Title Page
-
Location Number
-
Conducted on
-
Prepared by
CT Meter Installation & Change Procedure:
-
Member Name:
-
Account Number:
-
Meter #:
-
This form is to be attached to the Service Order when a meter is installed or changed at any account with CTs or Multiplier.
Engineering Department:
-
Security Deposit:
-
Rate Schedule:
-
Minimum:
-
Multiplier:
-
Demand Meter?
-
Meter to be read monthly by Meter Technician?
-
Engineer:
Meter Department:
-
Check proper installation of CTs and wiring.
Record proper multiplier. -
Meter Technician:
Billing Department:
-
Verify meter records for proper multiplier, including demand multiplier if applicable, and change if necessary.
Record information to account for billing, including addition of Multiplier Note to account.
Run printout of account and meter information for Meter Department Verification.
Prepare meter reading sheet for Meter Technician. -
Billing Clerk:
Engineering Department:
-
Connect meter to all transformers in transformer bank.
Check billing printout for proper multiplier, including demand meter if applicable.
Return form along with original service order to Billing Department. -
Engineer: