Title Page
-
IA 2016 001
-
Job Number
-
Conducted on
-
Location
-
Are all raised action from previous audit closed off
-
Select date
Scope
-
ISO9001:2008 CLAUSES
- 4.2.3 Document Control
- 7.1 Planning of Product Realisation
- 7.2 Customer Related Processes
- 7.3 Design and development
- 7.4 Purchasing
- 7.5 Production and Service Provision
- 8.2 Measurement and monitoring 8.2 Measurement and Monitoring
- 8.3 Control of non confirming product
- 8.4 Analysis of Data
- 8.5 Improvement
-
OHSAS18001:2007
- 4.3 Planning Requirements
- 4.4 Implementation Requirements
- 4.5 Checking Requirements
- 4.6 Review Requirements
-
Quality management system processes and procedures
- QSP OO1 Document control
- QSP 002 Estimation and contract initiation
- QSP 003 Customer feedback
- QSP 004 Management review
- QSP 005 internal audit
- QSP 006 Control of records
- QSP 008 corrective and preventive actions
- QSP 009 Account
- QSP 010 Design and development
- QSP 011 Purchasing
- QSP 012 Shipping and logistics
- QSP 013 Production control process
- QSP 013A production control process (steel)
- QSP 014 control of non-conforming product
- QSP 015 training and development
- QSP 016 measuring and calibration of equipment
- QSP 017 communication and awareness
- QSP 018 traceability and identification
- WDCW 001 fcp
- WQMS 001 FCP
-
OHSAS management system processes and procedures
- SHE 006 Incident reporting and emergency procedures
- SHE 007 Risk assessments
- SHE 009 Regulation and compliance
Compare Documents to Requirements
-
Is the Documentation compliant to ISO9001/OHSAS18001 and company procedures
-
NCR raised
NCR
-
NCR level
-
NCR number
-
Evidence or Notes, sheet reference numbers
-
Observations
-
Review any customer requirements that maybe applicable to this process. Does the Documentation meet these criteria
-
NCR raised
NCR
-
NCR level
-
NCR number
-
Evidence or Notes, sheet reference numbers
-
Observations
Compare actual practices vs requirements
-
Are all documents used correct version
-
NCR Raised
NCR
-
-
NCR number
-
Evidence notes and sheet reference number
-
Observations
-
Are all documents correctly completed and recorded
-
NCR Raised
NCR
-
-
NCR number
-
Evidence notes and sheet reference number
-
Observations
Corrective Actions
-
NCR Reference Numbers
-
Audit Completed by: