Information
-
Cheetham Salt WHS inspection template
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 Previous inspection
-
1.1 Has the last inspection been reviewed?
-
1.2 Are there no outstanding actions?
2.0 Policies
-
2.1 HSE policies must be communicated at least annually<br><br>Validation communications register or diary note. Needs to include a note of attendees
-
2.2 Current HSE policies must be displayed<br><br>Policies prominently displayed
-
2.3 Cardinal Safety Rules signed off by all employees<br><br>Sight sign off sheet
3.0 Legal and other requirements
-
3.1 Legal and other requirements communicated to all employees<br><br>Toolbox register or diary notes. Attendance needs to be noted.
4.0 Hazard Analysis and Assessment
-
4.1 Hazards for all areas have been identified and entered into the risk register<br><br>Review risk register
-
4.2 Plan in place to complete risk assessments<br><br>Review plan for risk assessments to be conducted in the month
-
4.3 Review machine guarding audits and risk assessments<br><br>Review audits and risk assessments
-
4.4 Changes made within the site have been risk assessed, communicated and controls implemented<br><br>Review completed assessments for identified changes since last review
-
4.5 Are relevant SOPs in place and have been reviewed in past 2 years
-
4.6 For non routine tasks, the JSA Process is used if no SOP exists<br><br>Review JSAs
-
4.7 Near Miss reporting culture in place<br><br>Review toolbox talks and tracking of near misses
5.0 Management Plans
-
5.1 Top 5 site risks identified and improvement plans for these developed and actively managed<br><br>Improvement plans communicated and reviewed by team. H&S reps and committee (where applicable)
-
5.2 Safety business plan<br><br>Site compliance calendar<br><br>
6.0 Operational Control
-
6.1 Operational controls must be in place to effectively manage/ control risk<br><br>Operational control standards and SOPs are readily available for High risk work. Review and understand effectiveness of operational controls that are in place and correlate to risk register.
-
6.2 JSA and work permits used for relevant high risk work including confined space entry, control of hot work, working at heights and excavation<br><br>Review understanding of JSAs and PTW. Review JSA & PTW records.<br><br>Review confined space entry, asbestos and working at heights<br>
-
6.3 Employees have been trained and use Isolation procedure/ LOTO properly<br><br>Review of training records and observations on site.
-
6.4 Employees trained in the handling, storage and disposal of hazardous chemicals including the correct use of PPE.<br><br>Review training records and observations on site.
-
6.5 Contractors are to provide copies of any safe work method statements, JSAs or alike. Additionally, they must undergo an induction before commencing work.
-
6.6 Adequate signage: mandatory, warning and informational
-
6.7 Assessment undertaken to identify safety signage and signage in place, clean and legible<br><br>Assessment record and signs in work area
7.0 Training
-
7.1 HSE training needs analysis and training scheduled and completed<br><br>Training matrix displayed and communicated to HSE committee.
-
7.2 Weekly departmental toolbox talks completed<br><br>Review training register and tool box talks
8.0 Communication and Consultation
-
8.1 Safety conversations are being completed<br><br>Review LEAN safety board
-
8.2 All workgroups represented by an HSR<br><br>Review HSE committee meeting minutes
-
8.3 Minutes of last HSE committee meeting have been communicated at toolbox talks<br><br>Diary note (manager to bring)
-
8.4 Manager undertaken inspections and discussion with safety reps<br><br>Diary note (manager to bring)
-
8.5 Safety Alerts are discussed at tool box talks<br><br>Recently issued alerts have been signed off and loaded onto SharePoint
-
8.6 Reps involved in trend improvement / risk reduction activities<br><br>Review Improvement projects and safety rep involvement.
9.0 Emergency response and crisis management
9.1 First Aid Facilities
-
9.1.1 Are cabinets and contents clean and orderly?
-
9.1.2 Are contents regularly checked?
-
9.1.3 No contents past their expiry date?
-
9.1.4 Cabinets clearly labelled?
-
9.1.5 Is there easy access to cabinets?
-
9.1.6 Employees aware of location of first aid cabinet?
-
9.1.7 Are first aid officers accessible?
-
9.1.8 First Aid/ CPR trained officers in place for each shift
-
9.1.9 Are emergency numbers displayed?
9.1.2 Fire Prevention
-
9.2.1 - Evacuation plan displayed and understood by all employees?
-
9.2.2 - Evacuation procedures discussed regularly? (3 to 4 times a year)
-
9.2.3 - Extinguishers in place, clearly marked for type of fire?
-
9.2.4 - Extinguishers recently serviced? (Check 6 monthly punch mark on tabs.)
-
9.2.5 - Extinguishers clear of obstructions?
-
9.2.6 - Extinguisher no more than 1200 mm max height & base not lower that 100 mm?
-
9.2.7 - Indicator signs 2.1 m above floor level?
-
9.2.8 - Adequate direction notices for fire exits?
-
9.2.9 - Exit doors easily opened from inside?
-
9.2.10 - Exits clear of obstructions?
-
9.2.11 - Fire alarm system functioning correctly?
-
9.2.12 - Fire Wardens trained and up to date<br><br>Site records
9.1.3 Emergency equipment and plans
-
9.3.1 Emergency equipment serviced within 6 months
-
9.3.2 - Emergency plan rehearsed bi-annually<br><br>Debriefing report feedback to HSE committee and tool box talks
10.0 Chemical Safety
-
10.1.1 Hazardous Substance Register complete and available?
-
10.1.2 Material Safety Data Sheets available for all chemicals?
-
10.1.3 Risk assessments completed for hazardous substances?
-
10.1.4 All containers labelled correctly?
-
10.1.5 - Unused substances disposed of?
-
10.1.6 Do special storage conditions apply?
-
10.1.7 If applicable are special storage conditions followed?
-
10.1.8 Workers trained in the use of hazardous substances?
-
10.1.9 If required is PPE available?
-
10.1.10 Is adequate ventilation provided?
-
10.1.11 Are eye washes and showers easily accessed?
-
10.1.12 People trained in spill control, exacuation wardens available for each shift
11.0 General Lighting and signage
-
11.1 Good natural lighting?
-
11.2 Reflected light from walls & ceilings not causing glare to employees?
-
11.3 Light fittings clean and in good condition?
-
11.4 Emergency exit lighting operable?
-
11.5 Emergency lights/ exit lights have been tested?
-
11.6 PPE signage visible and correct for area
12.0 Non conformance, corrective and preventative actions
-
12.1 incident and injuries reported as they occur, and investigation reports completed in a timely manner
-
12.2 All recordable injuries notified immediately and debriefed with site manager
-
12.3 HSE corrective actions closed out on time
13.0 GMP Audits
-
13.1 Planned GMP audits completed on time<br><br>Review monthly GMP audit <br>
-
13.2 Findings from GMP audit were completed
-
13.3 Manager participates in GMP audits
14.0 Building Safety
-
14.1 Floor surfaces even and uncluttered?
-
14.2 Entry and walkways kept clear?
-
14.3 Walkways adequately and clearly marked?
-
14.4 Intersections kept clear of boxes etc?
-
14.5 Stair and risers kept clear?
-
14.6 Are liquid spills removed quickly?
-
14.7 Are railings in good condition?
-
14.8 Are fall preventive measures in place and used where gaps occur in railings?
-
14.9 Are footpaths in good condition?
-
14.10 Furniture in sound condition?
-
14.11 Loading area clean and tidy?
15.0 Work Benches
-
15.1 Clear of rubbish?
-
15.2 Tools not in use kept in place?
-
15.3 No damaged hand tools in use?
-
15.4 No damaged power tools in use?
-
15.5 Work height correct for the type of work and the employee?
-
15.6 No sharp edges?
16.0 Injury Management
-
16.1 Injury notifications completed within timeframes<br><br>Review of actions
-
16.2 Site has a RTW coordinator<br><br>Training matrix shows status
-
16.3 Injury case management - weekly contact with employees off work, daily for employees on RTW program. Review 1 open claim.<br><br>Review rehab diary / case notes
-
16.4 Initial injury management process (including provider of medical services details) communicated to employees every 6 months<br><br>Communications/ training attendance register.
17.0 Storage Design and Use
-
17.1 Materials stored in racks and bins wherever possible?
-
17.2 Storage designed to minimise lifting problems?
-
17.3 Floors around racking clear of rubbish?
-
17.4 General condition of racks and pallets?
18.0 - Machines
-
18.1 - Are they kept clean?
-
18.2 - Are the floors around the machines kept clean?
-
18.3 - Guards in good condition?
-
18.4 - Starting and stopping devices within easy reach of operator?
-
18.5 - Waste/off cuts removed and stored safely?
-
18.6 - Drip pans on floor to prevent spillage?
-
18.7 - Adequate work space?
-
18.8 - Is lighting adequate?
-
18.9 - Noise levels controlled?
-
18.10 - No bending or stooping required?
-
18.11 - Duck-boards in good repair?
-
18.12 - Operators trained/inducted into the operation of the machines?
-
18.13 - Is the training recorded?
-
18.14 - Do operators comply with the training?
-
18.15 - Are lockout procedures implemented and followed?
-
18.16 - Are gas bottles secured?
19.0 - Electrical Safety
-
19.1 - Safety switches installed?
-
19.2 - Safety switches tested every 6 months and tests recorded?
-
19.3 - No double adapters in use?
-
19.4 - Portable equipment tested and tagged?
-
19.5 - No broken plugs, sockets or switches?
-
19.6 - No power leads across walkways?
-
19.7 - No frayed or damaged leads?
-
19.8 - No strained leads?
-
19.9 - Portable power tools in good condition?
-
19.10 - Where required are emergency shut-down procedures in place?
20.0 Occupational Health Controls
-
20.1 Employee health monitoring (skin, hearing, health assessment)
21.0 Ladders
-
21.1 - Are all ladders Industrial strength? (Non Household rated, check label.)
-
21.2 - Are ladders in good condition?
-
21.3 - If used for electrical work are they non conductive? (Wood or fibre glass.)
-
21.4 - Used according to instructions?
-
21.5 - For extension ladders are ropes, pulleys and treads in a good state of repair?
22.0 Contractor Management
-
22.1 Have contract drivers and companies completed inductions<br><br>Check contractor Induction register
23.0 - Office Hazards
-
23.1 - Condition of filing cabinets?
-
23.2 - Condition of chairs? (Five star bases.)
-
23.3 - Desks in good condition? (No damage.)
-
23.4 - Screen Based Equipment positioned to reduce glare from windows etc?
-
23.5 - Photocopiers positioned to avoid fumes?
-
23.6 - Tasks designed to prevent Occupational Overuse Syndrome? (Breaks included.)
-
23.7 - Air conditioning systems regularly maintained?
-
23.8 - Stable non-slip floor coverings in good condition?
24.0 - Vehicle / Mobile plant and Traffic Management
-
24.1 - Schedule maintenance performed?
-
24.2 - Condition of tyres?
-
24.3 - Brake performance?
-
24.4 - Lights? (Check operation of brake, indicator and reversing lights)
-
24.5 - Condition of drivers seat?
-
24.6 - Condition of other seats?
-
24.7 - First aid kit supplied and adequate?
-
24.8 Forklift prestart checks conducted
-
24.9 Defective items/ plant tagged out
-
24.10 Traffic Management plan in place
-
24.11 Designated driver area in place
Sign Off
-
On site representative
-
Auditor's signature