Information

  • Document No.

Caval Ridge Mine - Dragline Supervisor Inspection

  • Conducted By

  • Conducted on

  • Shift

  • Crew

  • Location

DRE17 Audit

Dragline - DRE17

Basic Information

  • Date and Time of Inspection

  • Location

  • Operators

Plan Compliance

  • Bench Width and RL on Design

  • Highwall Crest and Toe Position

  • Key Width as Designed

  • Lowwall Catch Berm as Designed

  • Lowwall Crest and Toe Position

  • Pit Position/Block Line

  • Compliant to 3D Dig Position / Page

  • Ramp Width and Grade

  • Coal Edge Correct

  • Sump in Place and Operational

  • Photos Taken of Hard Blast

  • Cable inspection complete

  • Berms - Exclusion zones correct? Comprised of competent material to stop the largest vehicle in circuit?

  • Parking - Dedication LV parking areas 50m outside of active mining areas?

  • Access - Signage to ensure positive communication and maximum separation achieved?

Dozer Requirements

  • Key Pushed Down / Dozer on Wall

  • Bunding in Place to Standard

  • Drainage Installed

  • Bench Prep Completed

  • Machine White Board Completed

  • Elevated Bench Pushed Off

General Comments

  • General Comments

DRE18 Audit

Dragline - DRE18

Basic Information

  • Date and Time of Inspection

  • Location

  • Operators

Plan Compliance

  • Bench Width and RL on Design

  • Highwall Crest and Toe Position

  • Key Width as Designed

  • Lowwall Catch Berm as Designed

  • Lowwall Crest and Toe Position

  • Pit Position/Block Line

  • Compliant to 3D Dig Position / Page

  • Ramp Width and Grade

  • Coal Edge Correct

  • Sump in Place and Operational

  • Photos Taken of Hard Blast

  • Cable inspection complete

  • Berms - Exclusion zones correct? Comprised of competent material to stop the largest vehicle in circuit?

  • Parking - Dedication LV parking areas 50m outside of active mining areas?

  • Access - Signage to ensure positive communication and maximum separation achieved?

Dozer Requirements

  • Key Pushed Down / Dozer on Wall

  • Bunding in Place to Standard

  • Drainage Installed

  • Bench Prep Completed

  • Machine White Board Completed

  • Elevated Bench Pushed Off

General Comments

  • General Comments

DRE34 Audit

Dragline - DRE34

Basic Information

  • Date and Time of Inspection

  • Location

  • Operators

Plan Compliance

  • Bench Width and RL on Design

  • Highwall Crest and Toe Position

  • Key Width as Designed

  • Lowwall Catch Berm as Designed

  • Lowwall Crest and Toe Position

  • Pit Position/Block Line

  • Compliant to 3D Dig Position / Page

  • Ramp Width and Grade

  • Coal Edge Correct

  • Sump in Place and Operational

  • Photos Taken of Hard Blast

  • Cable inspection complete

  • Berms - Exclusion zones correct? Comprised of competent material to stop the largest vehicle in circuit?

  • Parking - Dedication LV parking areas 50m outside of active mining areas?

  • Access - Signage to ensure positive communication and maximum separation achieved?

Dozer Requirements

  • Key Pushed Down / Dozer on Wall

  • Bunding in Place to Standard

  • Drainage Installed

  • Bench Prep Completed

  • Machine White Board Completed

  • Elevated Bench Pushed Off

General Comments

  • General Comments

DRE35 Audit

Dragline - DRE35

Basic Information

  • Date and Time of Inspection

  • Location

  • Operators

Plan Compliance

  • Bench Width and RL on Design

  • Highwall Crest and Toe Position

  • Key Width as Designed

  • Lowwall Catch Berm as Designed

  • Lowwall Crest and Toe Position

  • Pit Position/Block Line

  • Compliant to 3D Dig Position / Page

  • Ramp Width and Grade

  • Coal Edge Correct

  • Sump in Place and Operational

  • Photos Taken of Hard Blast

  • Cable inspection complete

  • Berms - Exclusion zones correct? Comprised of competent material to stop the largest vehicle in circuit?

  • Parking - Dedication LV parking areas 50m outside of active mining areas?

  • Access - Signage to ensure positive communication and maximum separation achieved?

Dozer Requirements

  • Key Pushed Down / Dozer on Wall

  • Bunding in Place to Standard

  • Drainage Installed

  • Bench Prep Completed

  • Machine White Board Completed

  • Elevated Bench Pushed Off

General Comments

  • General Comments

Signoff

  • Other Comments

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.