Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location - Roof / Wall / Canopy -
Audit Details
-
Site/Job
-
Date & Time
1.0 PREVIOUS INSPECTION
-
1.1 Has the last Inspection / Audit been reviewed?
-
1.2 Are there any outstanding issues or actions from the last Audit
-
1.3 What is the current area of works? Roof / Canopy / Both
2.0 Final Roof / Canopy Inspection
-
2.1 Are all works installed to specification requirement's?
-
2.4 Are there any works outside of the original scope
-
2.3 ELD survey been completed
-
Are defects noted on ELD report completed.
3.0 CRS Installer details
-
3.1 - Names of CRS installers who completed works
-
3.2 - Are they on site during sign off
4.0 - General Notes on Install
-
4.1 Any specific areas of concern -
-
4.2 Have any details changed from drawings or specification to the install?
-
4.3 Are there any damaged areas caused by others.
-
4.4 Is there anything stopping CRS completing works during this mobilisation.
-
4.5 Have all welds / laps been checked.
-
4.6 Are all Penetrations' weathered and protected.
-
4.7 Are all outlets sealed and with leaf guards installed
5.0 ADDITIONAL NOTES / PICTURE
-
6.1 Additional notes / pictures
6.0 SIGN OFF - This confirms works are completed to an acceptable standard and work area handed back to client.
-
7.1 CRS Supervisor / Installer
-
7.2 CRS Manager
-
7.3 Site Manager