1 - Substructure
1.1- Foundations
-
Evidence of deterioration in any visible footings/foundations?
-
Extent of deterioration
- Minor cracking or deterioration
- Deterioration noticeable however deemed cosmetic
- Deterioration requires further investigation
- Waterproof membrane appears to be compromised requiring potential repair/replacement
- Wall surfaces require repair and repainting
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works to rectify deterioration if not indicated above
1.2- On Ground Slab
-
Evidence of deterioration of the slabs, expansion joints, slab edges and surfaces
-
Extent of deterioration
- Minor cracking or deterioration
- Deterioration noticeable however deemed cosmetic
- Deterioration requires further investigation
- Waterproof membrane appears to be compromised requiring potential repair/replacement
- Wall surfaces require repair and repainting
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works to rectify deterioration if not indicated above
2 - Super Structure
2.1 - Columns
-
Evidence of deterioration in any visible columns?
-
Extent of Deterioration
- Minor cracking or deterioration
- Deterioration noticeable however deemed cosmetic
- Deterioration requires further investigation
- Waterproof membrane appears to be compromised requiring potential repair/replacement
- Wall surfaces require repair and repainting
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
-
Additional comments
2.2 - Upper Floors
-
Evidence of deterioration in any visible floors, slab cracking or floor deflections.
-
Extent of Deterioration
- All surfaces appear to be in good condition
- Minor cracking noticable
- Level of cracking to slab surface requires further investigation
- Some minor floor deflections noticable
- Floor deflections are noticeable and would require minor surface treatment
- Floor deflections are considerable and extensive filling required
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
-
Additional comments
2.3 - Staircase
-
Evidence of deterioration in any staircases?
-
Extent of Deterioration
- Minor cracking or deterioration
- Deterioration noticeable however deemed cosmetic
- Deterioration requires further investigation
- Waterproof membrane appears to be compromised requiring potential repair/replacement
- Wall surfaces require repair and repainting
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
-
Additional comments
2.4 - Roof Areas
-
Evidence of deterioration in any visible roof areas?
-
Extent of Deterioration
- Minor cracking or deterioration
- Deterioration noticeable however deemed cosmetic
- Deterioration requires further investigation
- Waterproof membrane appears to be compromised requiring potential repair/replacement
- Wall surfaces require repair and repainting
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
-
Additional comments
2.5 - External Walls and Facade
-
Evidence of deterioration in any visible external walls and/or facades?
-
Extent of Deterioration
- General condition appears to be acceptable with routine cleaning and maintenance
- Wall surfaces show signs of deterioration with possible repair or painting required
- Wall surfaces in poor condition requiring extensive repair works
- Facade panels showing signs of deterioration however routine maintenance expected to improve condition
- Facade panels showing advanced signs of deterioration. Further investigation required.
- Facade glass requires cleaning
- Facade glass showing signs of advanced deterioration with staining evident
- Facade seals deteriorated or pulling away from facade. Further investigation required
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
-
Additional comments
2.6 - External Doors
-
Evidence of deterioration in any external doors?
-
Extent of Deterioration
- Doors and frames in good condition with little or no signs of deterioration
- Doors and frames showing signs of deterioration, routine maintenance required
- Doors and frames showing signs of advanced deterioration requiring extensive maintenance and or replacements
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
-
Additional comments
2.7 - Internal Walls
-
Evidence of deterioration in any internal walls?
-
Extent of Deterioration
- Minor cracking or deterioration
- Deterioration noticeable however deemed cosmetic
- Deterioration requires further investigation
- Waterproof membrane appears to be compromised requiring potential repair/replacement
- Wall surfaces require repair and repainting
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
-
Additional comments
2.8 - Internal Screens and Partitions
-
Evidence of deterioration in any internal screens?
-
Extent of Deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
-
Additional comments
2.9 - Internal Doors
-
Evidence of deterioration in any internal doors?
-
Extent of Deterioration
- Doors and frames in good condition with little or no signs of deterioration
- Doors and frames showing signs of deterioration, routine maintenance required
- Doors and frames showing signs of advanced deterioration requiring extensive maintenance and or replacements
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
-
Additional comments
2.10 - Windows
-
Evidence of deterioration to any windows?
-
Extent of Deterioration
- General condition appears to be acceptable with routine cleaning and maintenance
- Wall surfaces show signs of deterioration with possible repair or painting required
- Wall surfaces in poor condition requiring extensive repair works
- Facade panels showing signs of deterioration however routine maintenance expected to improve condition
- Facade panels showing advanced signs of deterioration. Further investigation required.
- Facade glass requires cleaning
- Facade glass showing signs of advanced deterioration with staining evident
- Facade seals deteriorated or pulling away from facade. Further investigation required
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
-
Additional comments
2.11 - Eaves Linings
-
Evidence of deterioration to any eaves linings?
-
Extent of Deterioration
- Surfaces in good condition
- Surfaces require routing cleaning/maintenance
- Surfaces require repair/repainting
- Surfaces require extensive repairs/replacement.
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
-
Additional comments
3 - Furniture, Fittings and Finishes
3.1 - Wall Finishes
-
Evidence of deterioration in any wall finishes?
-
Extent of deterioration
- General condition appears to be acceptable with routine cleaning and maintenance
- Wall surfaces show signs of deterioration with possible repair or painting required
- Wall surfaces in poor condition requiring extensive repair works
- Facade panels showing signs of deterioration however routine maintenance expected to improve condition
- Facade panels showing advanced signs of deterioration. Further investigation required.
- Facade glass requires cleaning
- Facade glass showing signs of advanced deterioration with staining evident
- Facade seals deteriorated or pulling away from facade. Further investigation required
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
3.2 - Floor Finishes
-
Evidence of deterioration in any floor finishes?
-
Extent of deterioration
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
3.3 - Ceiling Finishes
-
Evidence of deterioration in any ceiling finishes?
-
Extent of deterioration
- Ceiling surfaces, grid, tiles in good condition
- Ceilings have some minor damge
- Ceilings have damaged surfaces,grid or tiles that require replacement
- Ceilings have extensive damage and will require replacement
- Ceilings showing evidence of water leaks. Further investigation required
- Ceilings showing signs of extensive water leaks requiring further investiogation
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
4 - Mechanical Systems
6.1.1 - Exhaust Systems
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.1.2 - Evaporative Cooling Units
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.1.3 - Air Conditioning Units
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.1.4 - Air Distribution
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.1.5 - Cool Rooms Refrigeration
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.1.6 - Building Automation & Control
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.1.7 - Chilled water pumps
-
Plant Item
Cooling Tower
-
Plant/Equipment Description. Include information on tower type (wet, open/closed, air cooled etc)
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details, flow, head, evidence of leaks etc
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.1.8 - Condenser water pumps
-
Plant Item
Cooling Tower
-
Plant/Equipment Description. Include information on tower type (wet, open/closed, air cooled etc)
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details, flow, head, evidence of leaks etc
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.1.9 - Maintenance
6.1.10 - As Constructed Documents
5 - Electrical Systems
6.2.1 - Electrical Mains & Boards
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.2.2 - Internal Lighting Systems
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.2.3 - External Lighting Systems
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.2.4 - Exit & Emergency Lights
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.2.5 - Public Address System
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.2.6 - Telephone System
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.2.7 - Security System
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.2.8 - Standby Generator Installation
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.2.9 - Building Management System
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.2.10 - Energy & Energy Management System
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.2.11 - Electrical Maintenance
6.2.12 - As Constructed Documents
6 - Fire Services
6.3.1 - Fire Sprinklers
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.3.2 - Fire Hydrants & Hose Reels
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.3.3 - Fire Detection & Alarm Systems
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.3.4 - Emergency Warning & Evacuation System
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.3.5 - Fire Extinguishers
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.3.6 - Fire Doors & Signage
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.3.7 - As Constructed Drawings
7 - Hydraulic Services
6.4.1 - Cold Water Supply
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.4.2 - Hot Water Supply
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.4.3 - Stormwater
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.4.4 - Trade Waste
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.4.5 - Sewer
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.4.6 - Gas
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.4.7 - Sanitary Ware & Tap Ware
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.4.8 - Gas Bottles Storage
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
8 - Transportation Services
6.5.1 - Lift Controllers
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.5.2 - Brakes, Drives & Sheaves
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.5.3 - Lift & Landing Doors
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.5.4 - Lift Interiors
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.5.5 - Lift Code Compliance
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.5.6 - Lift Monitoring System
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
6.5.7 - Disabled Discrimination Act (DDA)
6.5.8 - Building Maintenance Unit (BMU)
-
Plant Item
Cooling Tower
-
Plant/Equipment Description
-
General Photograph of Plant Item
-
Photograph of Name Plate
-
Equipment Rating Details. KW
-
Enter other details
-
Plant item life cycle
- Immediate Replacement Required
- 1 to 5 Year Replacement
- 5 to 10 Year Replaceement
-
Estimate Value Range of Replacement
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimated Value of Replacement if not indicated above.
9 - External Works
7.1 - Roads, Footpaths & Paved Areas
-
Evidence of deterioration in any concrete works?
-
Extent of deterioration
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
7.2 - Boundary Walls, Fencing & Gates
-
Evidence of deterioration in any fences / gates / boundary walls etc?
-
Extent of deterioration
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
7.3 - Covered Ways / Sunshade Structures
-
Evidence of deterioration in any covered walkways / sunshades?
-
Extent of deterioration
-
Estimate value of works to rectify deterioration
- $0 to $10K
- $10K to $50K
- $50K to $100K
- $100K to $250K
- $250 to $500K
- $500K to $1M
- $1M to $2M
- $2M to $5M
- $5M to $10M
-
Estimate value of works if not indicated above
7.4 - Landscaping
7.5 - Fitments
7.6 - Special Equipment
12 - Hazardous Materials