HAVE ALL CONTRACTORS’ EMPLOYEES WORKING ON THE PROJECT SIGNED IN TO SITE?<br><br>(INCLUDE SUB CONTRACTORS)<br>
-
HAVE ALL CONTRACTORS UNDERGONE A SITE INDUCTION WITHIN THE LAST 12 MONTHS?<br><br>(INCLUDE SUB CONTRACTORS)<br>
-
ARE ALL CONTRACTORS WEARING APPROPRIATE PPE FOR JOBS BEING CARRIED OUT? <br><br>(INCLUDE SUB CONTRACTORS)
-
IS THE WORKING AREA FENCED / BARRIERED OFF AND SUITABLY SIGNED?
-
IS HOUSEKEEPING BEING KEPT TO A GOOD STANDARD? (e.g. is the work area free from trip hazards? / Is the work area tidy? / are hazardous materials/substances being stored appropriately?)
-
ARE ALL CONTRACTORS AWARE OF THE EMERGENCY PROCEDURES?
-
ARE METHOD STATEMENTS AND RISK ASSESSMENTS AVAILABLE TO INSPECT?
-
ARE PERMITS TO WORK AVAILABLE TO INSPECT AT THE WORK AREA?
-
IS THE WORK BEING CARRIED OUT AS PER THE METHOD STATEMENT AND PERMIT STIPULATIONS?
-
ARE ALL TOOLS BEING USED SUITABLE FOR PURPOSE? (e.g. are electrical portable tools & cables in good condition & appropriate for the work? / Is lifting tackle suitable for task, in good condition and certification available to inspect and intrinsically safe portable electrical equipment used when required?)
-
ARE TOOLS MAINTAINED IN GOOD REPAIR AND ARE ALL SAFETY DEVICES OPERATING CORRECTLY? (e.g. Are appropriate guards in place? Have the appropriate pre-use inspections/checklists been completed prior to use?)
-
CHECK THAT THE APPROPRIATE HEALTH SURVEILLANCE HAS BEEN CONDUCTED (E.G. RESPITORY FUCTION TESTS, HEARING SCREENING, HAND- ARM VIBRATION (HAV), MANUAL HANDLING
-
ARE ACCESS AND EGRESS POINTS BEING MAINTAINED IN A SAFE MANNER?
-
HAVE ALL ACCIDENTS, HOWEVER MINOR, BEEN REPORTED AND ENTERED INTO THE ACCIDENT BOOK?
-
ARE EMPLOYEES TRAINING RECORDS & COMPETENCY CERTIFICATION AVAILABLE TO INSPECT?
-
ARE THERE ANY CONCERNS REGARDING INTERFACES BETWEEN CONTRACTORS (e.g. is there adequate supervision? / Is there sufficient communication? / are there more than one contractor in the same location and are they aware of each others’ activities? / is there evidence that info discussed at H&S meetings is being shared / communicated successfully?)
-
ARE APPROPRIATE WELFARE FACILITIES IN PLACE AND IN GOOD CONDITION?
-
ARE DISPOSAL OF RUBBISH/WASTE BEING ADEQUATELY MANAGED?
-
ARE SCAFFOLDS COMPLETE AND “SCAFF TAGS” IN DATE?
-
IS THE WORK AT HEIGHT REGULATIONS BEING COMPLIED WITH? (E.G. CHECK LADDERS, PODIUMS, PLATFORMS AND MEWPS ARE IN GOOD CONDITION AND WORKING ORDER. CHECK SSOW & PTW)
-
ARE HAZARDOUS SUBSTANCES BEING CONTROLLED UNDER THE COSHH REGULATIONS (E.G CHECK STORAGE AREAS AND SAFETY DATA SHEETS AND REGISTER)
-
ARE CONTRACTORS INFORMED OF ANY ASBESTOS ON SITE (CHECK SITE ASBESTOS REGISTER AND CONTRATOR RAMS / COMMUNICATIONS)
-
IS THE CONFINED SPACES REGULATIONS (CSE) BEING COMPLIED WITH? (E.G CHECK THE CSE REGISTER, SSOW AND PTW)
-
ARE ISOLATION PROCEDURES IN PLACE (E.G. CHECK SSOW, PTW (RAMS) CARRY OUT A PHYSCIAL CHECK OF LOTO)
-
IS THE WORK BEING CARRIED OUT WITHIN ZONED AREAS AND IS THE REPLACEMENT EQUIPMENT ATEX RATED? (DSEAR REGS)
-
HAS THE CONSTRUCTION PROJECT BEEN ASSESSED TO ENSUIRE THAT THE COMAH INVENTORY IS NOT AT RISK (E.G. SPIRIT TANKS, CRANES AND HAZARDOUS SUBSTANCES
Conclusions
-
HAS THE CONTRACTOR PERFORMANCE BEEN DISCUSSED WITH THE PERMIT ISSUER/SITE MANAGEMENT AND ANY SHORT FALLS CLEARLY COMMUNICATED TO THE CONTRACTOR AS REQUIRED?
-
Findings / Recommendations
-
HAVE ALL THE ACTIONS FROM THE PREVIOUS AUDITS BEEN COMPLETED?
-
Findings / Recommendations
-
Other Comments/Observations