Title Page

  • Audit Title

  • Client / Site

  • Conducted on

  • Location

Store Overview

  • Store front picture

  • Store contact details

  • Store opening hours

  • What new machines are required?

  • Desired location of the new Costa machine

  • Desired location of the new Turboserve unit (if applicable)

  • Racking relocation area (if applicable)

  • Are there residents living above this store?

  • Are there any existing noise complaints from residents?

  • Will the store manager be able provide night cover/security during the works?

Access/Egress considerations

  • Store entrance photo

  • What is the sales floor ceiling height?

  • Are there any height restrictions?

  • If a height restriction has been identified, what is the maximum clearance?

  • Is parking available on site for contractors and deliveries?

  • Photograph of contractor/deliveries parking location

  • If onsite parking is not available where is the nearest parking location (confirm with store)

Asbestos

  • Is an asbestos survey available on C365/Coop portal?

  • Do store have an up to date asbestos register/asbestos survey?

  • Has asbestos been identified within the surveys at this store?

Existing M&E information

  • Does the store O&M Manual have: Drainage locations and Water/Electrical service routes available?

  • If in part is selected what is missing?

  • Electrical distribution board photo

  • Electrical distribution circuit chart photo

  • What is the approximate distance between the DB board and the desired location for the Costa machine/Turboserve

  • Is the incoming water stop tap location identified in the service drawings or known by store?

  • Photo of nearest known cold water feed

  • What is the approximate distance between the nearest cold water feed and the desired location for the Costa machine?

  • Photo of nearest pop up drainage point on the sales floor (if available)

  • Photo of nearest BOH foul drainage

  • What is the approximate distance between the BOH foul drainage and the desired location for the Costa machine?

Proposed M&E and builders works

  • Proposed service routes to new Costa machine/Turboserve (mark up on asset plan and photograph)

  • Is fire stopping required? (services penetrating BOH/Sales fire wall)

  • Are joinery works required?

  • Detail what joinery works will be required (e.g Perstop, plasterboard ceilings...)

  • Will a chrome service pole/sleeve required to hide the new services to the Costa machine/Turboserve?

  • List any other site specific materials/requirements to provide a quality finish

Final considerations

  • Enter any further considerations not captured by the above

Acceptance/Review

  • Store Manager/Assistant

  • Surveyor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.