Information
-
Contract No.
-
Inspection Title
-
Client / Site
-
Purchase Order
-
Requisition Order / Work Order
-
Conducted on
-
Issued By
-
Reviewed By
Inspection Details
-
On behalf of
-
Inspection Description
-
Inspection Location
-
Personnel
- Trevor Weldon
- Ben Robinson
- Chris Sneddon
- Connor Harrison
- Carlo Poli
- Brett Holmes
-
Method Code
- AS1171 (1998)
- AS3978 (1998)
- AS2062 (2006)
-
Product Code
- Evaluation
- AS1554.1 (SP)
- AS1554.1 (GP)
- Other
-
Test Procedure
- P-3000-MT-0009
- P-3000-VI-0001
- P-3000-PT-0001
-
Technique
-
Magnet Details
-
Material
-
Surface Condition
- As In Service
- Cleaned
- Painted
- As Welded
Results
-
Summary
-
A visual scan supplemented by magnetic particle inspection was carried out on the nominated jib crane to evaluate for the presence of cracking and/or damage. Areas deemed to be of concern were stripped of coatings and a full magnetic particle inspection was carried out.
-
Results
-
Vertical Beam/Column
- No Cracking / Damage Detected
- Cracking Detected
- Damage Detected
- Not Applicable
Details
-
Add media
-
Horizontal Beam
- No Cracking / Damage Detected
- Cracking Detected
- Damage Detected
- Not Applicable
Details
-
Add media
-
Travel Assembly
- No Cracking / Damage Detected
- Cracking Detected
- Damage Detected
- Not Applicable
Details
-
Add media
-
Hook Assembly
- No Cracking / Damage Detected
- Cracking Detected
- Damage Detected
- Not Applicable
Details
-
Add media
-
Hook Gap
-
Supporting Structure
- No Cracking / Damage Detected
- Cracking Detected
- Damage Detected
- Not Applicable
Details
-
Add media
-
Electrical Boxes and Cables
- No Cracking / Damage Detected
- Cracking Detected
- Damage Detected
- Not Applicable
Details
-
Add media