Page 1: Initial questions
-
Conducted on
-
Prepared by
-
Location
-
Dig Unit
Overburden Excavator Checklist
WORK AREA
HSEC
-
Have there been any safety issues/Incidents on shift?
-
Are all the COVID controls being adhered to (cribhuts/LV/mobile equipment?)
-
Communication of the OCE Report and unknown hazards/conditions
-
Have clear instructions been communicated to CMWs on relevant tasks
-
Are there any JSAs in place, if yes is it signed off by all operators and OCE if applicable
-
All light vehicles pre-starts complete and submitted
Random Fatigue Check
-
Operator 1
-
Machine ID
-
Time
-
Response
-
Operator 2
-
Machine ID
-
Time
-
Response
Exposed Edge Protection Confirmation
-
Has any safety berm, high risk berm or catch berm been removed during the shift? If yes, was authorisation sought from area supervisor?
-
Comment
-
If the bund has not been installed before end of shift, has the action been passed onto oncoming supervisors
Haul Roads and Ramps
-
Traffic signage in place and maintained?
-
Are all Haul roads complaint (eg High Risk bunds, width 35m, Grade 10%, adequately maintained )
-
Does the circuit have proper drainage and correct cambers?
-
Road surface condition- does it need to be scarified to remove the shine/ smooth
-
Do haul roads have maximum standard 4% cross. Grade?
-
Are all cross grades complaint and not identified as “non complaint “ in the monthly cross grade report in the circuit?
-
For in-pit roads on coal benches with a cross fall between 4-8%, what controls are in place to adequately manage the hazard
-
Corner cambers in place and centre bunding on downhill high speed
-
Delineation in place? ( height between 1.5-2.4m, 100m spacing on straights, 50m spacing at corners)
Bench and Loading area
-
Excavators- dig face less then cab height, dig bench less the 4m
-
If no, what are the controls?
-
Angle/grade of the dig bench, is it flat/level?
-
If no, what are the controls?
-
Lighting plants setup and have the appropriate bundling and delineation in place?
-
Designated LV park up area established and maintained?
-
AMAs in place with bundling and clear visibility?
-
Open Edges- Have you checked that the required controls are in place and are effective above and below dig units
-
Is pit edge and high wall standoff bundling adequate?
-
Is drill prep required ready for D&B?
-
High wall cracking or water issues evident?
-
Are the work area being excavated to design?
-
Comments:
Dump Area
-
Authorised dump plan in place on design?
-
Is the dump square? eg 90degree corners?
-
Is the dump face straight? Not rounded?
-
Area dump heights no more than 20m and if so, is dumping short and dozing occurring?
-
What other controls are in place?
-
Are trucks and dozers complying with correct dumping requirements with maintaining separation? (Eg positive communications with dump dozer, not using tip head as a stop?
-
AMAs in place with bundling and clear visibility?
-
Designated LV park up area has been established and maintained?
-
Is water present at the toe of the dump and if so, is dump short and dozing occurring?
-
Lighting plants set up and have the appropriate bundling and delineation in place?
-
Access to the toe of all dumps are bundled off to all traffic?
-
Are the dump bund walls a minimum half wheel height to the largest vehicle on circuit?
-
Is a JSA in place?
-
Can the dump manage rejects? If no why?
-
Has a prestart been completed for lighting plants as per site CVM CHL mobile lighting plant / Generator Prestart inspection checklist?
New Work Area and Relocations
-
If relocating within the next 24hrs, has the route been inspected and discussed with operator?
-
If relocating in the next 24hrs, has the area been inspected and made compliant?
-
Have intersection checklists been completed?
Crib hut Area Housekeeping
-
Is there a high risk bund between truck park and crib hut ?
-
Has housekeeping of the crib huts been completed?
-
Is the crib hut stocked for the next shift? (Water, coffee, milk, earplugs etc)
-
Are all medium and LV park ups compliant?
-
Crib hut compliance checklist completed? ( First aid kit, Fire Extinguisher, Electrical test and tag)
-
Crib hut/ Go line adequate?
-
Has prestart been completed for the generator as per CVM CHL Mobile lighting plant / Generator Prestart inspection checklist CVM-CHL-0045
Water Truck Management
-
Water trucks communicating with haul truck operators when entering circuit?
-
Have the Water Truck Operators reduced watering (rate) approximately 30m before inspections, stop signs and access points.
-
Has the water truck operator communicated the “DRY LINE” and “WATERED LINE”?
-
NIGHT SHIFT OPERATIONS- has the water truck been parked up by 10pm?
Water Truck Observation
-
Water truck observation
-
Time completed
-
Water truck observation
-
Time completed
-
Water truck observation
-
Time completed
In-pit Refueling bays
-
Has the input bay been established on or near the circuit and operational for hot seat change overs?
-
If not why?
-
Has the in pit refuelling bay location been communicated to the service person?
-
Is the refuelling bay been built to site standard?
Circuit location/ Dump inspection times
-
Excavator circuit
-
Time inspection completed
-
Dump location & Time
-
Dump location & Time
-
Dump location & Time
Sign off
-
Date
-
Signature