Title Page
-
Location
-
Date
-
Name
Untitled Page
-
Cell location
Cell 1 - Sash line
-
Are the dimensions and angles within tolerance and free from defects?
-
Is all prep routing clean and to specification i.e. Handle holes trickle vents and drainage?
-
Are the arrowheads and V notches within tolerance and free form chipping?
-
Are the products reinforced to specification?
-
Are the welder beds, blocks and Teflon clean and free from damage?
-
Are grooves and knifing off to standard?
-
Are inner and outer bevels to standard?
-
Is Penning-in to standard?
-
Are all hand tools in good condition?
-
Are benches, Barrows and machinery condition to standard?
Cell 2 – BDM2 – Rapid 3 and manual prep
-
Are the dimensions and angles within tolerance and free from defects?
-
Is all prep routing clean and to specification i.e. Handle holes trickle vents and drainage?
-
Are the arrowheads and V notches within tolerance and free form chipping?
-
Are the products reinforced to specification?
-
Are the welder beds, blocks and Teflon clean and free from damage?
-
Are all hand tools in good condition?
-
Please explain what is the issue.
-
Are benches, barrows and machinery condition to standard?
-
Please explain what is the issue.
Cell 3 – Fast track
-
Are welder beds, blocks and Teflon clean and free from damage?
-
Are all dimensions and angles within tolerance and free from defects?
-
Are grooves and knifing off to standard?
-
Are inner and outer bevels to standard?
-
Is Penning-in to standard?
-
Is protective tape been peeled to check colour on the profile?
-
Are benches, Barrows and machinery condition to standard?
-
Please explain what is the issue.
-
Cell 4 – Door cut to MLQC
-
Are the dimensions and angles within tolerance and free from defects?
-
Is all prep routing clean and to specification i.e. Handle holes trickle vents and drainage?
-
Are the arrowheads and V notches within tolerance and free form chipping?
-
Are the products reinforced to specification?
-
Is the aluminium infill correctly fitted?
-
Are all hand tools in good condition?
-
Are product cleaned to standard at MLQC?
-
Are benches, Barrows, racking and machinery condition to standard?
-
Please explain what is the issue.
Cell 5 – Arches/Patios
-
Are the inner and outer bevels to standard?
-
Are the handle holes and gearing aligned correctly
-
Are all hand tools in good condition?
-
Are benches, stillages and machinery condition to standard?
-
Please explain what is the issue.
Cell 6 – Gearing and Hanging windows
-
1. Is all correct hardware fitted and secured with the correct screws?
-
Is the sash coverage been completed using the Go/Nogo gauge?
-
Are the corner protectors fitted correctly?
-
Are benches, stillages and machinery condition to standard?
-
Please explain what is the issue.
Cell 7 - Beading
-
Are the ‘A’ Frames and machinery in good condition?
-
Please explain what is the issue.
-
Are the internal corners cleaned correctly?
-
Is the bead length and angle to standard?
-
Are the calibration checks completed?
Cell 8 - Cills
-
<br>Cill sampling of aesthetics?<br><br>
-
Are barrows and stillages in good condition?
-
Please explain what is the issue.
Cell 9 - Gearing and hanging doors
-
Are the gearing and hinges cut and fitted correctly?
-
Are the correct screws being used?
-
Is the gearing alignment check being completed?
-
Are the weather bars and end caps fitted correctly?
-
Is the coverage and hinges set correctly?
-
Are benches, stillages and machinery condition to standard?
-
Please explain what is the issue.
Cell 10 – Composite doors
-
Are the incoming slab checks being completed within 24hrs of delivery?
-
Are gearing and hinge alignment checks being completed?
-
Is the perimeter air gaps within tolerance?
-
Are the cassettes sealed correctly inside and outside?
-
Are QC checks being completed?
-
Are products being protected as specification?
-
Are benches and stillages in good condition?