TASK UNDERTAKEN:
-
SWMS / JHA USED:
-
Have all persons working signed onto SWMS / JHA?
-
CONTRACTOR OBSERVED:
-
Name of Contractor.
-
SHIFT:
Note: If a Critical Control cannot be verified, the task shall be stopped, and the controls re-evaluated to ensure that all Critical Controls are in place
-
Are all personnel working at the confined space trained and competent?
-
Has a gas test been conducted and have the results been recorded?
-
Does the monitoring equipment have a valid calibration certificate?
-
Has a confined space permit been completed and signed by all personnel involved in the task?
-
Has a rescue plan been established and is it understood by all personnel involved in the task?
-
Is a sentry present and are they controlling entry and exit points?
-
Is the sentry using an effective means of communication with personnel inside the confined space?
-
Have all energy sources been de-energised, isolated, and confirmed de-energisation?
-
Has ventilation been provided?
-
Is the work area clear of materials that could fall within the confined space?
-
Notes:
NOTIFICATIONS
-
Does anyone need to be notified of the actions identified in this report?
-