Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General Site Safety
-
Select the weather conditions experienced at the time of this visit.
- Heavy Rain
- Heavy Winds
- Frost/Ice
- Fog
- Sunny (Hot)
- Other
-
Detail the 'other' conditions
-
Can the work be completed safely due to the conditions stated
-
Perimeter Security
-
Site Accesss
-
Protection of the public including pedestrians/moving/parked vehicles etc
-
Welfare provision
-
-
Temporary Electrical Supply
-
Asbestos Containing Materials - Management
-
Fire Precautions - preventative measures (Site)
-
Signs and Notices
-
First Aid Provision Suitable?
-
Enter name of First Aider
-
Enter Location of the first aid kit
-
Has there been any accidents reported from this site?
-
Has the incident been reported to the main office and is a copy of the accident book entry completed on site?
-
Materials Stored safely and securely
Site Documentation
-
F10 - Notification applicable?
-
Construction Phase Plan (CPP) on-site
-
Risk Assessment on-site
-
Have they been signed by all team members
-
Safe Working Procedures on-site
-
Have they been signed by all team members
-
Point of work Assessments completed
-
Method statement(s) on -site
-
Records of tool box talks on-site (TBTs)
-
Insert the title of the latest TBT completed.
-
Have the operatives received a Site Induction
-
Are the COSHH Assessment on-site
-
Permit to work issued and in use
-
Certificates of training on-site
-
Records of previous inspection reports on-site
Work Specific
-
Scaffold Structure
-
Ladders for access or short duration work
-
Mobile towers
-
Easi-dec system
-
Hop-ups
-
Podium Steps
-
Step Ladders
-
Bocker Hoist
-
Point of work - Housekeeping
-
Hot Works completed safely
-
Correct PPE worn and in good condition
-
Suitable Edge Protection - on all leading/exposed edges
-
MEWPS used safely
-
RPE worn in accordance with risk assessments
-
Are wearers clean shaven and face fit tested
-
Hand tools suitable
-
Power tools suitable
-
Battery Powered Tools
-
PAT Testing in date
-
Lifting Operations completed safely
-
Dust Suppression in use
-
Manual Handling being completed safely