Information
-
Document No.
-
Scoping Meeting Notes:
-
Site Address:
-
Conducted on:
-
Prepared by:
-
Location:
-
Present @ Scope:
-
Coop RPM
- Richard Buddle
- Andy Pugh
- Sarah O`Brien
- Kevin Haybour
- Paul Stonebridge
- Gary Coultert
- Jordan Manton
- Jake Mason
- Chris Wragg
Key Dates
-
Scoping Meeting
-
Cost Validation
-
Scheme Validation
-
Pre-Start Meeting
-
Start on Site
-
Launch Store
Shop Front / Front Elevation
Shop Front
-
Existing shop front material?
-
Re-decorate existing shop front?
-
Existing shop front stall riser re-decorated?
-
Is a Glass survey required?
-
Shopfront / Door contractor is?
-
Are any repairs to the shop front / frame / door required?
Please state: -
Dimensions of existing shopfront entrance door:
-
Will the main entrance door need to be removed for the new case delivery?
-
Additional Information/Items
Item
Roller Shutter
-
Existing Roller Shutters?
-
Re-decorate existing roller shutters?
-
Additional roller shutter items to be re-decorated?
- Roller shutter guides
- Roller shutter boxings
- Roller shutter laths (ALL)
- Roller shutter laths (BOTTOM 3 ONLY)
-
Are NEW roller shutters required?
-
Additional Information/Items
Item
Shopfront Signage
-
Remove and retain existing Lottery Signage?
-
Signage Sub-contractor is?
-
External Lighting?
-
Shop front signage?
- Existing signage to be retained
- Damaged panels replaced
- Complete NEW signage
- New LED lights
- New Opening Times installed
-
Remove existing Paypoint Signage?
-
Additional Information/Items
Item
Existing ATM
-
Existing ATM
- To be retained
- To be removed from store
- Refurbish / Service required
- ATM surround required
-
Photo of Existing ATM
General Items
-
Litter Bins (free standing & wall mounted)
-
Mobile Trolley Bay
-
General de-weed and jetwash to front paving to shopfront
-
Additional Information/Items
Item
Additional Scoping Information/Items
-
Additional Scoping Items
Item:
Rear Elevation
Service Yard Surface
-
Service yard surface?
-
Are repairs required?
-
Additional Information/Items
Item
Rear Service yard door
-
Additional Information/Items
Item
-
Rear Service yard door
-
Proposed works to Service door?
-
Existing clear opening widths (Width x Height)
-
Roller Shutter to Rear service yard?
-
Proposed Works to roller shutter
-
Additional decorations to roller shutter
- Roller shutter guides
- Roller shutter boxings
- Roller shutter laths (ALL)
- Roller shutter laths (BOTTOM 3 ONLY)
Refrigeration Pack and Works
-
Proposed works required for new refrigeration pack
- Proposed concrete slab
- Key Klamp handrail to new slab
- Assountic Fence
- New peneterations to external wall
- Removal of existing units/packs
- No works required
-
Additional Information/Items
Item
Repair works
-
Additional Information/Items
Item
-
Repairs to external wall
- Yes
- No
- N/A
General Items:
-
Additional Information/Items
Item
-
Newspaper storage
-
Existing external lighting
-
De-weed and jet wash service yard.
Additional Scoping Information/Items
-
Additional Information/Items
Item
Side Elevation
-
Additional information / Items
Item
Sales Floor
Ceiling
-
Existing Ceiling tiles
-
Proposed works to ceiling grid?
-
Proposed works to ceiling tiles?
-
Existing AC units to be re-located within ceiling grid?
-
Air Curtain within ceiling over entrance door?
-
Is fire boarding required to soffit?
-
Additional Information/Items:
Item
Kiosk
-
Existing front line?
-
Is a Managers works station required?
-
Lottery unit?
-
Existing Back line
-
Is a security wall required?
-
Community Wall?
-
Kiosk location to be retained?
-
Additional Items:
Item:
Perimeter Wall
-
Additional scoping items:
Item
-
Works required to bulkheads?
Item
-
Existing perimeter freeze?
-
Additional Information/Items
Item
Lightings
-
Existing ceiling lights?
-
Proposed works to light fittings?
-
Additional Information/Items:
Item
Flooring
-
Existing floor covering?
-
Proposed works to floor covering?
-
Matwell?
-
Are tagging gates to be installed?
-
Additional Information/Items:
Item
Security System
-
CCTV
-
Additional Information/Items:
Item
General Items:
-
Air Tube?
-
Costa Coffee?
-
Internal ATM
-
Internal ATM Housing?
-
Walls Unit?
-
Additional Information/Items
Item
Additional Scoping Items
-
Additional Scoping Items:
Item
Door to warehouse
Door and Frame
-
Door width to be increased?
-
Existing Width: mm
-
Proposed Width: mm
-
Door location?
-
Proposed works to Door
- Retain existing door and frame
- Install new door
- Install new frame
- New checker plate
- New Mag-Lock
- New push plate
- New vision panel
-
Is a FIRE door required?
-
Decoration to door and frame?
-
Photo of Warehouse Door
-
Additional Information/Items:
Item
Warehouse
Ceiling
-
Additional Information/items:
Items
-
Works required to Ceiling Tiles
-
Works required to plastered/exposed soffit ceiling
- Yes
- No
- N/A
Walls
-
New warehouse dividing wall required? (is the overall storage larger than 280sqm or is the warehouse large than a1/3 of the total floor area? then 60mins fire resistance is required)
-
Existing warehouse walls?
-
Proposed works required?
-
Additional Information/items:
Item
Flooring
-
Works required to floor?
- None - Retain as existing/clean
- Replacewith new non slip vinyl
- Localisedconcrete repairs
- Yellow hatching/tram lines
-
Existing floor covering?
-
Additional Information/items:
Item
Lighting
-
Existing warehouse lights?
-
Proposed works required to lights
-
Additional Information/items:
Item
General Items:
-
Racking?
-
Checker Plate wall protection?
-
Additional Information/Items
Item
Additional Scoping Items:
-
Additional Scoping Information/items:
Item
Managers Office
Ceiling
-
Existing Ceiling within Office
-
Works required to ceiling tiles?
-
Additional Information/items:
Item
Wall
-
Works required to walls?
- Retain - no works
- Re-decorate
- Localised repairs
- Checker Plate protection
-
Additional Information/Items:
Item
Flooring
-
Existing Floor covering?
-
Proposed works required to flooring?
-
Additional Information/items:
Item
General Items
-
Decorations
- Walls
- Ceiling
- Skirtings
- Door
- Frames
- Windows
-
General works to be carried out:
- Re-decorate skirting
- REmoved skirting andreplace with cove skirting
- Re-decorate door and frames
- Worktops to be retained
- Worktops to be replaced
- Wall shelves to be retained
- Wallshelves to be replaced
-
Additional Information/items:
Item
Canteen
Ceiling
-
Existing ceiling within Canteen?
-
Works required to ceiling?
-
Additional Information/Items:
Item
Wall
-
Works required to walls?
- Retain - no works
- Re-decorate
- Localised repairs
- Checker Plate protection
-
Additional Information/Items:
Item
Flooring
-
Existing Floor covering?
-
Proposed works required?
-
Additional Information/Items:
Item
General Items:
-
General works to be carried out
- Re-decorate skirting
- REmoved skirting andreplace with cove skirting
- Re-decorate door and frames
- Worktops to be retained
- Worktops to be replaced
- Wall shelves to be retained
- Wallshelves to be replaced
-
NEW white good pack? Fridge/kettle/mircowave
-
Existing notice boards
-
Existing lockers
-
Existing Chairs/Stools
-
Additional Information/Items:
Item
ISB Prep Room
Ceiling
-
Existing ceiling within Prep Room?
-
Proposed works to ceiling?
-
Additional Information/Items:
Items
Flooring
-
Existing floor covering?
-
Works required to floor covering?
-
Additional Information/Items:
Item
Wall
-
Works required to walls?
-
Existing wall covering?
-
Additional Information/Items:
Item
General Items
-
Oven
-
Stainless steel backing to oven?
-
New isolator switch to be provided?
-
General items to be carried out?
- Re-decorate skirting
- REmoved skirting andreplace with cove skirting
- Re-decorate door and frames
- Worktops to be retained
- Worktops to be replaced
- Wall shelves to be retained
- Wallshelves to be replaced
-
Additional Information/Items:
Item
WC Male
Ceiling
-
Existing ceiling within Male WC.
-
Proposed works to ceiling?
Wall
-
Works required to walls?
- Retain - no works
- Re-decorate
- Localised repairs
- Checker Plate protection
-
Additional Information/Items:
Item
Flooring
-
Existing Floor covering?
-
Proposed works required to flooring?
-
Additional Information/items:
Item
General Items
-
Decorations
- Walls
- Ceiling
- Skirtings
- Door
- Frames
- Windows
-
General works to be carried out:
- Re-decorate skirting
- REmoved skirting andreplace with cove skirting
- Re-decorate door and frames
- Worktops to be retained
- Worktops to be replaced
- Wall shelves to be retained
- Wallshelves to be replaced
-
Additional Information/items:
Item
Female WC
Ceiling
-
Existing ceiling within Female WC?
-
Proposed works to ceiling?
Wall
-
Works required to walls?
- Retain - no works
- Re-decorate
- Localised repairs
- Checker Plate protection
-
Additional Information/Items:
Item
Flooring
-
Existing Floor covering?
-
Proposed works required to flooring?
-
Additional Information/items:
Item
General Items
-
Decorations
- Walls
- Ceiling
- Skirtings
- Door
- Frames
- Windows
-
General works to be carried out:
- Re-decorate skirting
- REmoved skirting andreplace with cove skirting
- Re-decorate door and frames
- Worktops to be retained
- Worktops to be replaced
- Wall shelves to be retained
- Wallshelves to be replaced
-
Additional Information/items:
Item