Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location - Roof / Wall / Canopy -

Audit Details

  • Site/Job

  • Date & Time

1.0 PREVIOUS INSPECTION

  • 1.1 Has the last Inspection / Audit been reviewed?

  • 1.2 Are there any outstanding issues or actions from the last Audit

  • 1.3 What is the current area of works? Roof / Canopy / Both

2.0 Final Roof / Canopy Inspection

  • 2.1 Are all works installed to specification requirement's?

  • 2.4 Are there any works outside of the original scope

  • 2.3 ELD survey been completed

  • Are defects noted on ELD report completed.

3.0 CRS Installer details

  • 3.1 - Names of CRS installers who completed works

  • 3.2 - Are they on site during sign off

4.0 - General Notes on Install

  • 4.1 Any specific areas of concern -

  • 4.2 Have any details changed from drawings or specification to the install?

  • 4.3 Are there any damaged areas caused by others.

  • 4.4 Is there anything stopping CRS completing works during this mobilisation.

  • 4.5 Have all welds / laps been checked.

  • 4.6 Are all Penetrations' weathered and protected.

  • 4.7 Are all outlets sealed and with leaf guards installed

5.0 ADDITIONAL NOTES / PICTURE

  • 6.1 Additional notes / pictures

6.0 SIGN OFF - This confirms works are completed to an acceptable standard and work area handed back to client.

  • 7.1 CRS Supervisor / Installer

  • 7.2 CRS Manager

  • 7.3 Site Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.