statement offer the necessary controls and required level of protection?

  • Ensure all contractors are working in accordance with the method statement.

Scaffolding/Working platforms

  • Check that any scaffold erection, alteration or dismantling is carried out by a competent person.

  • Check that all standards are provided with base plates and timber sole boards which span at least two base plates.

  • Check that all standards, ledgers, braces and struts are in position.

  • Ensure that the scaffold is adequately tied to the building or structure to prevent collapse.

  • Check that double guard rails and toe boards or other suitable protection at every edge.

  • Check that there are additional brick guards provided to prevent materials falling from scaffold where they are used as a working platform.

  • Check that working platforms are fully boarded and that the boards are arranged to avoid tipping or tripping - i.e.: no overlapping boards.

  • Check that the scaffold is strong enough to carry the weight of materials stored on it and that they are evenly distributed.

  • Ensure that the scaffold has been properly maintained.

  • Ensure that a competent person inspects the scaffold regularly, at least once a week; and always after it has been altered, damaged and following extreme weather.

  • Are scaffold tags being utilised?

  • Ensure that these inspections are adequately recorded.

  • Are all scaffolds and working platforms sutable?

Security

  • Are the public fenced off or otherwise protected from the work?

  • Is out of hours security is place?

  • Is the perimeter fence secure and un-damaged?

  • Are all gated secured?

Welfare Facilities

  • Ensure a facility is provided to change, dry and store clothing.

  • Mess facilities should include a place where workers can sit, make hot drinks and prepare food.

  • Mess facilities shall be of sufficient size for the number of employees on site and are provided with heating.

  • Ensure sufficient toilets are readily available, maintained, kept clean & are properly lit.

Working at Height

  • Check whether the work can be undertaken without working at height.

  • Check that access equipment is erected by competent persons and checked before use.

  • Ensure safe access and egress have been provided to areas.

  • Roof Work

  • Ensure that edge protection is provided to stop people or materials falling.

  • Check that during industrial roofing, nets are provided to stop people falling from the leading edge of the roof.

  • Ensure that people are kept away from areas below the roof work.

Other

  • undefined

Summary

  • undefined

Audit Risk Level

  • Risk rating for this Audit.

Corrective Actions

  • undefined

Sign off

  • I confirm I have had the contents of this audit report explained to me.

  • Project Manager

  • Person conducting this Audit.

  • Audit concluded at:

Closure

  • All actions on this report have been completed on:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.