Title Page

  • Conducted on

  • Prepared by

  • Site

Arrive on site

  • Contact lone working buddy / WhatsApp group to inform them you have arrived

Perimeter Check

  • Walk around and inspect entire site, including grassed areas

  • Any signs of damage, vandalism, signs of rough sleeping?

  • Any signs of forced entry to the building

  • Clear rubbish to bins

Enter site via Stage Door

  • Check alarm logs. Note any errors

  • Check BMS is running, check event log. Note any issues (disregard equipment alarms for items intentionally shut down)

Fire Alarm Weekly Test

  • Date of test

  • MCP address

  • MCP triggered alarm?

  • Alarm / Voice announcement heard in foyers

  • Strobes working in bars

  • Alarm / Voice announcement heard in main auditorium

  • Strobe working in main auditorium

  • Alarm / Voice announcement heard backstage?

  • Both passenger lifts park at ground level

  • Prox doors release

  • BMS indicates fire state

  • Update Weekly Test Sheet in Fire Folder at Stage Door

  • Any notes

Building Inspection

  • Walk around entire site, note any issues

  • Any signs of forced entry?

  • Location of door

  • Can it be made safe and secure?

  • Any further work needed?

  • Any flooding, or signs of water dripping from radiators etc

  • Location of issue

  • Can it be isolated / made safe?

  • Is further work needed? Clean up required?

Plant Inspection

Roof Plant Area

  • Any signs of leaks, flooding, issues?

  • Location of issue

  • Can it be isolated / made safe?

  • Is further work needed? Clean up required

Follow Spot Box Plant Room

  • Any signs of leaks, flooding, issues?

  • Location of issue

  • Can it be isolated / made safe?

  • Is further work needed? Clean up required

Boiler Room

  • Any signs of leaks, flooding, issues?

  • Location of issue

  • Can it be isolated / made safe?

  • Is further work needed? Clean up required

  • All equipment dormant (unless in timed period of activity)?

  • Temp / pressure gauges on closed systems within ranges (for dormancy)?

Access Control System

  • WinPak PC running ok?

  • Check error log. Note any issues

Dormant Equipment

  • Run FoH lift from LF to Mezz (do not ride in lift)

  • Run BoH lift from LF to UF (do not ride in lift)

  • Any hydraulic leaks in platform lift cabinets?

Run 2x split air-conditioning units on heat & cool. Note locations.

  • Unit 1

  • Location

  • Unit 2

  • Location

Freezers - check running and contents still frozen

  • Ice Cream Parlour

  • Cloak Room

  • Main Kitchen (walk in fridge / freezer)

  • Cafe freezer

CCTV

  • Check NVR is running, check error log, check playback

  • All cameras connected?

  • Remote link to app working?

Meter Readings

  • Date of readings

Electricity - in LV Switch Room

  • Elec Rate 1

  • Elec Rate 2

  • Elec Import

  • Elec Cust Reg 1

  • Elec Cust Reg 2

  • Elec Total

Gas - Intake room, on large meter tank

  • Gas

Water - Intake room, meter next to isolation valve

  • Water sub meter

Finish work, exit site

  • Complete Lone Working Checklist. Scan and send to PS

  • Return all plant to dormant / timed state. Return all keys. Turn off all lighting. Lock all internal doors.

  • Set alarm, lock Stage Door

  • Update Lone Working WhatsApp group to say you are leaving site

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.