Information
-
Document No.
Caval Ridge Mine - Dragline Supervisor Inspection
-
Conducted By
-
Conducted on
-
Shift
-
Crew
-
Location
DRE17 Audit
Dragline - DRE17
Basic Information
-
Date and Time of Inspection
-
Location
- R10N
- R11N
- R12N
- R20N
- R30N
- R30S
- R35N
- R40N
- R40S
- R50N
- R50S
- R60N
- R60S
- R70S
-
Operators
Plan Compliance
-
Bench Width and RL on Design
-
Highwall Crest and Toe Position
-
Key Width as Designed
-
Lowwall Catch Berm as Designed
-
Lowwall Crest and Toe Position
-
Pit Position/Block Line
-
Compliant to 3D Dig Position / Page
-
Ramp Width and Grade
-
Coal Edge Correct
-
Sump in Place and Operational
-
Photos Taken of Hard Blast
-
Cable inspection complete
-
Berms - Exclusion zones correct? Comprised of competent material to stop the largest vehicle in circuit?
-
Parking - Dedication LV parking areas 50m outside of active mining areas?
-
Access - Signage to ensure positive communication and maximum separation achieved?
Dozer Requirements
-
Key Pushed Down / Dozer on Wall
-
Bunding in Place to Standard
-
Drainage Installed
-
Bench Prep Completed
-
Machine White Board Completed
-
Elevated Bench Pushed Off
General Comments
-
General Comments
DRE18 Audit
Dragline - DRE18
Basic Information
-
Date and Time of Inspection
-
Location
- R10N
- R11N
- R12N
- R20N
- R30N
- R30S
- R35N
- R40N
- R40S
- R50N
- R50S
- R60N
- R60S
- R70S
-
Operators
Plan Compliance
-
Bench Width and RL on Design
-
Highwall Crest and Toe Position
-
Key Width as Designed
-
Lowwall Catch Berm as Designed
-
Lowwall Crest and Toe Position
-
Pit Position/Block Line
-
Compliant to 3D Dig Position / Page
-
Ramp Width and Grade
-
Coal Edge Correct
-
Sump in Place and Operational
-
Photos Taken of Hard Blast
-
Cable inspection complete
-
Berms - Exclusion zones correct? Comprised of competent material to stop the largest vehicle in circuit?
-
Parking - Dedication LV parking areas 50m outside of active mining areas?
-
Access - Signage to ensure positive communication and maximum separation achieved?
Dozer Requirements
-
Key Pushed Down / Dozer on Wall
-
Bunding in Place to Standard
-
Drainage Installed
-
Bench Prep Completed
-
Machine White Board Completed
-
Elevated Bench Pushed Off
General Comments
-
General Comments
DRE34 Audit
Dragline - DRE34
Basic Information
-
Date and Time of Inspection
-
Location
- R10N
- R11N
- R12N
- R20N
- R30N
- R30S
- R35N
- R40N
- R40S
- R50N
- R50S
- R60N
- R60S
- R70S
-
Operators
Plan Compliance
-
Bench Width and RL on Design
-
Highwall Crest and Toe Position
-
Key Width as Designed
-
Lowwall Catch Berm as Designed
-
Lowwall Crest and Toe Position
-
Pit Position/Block Line
-
Compliant to 3D Dig Position / Page
-
Ramp Width and Grade
-
Coal Edge Correct
-
Sump in Place and Operational
-
Photos Taken of Hard Blast
-
Cable inspection complete
-
Berms - Exclusion zones correct? Comprised of competent material to stop the largest vehicle in circuit?
-
Parking - Dedication LV parking areas 50m outside of active mining areas?
-
Access - Signage to ensure positive communication and maximum separation achieved?
Dozer Requirements
-
Key Pushed Down / Dozer on Wall
-
Bunding in Place to Standard
-
Drainage Installed
-
Bench Prep Completed
-
Machine White Board Completed
-
Elevated Bench Pushed Off
General Comments
-
General Comments
DRE35 Audit
Dragline - DRE35
Basic Information
-
Date and Time of Inspection
-
Location
- R10N
- R11N
- R12N
- R20N
- R30N
- R30S
- R35N
- R40N
- R40S
- R50N
- R50S
- R60N
- R60S
- R70S
-
Operators
Plan Compliance
-
Bench Width and RL on Design
-
Highwall Crest and Toe Position
-
Key Width as Designed
-
Lowwall Catch Berm as Designed
-
Lowwall Crest and Toe Position
-
Pit Position/Block Line
-
Compliant to 3D Dig Position / Page
-
Ramp Width and Grade
-
Coal Edge Correct
-
Sump in Place and Operational
-
Photos Taken of Hard Blast
-
Cable inspection complete
-
Berms - Exclusion zones correct? Comprised of competent material to stop the largest vehicle in circuit?
-
Parking - Dedication LV parking areas 50m outside of active mining areas?
-
Access - Signage to ensure positive communication and maximum separation achieved?
Dozer Requirements
-
Key Pushed Down / Dozer on Wall
-
Bunding in Place to Standard
-
Drainage Installed
-
Bench Prep Completed
-
Machine White Board Completed
-
Elevated Bench Pushed Off
General Comments
-
General Comments
Signoff
-
Other Comments
-
Add signature