Job Site Information
-
Job Specific Emergency Numbers Posted?
-
Safety Meeting/Toolbox Talk Completed?
-
First Aid Kit properly stocked and available?
-
Add media
Permit's and JSA's
-
Hot Work Permit?
-
Safe Work Permit?
-
Confined Space Permit?
-
Is a JSA completed for each task?
-
Excavation Assessment been completed?
-
Add media
HOUSEKEEPING
-
Work areas neat?
-
Projecting nails or screws bent over or removed?
-
Passageways and walkways clear?
-
Passageways easily accessible?
-
Cords and leads off the floor?
-
Are Sanitary Facilities Adequate and Clean?
-
Add media
FIRE PREVENTION
-
Adequate fire extinguishers located throughout job site?
-
Fire Extinguishers inspected as required and accessible?
-
Job specific phone no. of Fire Department posted?
-
Fuels properly stored?
-
Only approved containers for flammables and combustible liquids used?
-
Add media
ELECTRICAL
-
Extension wires with bare wires or missing ground prongs taken out of service?
-
Ground fault interrupters being used?
-
Are there any exposed live electrical parts?
-
Are portable generators properly grounded and in good working order?
-
Are proper LOTO procedures being applied?
-
Add media
HAND & POWER TOOLS
-
Hand tools inspected regularly and free of damage?
-
Guards in place on machines and tools?
-
Correct tool being used for job at hand?
-
Power tools properly grounded?
-
Are damaged tools taken out of Service?
-
Have Employees been instructed on the proper use of the equipment?
-
Are electric pumps in good working order and properly sealed?
-
Have all tools been properly inspected?
-
Have extension cords been inspected?
-
Add media
FALL PROTECTION
-
Safety rails and cables secured properly?
-
Safety harnesses worn properly and inspected before use?
-
Employees exposed to fall hazards tied off?
-
Employees below protected from falling objects?
-
All holes in walking/ working surfaces are covered or barricaded, and properly marked?
-
Materials stored away from edge?
-
If guardrail systems are used is the Top rail 42", and Mid rail 21"?
-
Are Re bar and Anchor Bolts Protected?
-
Are Excavated Areas protected from Pedestrians?
-
Are barricades being utilized? If so have they been properly installed and in good working condition?
-
Add media
LADDERS
-
Ladders extended at least 36" above landing?
-
Ladders are secure to prevent slipping, sliding or falling?
-
Are ladders missing rungs or damaged? If so, are they marked and taken out of service?
-
Stepladders used in fully open position?
-
Are Ladders in good condition and Inspected?
-
Add media
SCAFFOLDING
-
Is there any scaffolding on the jobsite?
-
All scaffolding inspected daily and tags updated?
-
Erected on sound rigid footing?
-
Tied to structure as required?
-
Guardrails, mid-rails, toe boards and screens in place and installed as required?
-
Proper access provided?
-
Scaffold Platform is fully planked?
-
Employees below protected from falling objects?
-
Add media
TRENCHES, EXCAVATION & SHORING
-
Are there any excavations on the Jobsite?
-
Has Overhead and Underground Hazards been assessed and Protected or eliminated?
-
Competent person identified and present?
-
Are excavations 5' or greater in depth are shored, benched or sloped back?
-
SOLID OR ROCK TYPE MAXIMUM ALLOWABLE SLOPES (H:V) (<20FT)
STABLE ROCK.............................. VERTICAL (90)
TYPE A.......................................... 3/4:1 (53)
TYPE B.......................................... 1:1 (45)
TYPE C.......................................... 1 1/2 : 1 (34) -
Materials are stored at least 2' away from trench?
-
Ladders provided within 25' of personnel in trench?
-
Equipment is at a safe distance from edge of trench or excavation?
-
Underground utilities marked?
-
Any hazardous atmospheres identified and monitored?
-
Is excavation assessment complete and onsite?
-
Has Excavation been Inspected and documented?
-
Are shoring and trench boxes being utilized?
-
Have the trench boxes been inspected?
-
Is the tabulated data onsite?
-
Add media
Confined Space
-
Is there a Confined Space?
-
Is this a Permit Required Space?
-
Is Continuous Air monitoring being utilized?
-
Is there a means of communication between hole watch and entrants?
-
Is there a hole watch?
-
Has emergency crew been Identified?
-
Is the Confined Space properly barricaded?
-
Is proper PPE being used for the task?
-
Is there safe access and egress?
-
Have you notified or communicated entry with General Contractor?
-
Are you using all necessary PRCS equipment (tripod, winch, harness, etc..)
-
Have you performed pre-entry inspection and checklist?
-
Have you filled out entry-permit and held JSA for job task?
-
Are you entering the space under alternate entry procedures?
-
Are all known hazards eliminated or controlled?
-
Add media
MATERIAL HANDLING
-
Materials properly stored or stacked?
-
Employees using proper lifting techniques?
-
Tag lines used to guide loads?
-
Chemical containers properly labeled?
-
Add media
Burning, Welding, Grinding, Chipping, and Cutting
-
Are there any welding or cutting activities on the jobsite?
-
Gas cylinders are secured stored upright?
-
Proper separating distances between fuels & oxygen? (20'min)
-
Goggles or face shields used?
-
Fire extinguishers readily available?
-
Hoses in good condition?
-
Are Chop Saws or Floor Saws being used?
-
Are wet methods being used?
-
Are Face Shields being utilized?
-
Are dust masks available and being utilized when grinding, chipping, or cutting?
-
Add media
CRANES and CONSTRUCTION EQUIPMENT
-
Are there any cranes on the jobsite?
-
Outriggers on solid ground and load radius including load barricaded?
-
Are Overhead Power Lines Inactive or Protected?
-
Are cranes keeping safe distance from Power line?<br>50kV - 10'<br>50kV to 200kV - 15'<br>200kV to 350kV - 20'<br>350kV to 500kV - 25'<br>500kV to 750kV - 35'<br>750kV to 1,000kV - 45'
-
Signal men being utilized?
-
Daily visual inspection Completed?
-
Crane has documentation of valid annual inspection?
-
Employees kept from under suspended loads?
-
Chains and slings inspected and tagged as required?
-
Employees handling loads trained in rigging and signaling?
-
Daily pre-operational inspections performed and documented?
-
Vehicles are equipped with back-up alarms that are working properly?
-
Seat belts worn?
-
All Lights are Functional?
-
Are Spotters being utilized?
-
Add media
AERIAL LIFTS
-
Are there any aerial lifts on the jobsite?
-
Daily pre-operational inspections performed and documented?
-
Fall arrest systems used on boom or articulating lifts?
-
Operators trained?
-
Add media
PERSONAL PROTECTIVE EQUIPMENT
-
Is proper hand protection being utilized by ALL employees?
-
Hard hats being worn?
-
Are FR clothing being worn?
-
Are H2S monitors being worn?
-
Are 4/5 gas meters being utilized?
-
Are face shields available when needed?
-
Safety glasses being utilized by ALL employees?
-
Respirators used when required? Proper respirator documentation available?
-
Hearing protection being worn by ALL employees?
-
Traffic vests or high visibility clothing material being worn?
-
Add media
HAZCOM/SDS
-
Is applicable SDS and hazard communication policy present?
-
Are all containers containing chemicals properly labeled and readable?
-
Are employees informed about where to find the SDS books?
-
Are proper PPE being used when working around chemicals? Refer to the SDS for proper PPE.
-
Are workers aware of the proper procedures to follow if exposed to a hazardous chemical?
-
Add media
AUDIT CONCLUSIONS
-
Add media
SIGNATURE
-
Site Lead
-
Auditor's Signature