Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Pre Start-up

  • Are the rollers, belt and system free from debris?

  • Are the rollers, belt and system free from any spillages?

  • Are there any signs of missing rollers?

  • Are all guards in place and secure?

  • Is safety signage in place, visible and in good condition?

Start-up

  • Ensure that the belt and system is clear of all personnel before starting!!!

  • Does the start-up siren sound and (if fitted) beacon lights when operational?<br>

  • Is the belt free form damage? (e.g. cuts, abrasions, wear and tear)

  • Do all emergency stop points work?

  • Do all operation of controls on the panel operate correctly?<br>

  • Are isolation switches in place and working (switch on/off)<br>

  • Are Lock Out locks available in the event f fault and isolation?

Sign Off

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.