Title Page
-
Prepared by
-
Conducted on
-
Shift
-
Day in rotation
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
-
Crew
- Crew 1
- Crew 2
- Crew 3
- Crew 4
- Straight Days
- Other
-
Department
- Ancillary
- Contractor
- Dewatering
- Maintenance
- Mill
- Mine
- Ore process
- Security
- Site admin
- Tech Services
-
Which Maint group
- Fixed
- Electrical
- Mobile
-
Which group
- Dispatch
- IT
- Operations
-
Which group
- Met lab
- Pads
- Plants
- Refinery
- Projects
-
Which group
- General Store
- Golf Course
- Day Care
- Hadley Maintenance
- Warehouse/Purchasing
- Clinic
-
Which group
- Accounting
- CI
- Environmental
- HR
- Management
- Safety
-
Which group
- Assay lab
- Projects
- Survey
- Sampling
- Geotech
- Hydrology
- Geology
- Exploration
-
Which contracting group
-
Location
VERIFICATION
Energy selection
-
Please select the energy system you are verifying
- Maintenance work on a pressurized system
- Live testing
-
What location
TRAINING
-
Can the tech communicate the steps for live testing
-
Do you feel the training you received for energy isolation is adequate
-
What is needed to make the training better
-
What hazards has the employee identified and controlled on this job?
INSPECTIONS
-
Are the components free from damage
-
Has the equipment been deemed safe to operate
PROCEDURES
-
Is the equipment in neutral and park brake applied
-
Are all areas cleared prior to start up
-
Are the ball studs being checked
-
Is the latest blue tooth technology being used to check movement on the ball studs
-
Does this live testing task require the equipment to move
-
Are barricades and/or spotters in place
-
Is the barricading effective to keep people out of the area
COMMUNICATIONS (SIGNS AND BARRICADES)
-
Is the live testing signage in place
-
Are the personal isolation tags in place
-
Are there only authorized personnel in the work area
-
Are barricades in place to control entry
-
Location
- Processing Plants
- Mill
- Dewatering
- Fixed Maintenance
- Maintenance Shops
- Leach Pads
-
Equipment
- Pumps (Carbon, solution, plant water/booster.)
- Carbon transfer system
- Fresh water system in the plant/Pad rinse
- Plant air (compressors.)
- Strip circuit, HX, vessel, discharge valves, blow-off
- Acid wash circuit, (caustic/nitric)
- Carbon truck pumps
- Floor sump pumps
-
Does the task involve stored energy? <br>(hydraulic, pneumatic, electric, mechanical, machinery, heat, gravity)
-
Is maintenance being done on this system?
INSPECTIONS/PM
-
Is this task PM work or corrective work?
-
Is the PM work order with the worker?
-
Is the PM being followed?
-
STOP THE JOB!
-
Have you applied energy isolation to any part of this task?
-
Is there a documented WPE or FLRA for this work area?
-
STOP THE JOB!
-
STOP THE JOB!
-
Have you applied energy isolation to any part of this task?
-
Is there a documented WPE or FLRA for this work area?
-
STOP THE JOB!
-
STOP THE JOB!
TRAINING
-
Have you worked on this system before?
-
Has it been explained to you by a competent person, how to isolate the system
-
Can the operator or mechanic explain the energy sources and controls in place for this task?
-
What energy isolation controls have been put in place?
- LOTOTO
- Valve Isolation
- Drain Pressure
- Blocked
-
Is there a better energy isolation system available for this task?
-
Please describe
EXPERIENCE
-
Is there a written standard for this task? <br>(SOP, Task Card, SWP, SPM, Manuel, PM, JHA, Cat SIS)
-
STOP THE JOB AND DO A JHA!
-
Is this task being completed at one of the ADR processing facilities?
-
Is the work release form complete?
COMMUNICATION
-
Has a GAPS conversation been discussed for this task
-
Are barricades in use?
-
Are the hazards clearly labeled?
-
Are multiple pieces of equipment being locked out for this task?
-
Is the lock out box form filled out and in place?
-
What is the Goal, Risk and Plan for this task?
-
Are barricades in use?
-
Are the hazards clearly labeled?
-
Are multiple pieces of equipment being locked out for this task?
-
Is the lock out box form filled out and in place?