Title Page

  • Technicians Full Name:

  • Conducted on

  • Address

PFM RETICULATION INSPECTION SHEET

Confirmation of Nominated Watering Days - (Tick the days applicable to Site)

  • Monday

  • Tuesday

  • Wednesday

  • Thursday

  • Friday

  • Saturday

  • Sunday

  • Work Task ?

  • Overview of Works required:

  • REAC01 Reset or adjust controller times or shutdown for winter

  • Quantity required

  • REAS01 Adjust or clear sprinkler filter and nozzle

  • Quantity required

  • RECR01 Replace or SAI poly cap to cap off riser or pipe (up to 25 mm diameter)

  • Quantity required

  • REGD01 Replace or SAI Hunter PGP gear driven sprinkler

  • Quantity required

  • REGD02 Replace or SAI Hunter PGJ gear driven sprinkler

  • Quantity required

  • REGD03 Replace or SAI Nelson MP3000 sprinkler

  • Quantity required

  • REHD01 Labour for hard digging

  • Quantity required

  • REIN01 Replace or SAI nozzle to standard pop-up sprinkler

  • Quantity required

  • REIR01 Inspect and report

  • Quantity required

  • RELR01 Non-Scheduled Labour

  • Quantity required

  • RELS01 Locate and uncover solenoid or gate valve (minimum 1/2 hour to maximum 1 hour)

  • Quantity required

  • REMS01 Replace or SAI micro spray cap adaptor

  • Quantity required

  • REMS02 Replace or SAI micro spray rigid riser stem with take off adaptor

  • Quantity required

  • REMS03 Replace or SAI micro spray

  • Quantity required

  • REPU01 Replace or SAI standard domestic pop-up sprinkler

  • Quantity required

  • RERC01 Replace or SAI reticulation controller (up to and including 6 stations)

  • Quantity required

  • RERC02 Replace or SAI reticulation controller (from 7 up to and including 9 stations)

  • Quantity required

  • RERC03 Replace or SAI reticulation controller (from 10 up to and including 15 stations)

  • Quantity required

  • RERL01 Repair water leak to poly pipe

  • Quantity required

  • RERL02 Repair water leak to PVC pipe (up to and including 40 mm diameter)

  • Quantity required

  • RERR01 Replace or SAI riser (up to and including 25 mm diameter and up to 155 mm length)

  • Quantity required

  • RERT01 Replace or SAI 240 V electrical plug-in transformer

  • Quantity required

  • RERW01 Locate and repair break in reticulation wiring to solenoid coil (maximum 1 hour)

  • Quantity required

  • RESA01 Replace or SAI shrub adaptor or border spray

  • Quantity required

  • RESC01 Replace solenoid coil

  • Quantity required

  • RESS01 Replace or SAI concrete sprinkler surround

  • Quantity required

  • RESV01 Replace or SAI solenoid valve (up to and including 25 mm diameter)

  • Quantity required

  • RETO01 Travel and Overhead (Fixed)

  • Quantity required

  • RETR01 Test reticulation system (up to and including 8 stations)

  • Quantity required

  • RETR02 Test reticulation system (over 8 stations)

  • Quantity required

  • REVB01 Replace or SAI 150 mm round valve box cover

  • Quantity required

  • Would the above identified remedial works be estimated to exceed $450 excluding GST?

  • Any other works required ? E.g. Meter Box Lock Broken or additional Comments:

I confirm that the above identified remedial works are required to restore the reticulation system back to full operation.

  • Name / Signature

  • Before and After Photos (if required)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.