Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Pre Start-up
-
Are the rollers, belt and system free from debris?
-
Are the rollers, belt and system free from any spillages?
-
Are there any signs of missing rollers?
-
Are all guards in place and secure?
-
Is safety signage in place, visible and in good condition?
Start-up
-
Ensure that the belt and system is clear of all personnel before starting!!!
-
Does the start-up siren sound and (if fitted) beacon lights when operational?<br>
-
Is the belt free form damage? (e.g. cuts, abrasions, wear and tear)
-
Do all emergency stop points work?
-
Do all operation of controls on the panel operate correctly?<br>
-
Are isolation switches in place and working (switch on/off)<br>
-
Are Lock Out locks available in the event f fault and isolation?
Sign Off
-
Signature