Title Page

  • Conducted on

  • Prepared by

  • Location

Safety

  • The area is safe and free from hazards

  • Electric pallet truck scaff tag signed by operator

  • Employees within the area understand and demonstrate the key safe behaviours

  • X-ray curtains all present and in correct position

CCP

  • Warm fill sheets are at line when / where required and completed in accordance with CFILL.30

  • All X-ray's machines are functioning correctly and checks complete in accordance with CFILL.31 have been observed , reject line doors are kept locked.

  • Filler 1 & 2 & 9: Is the NEXT Calibration on the X-Ray due within 1 month? (Check Calibration Sticker)<br>If "YES" insert date due or take photo of the sticker.<br>

  • Filler 3 & 4: Is the NEXT Calibration on the X-Ray due within 1 month? (Check Calibration Sticker)<br>If "YES" insert date due or take photo of the sticker.

  • Filler 5 & 6: Is the NEXT Calibration on the X-Ray due within 1 month? (Check Calibration Sticker)<br>If "YES" insert date due or take photo of the sticker.

  • Is the NEXT Calibration on the ATP Swab Machine due within 1 month? (Check Calibration Sticker)<br>If "YES" insert date or take photo<br>

Chemical Control

  • All chemicals stored in locked COSHH cabinets when not in use including ink and additive and chain oil . CGEN.04

Paperwork & Documentation

  • All paperwork is on the correct Centuri document number

  • All paperwork is correctly completed and any corrections have been made in accordance with the Paperwork - Record Completion & Maintainance procedure

  • Weight checks complete in accordance with CFILL.05.

  • Each order has been correctly documented, foil tray labels checks have been completed in accordance with CFILL.50

  • Daily and monthly glass registers are up to date

Hygiene & Fabrication

  • All fillers are clean , free from foreign bodies , debris and excess grease internally , externally and underneath.

  • End of line equipment including conveyors and X-rays are clean and free from debris internally and externally

  • Absence of selotape engineering

  • All floors and drains are clean and free from debris.

  • Cleaning equipment such as brushes are clean and stored on the correct shadow boards. CGEN 03.

  • Cleaning schedules are complete and up to date for daily, weekly and monthly tasks

  • Internal building fabrication such as walls and floors are in a good state of repair

5s

  • Area audits complete to schedule and evidently compliant with visual standards. Logopak cabinets have been replenished

  • Foil cabinet audits are complete

  • All SIC boards are up to date with actions when hourly targets have not been met

  • Ink and additive stock are above minimum level ( Ink 50 bottles / Additive 100 bottles ). Team leader informed if minimum stock level not met and stock ordered.

  • Radios x 3 working & in good condition.

Other Comments

  • CONFIRMATION:
    I can confirm that all responses are accurate and the information contained within this audit were checked at the time of the audit by myself.

  • Verified by:

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.