Site Inspection Checklist
-
This checklist is intended as a guide only and may be modified to suit specific Projects
-
Project Title:
-
Project Location:
-
Name of Contractor:
-
Person/s completing inspection:
-
Date:
-
File No:
-
Indicate in the following manner:
1.DOCUMENTS ON SITE (hardcopy or electronic, latest version)
-
1.1 Inspection & Test Plan (ITP)
-
1.2 Design plans (record the revision number)
-
1.3 Review of Environmental Factors (REF) or Development Control Plan (DA)
-
1.4 NSW Fisheries Permit - Outlining Conditions of approval
-
1.5 Traffic Guidance Scheme (TGS)
-
1.6 Safe Work Method Statements (SWMS)
2. PUBLIC PROTECTION
-
2.1 Appropriate pedestrian barricades, fencing, secure and in place?
-
2.2 Suitable pedestrian directional signage displayed?
-
2.3 Footpaths clean and free from debris?
-
2.4 Site access is controlled? Vehicles enter & leave in a forward direction or use a spotter
-
2.5 Construction vehicles are parked in the allocated areas?
3. WORK HEALTH SAFETY (WHS) SYSTEMS
-
3.1 WHS Policy displayed?
-
3.2 Current WHS Management Plan available?
-
3.3 Hazard register- Accident/Incident Reports available? (Monthly WHS Report provided)
-
3.4 Sign in register is available and up to date?
-
3.5 induction Records available including Industry White/Green card details?
-
3.6 Suitable PPE signs displayed? Hard Hat, Fluro / life Vests, Boots, Eyes, gloves, Hearing
-
3.7 Safe Work Procedures available and have been reviewed by the Head Contractor?
-
3.8 Protective clothing worn by all Contractors/Subcontractors on site?
-
3.9 Regular consultation and communication takes place? i.e. Weekly Toolbox Talks
-
3.10 Public Liability and Workers Compensation Insurances are current?
-
3.11 Regular WHS Site Inspections are conducted, recorded and actions closed out?
4. HOUSEKEEPING
-
4.1 Work areas including access/egress points are free from rubbish and/or obstructions?
-
4.2 Stock and general materials stored securely and away from other works?
-
4.3 Washrooms and toilets (male & female) are clean and tidy?
-
4.4 Meal rooms are clean & tidy? Amenity shed is not used to store materials or chemicals
-
4.5 Potable water is available on site?
-
4.6 Furniture and appliances are in good working order?
-
4.7 Rubbish bins available – covered?
5. EMERGENCIES
-
5.1 A detailed Emergency Evacuation Plan including a list of contact numbers is displayed?
-
5.2 Procedures are in place for Medical Emergencies, Fires, unexpected finds/services, rescue from height, hazardous chemicals and natural disasters?
-
5.3 Emergency Exits and Evacuation Assembly Point/s clearly visible?
-
5.4 Emergency Alarms tested?
-
5.5 Emergency lighting system in place?
-
5.6 Emergency eyewash / shower available and maintained?
6. HOT WORKS & FIRE CONTROL
-
6.1 Smoking is restricted to dedicated areas away from buildings, other works or vehicles
-
6.2 Appropriate Fire extinguishers are on site, signposted and accessible?
-
6.3 Inspection tags on fire extinguishers are current?
-
6.4 A suitable water source is available for wood, cloth, paper, plastics or rubber fires?
-
6.5 Personnel trained in use of fire fighting equipment?
-
6.6 Welding shields are being used?
-
6.7 Combustible materials are removed or protected from the site of hot works?
-
6.8 A spotter is being used to isolate or monitor the area of hot works?
-
6.9 Oxy bottles and torches are fitted with flashback arrestors
-
6.10 Hot work permits are used and being followed?
7. FIRST AID
-
7.1 First Aid Kit/s suitably stocked?
-
7.2 List of staff qualified in First Aid prominently displayed? (1 per 25 workers)
-
7.3 First Aid locations and phone numbers prominently displayed?
-
7.4 Records of First Aid treatment and supplies dispensed maintained?
-
7.5 Return to Work/Suitable Duties are provided for injured workers with a Doctors Certificate
8. ELECTRICAL
-
8.1 Electrical leads tagged and in good condition?
-
8.2 Power supplies are RCD protected?
-
8.3 Energy sources are isolated, tested and tagged out?
-
8.4 Electrical leads off the ground? (Maximum lead length of 20m)
-
8.5 Switchboards can be locked/ secured when the site is unattended?
-
8.6 Task and security Lighting is adequate and free from glare?
-
8.7 No flickering or inoperable lights?
-
8.8 Sufficient GPO’s/power boards are provided and restricted to each floor?
9. CONFINED SPACES
-
9.1 Confined Space/s identified on worksite?
-
9.2 Risk assessments undertaken and documented?
-
9.3 Communication and Rescue Plan available?
-
9.4 Safety equipment in good working condition?
-
9.5 Air monitoring equipment is being used with results recorded?
-
9.6 Suitable training provided to employees?
-
9.7 Confined Space Permit used and available?
10. MOBILE PLANT AND EQUIPMENT
-
10.1 Daily Plant Safety Inspection Checklists used?
-
10.2 Operators are trained and licensed?
-
10.3 Plant & Equipment Maintenance records, including lifting equipment provided?
-
10.4 SWMS provided and being followed?
-
10.5 Overhead services and structures are identified, isolated or protected?
-
10.6 Guarding and Emergency stop buttons in place?
-
10.7 Plant register is available and up to date?
-
10.8 Work activities are separated with an exclusion zone around people and mobile plant?
-
10.9 Motor vehicles traveling on sites with operating plant have an amber flashing light?
-
10.10 Spotters are used in close proximity to services, or to control pedestrians around plant?
11. EXCAVATIONS
-
11.1 Excavations are shored, battered or benched with spoil stockpiled away from the edge?
-
11.2 DBYD Plans are on site & underground services have been identified/located on site?
-
11.3 Excavations are signposted and secure with protective fencing and/or barricades?
-
11.4 Clear & safe access around excavation/s? Avoid tracking plant adjacent to excavations
-
11.5 Separate access & egress points from excavation/s? Provide access points every 20m
-
11.6 Safe Work Procedures/Permits (dig or working near services) in place?
12. PREVENTION OF FALLS (Does not include Telecommunication Towers)
-
12.1 All work platforms have secure handrails, guarding or fence panels?
-
12.2 Harness and lanyard or belts provided with suitable anchor points?
-
12.3 Scaffolds are complete & clear of debris or materials. Platforms over 4m to be tagged
-
12.4 Do not work above/below others – Areas isolated and signposted?
-
12.5 Manufactures treads and steps are used to access plant & Equipment?
-
12.6 Safe Work Procedure/Permits (Working at Height) in place?
13. STAIRS, LANDINGS & LADDERS
-
13.1 Handrails and steps in good condition?
-
13.2 Stairs and landings clear of obstructions?
-
13.3 Non-slip treatment on steps?
-
13.4 Kick plates in place where required?
-
13.5 Platforms Ladders are being used? Material & equipment is secured on the platform?
-
13.6 Ladders are placed on level ground at a ratio of 1:4, extending 1.0m above top landing?
-
13.7 Straight or extension ladders securely fixed at top and bottom?
-
13.8 Work in pairs or use a lanyard to enable 3 points of contact to be maintained?
14. ENVIRONMENT
-
14.1 Are environmental safeguard measures / controls as identified in REF or DA being implemented and maintained ?
-
14.2 Have all conditions of permits and other approvals being adhered to (Shoalhaven Council, Shoalhaven Water, National Parks, Fisheries, EPA, Planning Department) ?
-
14.3 Dust is suppressed / watered down? Is Shade cloth fitted to temporary fencing
-
14.4 Sediment fencing is provided & maintained around stockpiles, drains & watercourses?
-
14.5 Stormwater drains / water courses are protected i.e. filter socks & retarding basins etc?
-
14.6 Vegetation/trees are protected and retained?
-
14.7 Clearing of vegetation is limited to the area being worked?
-
14.8 Waste is separated and recycled or reused?
-
14.9 Spill kits are available and maintained?
-
14.10 Wash out facilities are available for concrete, paint etc
-
14.11 No fires or burning off is being undertaken?
15. HAZARDOUS SUBSTANCES / CHEMICALS
-
15.1 Hazardous / flammable materials stored safely? Ventilated, bunded & separated
-
15.2 Hazardous Substances Register available. i.e. Fuels, paint, lead, cleaners etc
-
15.3 Containers are labelled correctly?
-
15.4 Safety Data Sheets (SDS) available?
-
15.5 HAZCHEM signage displayed prominently?
-
15.6 Flammable Storage & Emergency Procedures available and in place?
-
15.7 A Risk Assessment/Permit has been completed and controls implemented?
-
15.8 Contractors supervising the removal of asbestos are licensed, qualified and insured?
-
15.9 Gas bottles are secured and stored upright in a well-ventilated area?
-
15.10 Air monitoring is being undertaken to monitor for airborne contaminates
16. MANUAL HANDLING (MH)
-
16.1 MH Risk Assessment conducted and Work Procedures/SWMS in place?
-
16.2 MH controls implemented i.e. trolleys, cranes, items separated, job rotation?
17. LASERS
-
17.1 Staff using laser equipment can show evidence of relevant training being undertaken?
-
17.2 Suitable signage is displayed?
18. NOISE
-
18.1 Plant and equipment is maintained?
-
18.2 Noisy works identified in SWMS?
-
18.3 Site hours observed? Schedule works to minimise the impact on others
-
18.4 Noise controls including isolation, baffles and PPE is being implemented?
-
18.5 Radios or Personnel hearing devices are not being used?
19. DEMOLITION
-
19.1 A demolition plan incl Risk Assessment and SWMS are undertaken and documented?
-
19.2 Safework has been notified of demolition work over 6m, asbestos, or buried tanks?
-
19.3 Access is restricted to the demolition area?
-
19.4 Is Overhead protection/hoarding in place?
-
19.5 Services have been isolated, purged, tagged and locked out?
-
19.6 Is a copy of an asbestos register on site identifying the location of hazardous materials
-
19.7 The site is progressively clean of waste and debris?
20. TRAFFIC CONTROL AT WORKSITE (Does not include Rail corridors)
-
20.1 Is there an approved Traffic Control Plan (including cyclist & pedestrians) for this site?
-
20.2 Have controls been set up as per the Traffic Control Plan? Are inspections recorded?
-
20.3 Are Traffic Control Signs covered adequately when not in use?
-
20.4 Traffic Control Signs clearly visible & not affected by other signs, vegetation or shade?
-
20.5 VMS are placed where there is time for drivers to view & comprehend the message
-
20.6 Do Traffic Controllers have appropriate training qualifications?
-
20.7 Are Traffic Controllers wearing appropriate Hi-Visibility safety clothing?
-
20.8 Are Traffic Controllers able to communicate with each other (line of sight, 2-way radios)?
21. WORKING ADJAENT TO/ or OVER WATER
-
21.1 The weather conditions and tides are suitable for the current works?
-
21.2 Never Staff work in pairs or as part of a work crew around water
-
21.3 Boat operators are licensed with RMS?
-
21.4 Check boats are in good condition. Make sure there is sufficient water and fuel
-
21.5 RMS requirements for Anchors, flares, paling bucket, radios, maps,
-
21.6 Others know of where you are going, number of people on board & when you will return
-
21.7 Personal Floatation Device is worn within 2m of water’s edge
-
21.8 Boat ramps, wharves or pontoons are used to access and load boats?
22. INSTALLATION OF STRUCTURAL STEEL/TILT UP CONCRETE PANELS
-
22.1 A plan setting out the sequence of works has been documented by qualified persons?
-
22.2 Plant selections considers the size, shape, weight of members, access & topography?
-
22.3 Clear access is provided to the footings and frame connection locations?
-
22.4 All components used on site are compatible (lifting points, attachments, braces)?
-
22.5 When possible items are assembled on the ground and lifted into position?
-
22.6 Tag lines are used to direct suspended loads? (Other workers are isolated from lifting)
-
22.7 Scaffolding or a motorised work platforms are used to access connection points?
-
22.8 Incomplete works are temporarily propped, braced and fixed off?
23. ADDITIONAL ISSUES - OBSERVATIONS
-
Any Additional observations
23. FOLLOW-UP CHECKS
-
Follow - Up checks
-
Date
(Organisation)
-
Name
-
Oranisation
-
Signature
-
Date
Project Delivery
-
Name
-
Shoalhaven City Council Section
-
Signature
-
Date
-
Issued:
-
Next review date